SHIV ASPIRE
By VIAN UNITY
RG-MH-72800 · RERA P53100053068 · Last updated on MahaRERA portal: 27 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- Rs 0.75 crore secured on the land, in favour of Shri Vasantrao Chougule Nagari Sahakari Pathsantha Ltd Kolhapur
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIV ASPIRE is a Others project by VIAN UNITY in Sangli, Maharashtra, registered with MahaRERA as P53100053068 on 12 Oct 2023. Possession was promised by 18 Apr 2026 and is now 6 months past that date. 17 of the 25 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSHIV ASPIRE
- TypeOthers
- Location
- SHINDE MALA SANGLI
- SHINDE MALA
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100053068
- ReraGenie IDRG-MH-72800
Builder
- NameVIAN UNITY
- Entity typePartnership
- PartnersMADHU BHIMRAO BHASME, surabhi mohit chougule
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 Oct 2023
- Promised completion18 Apr 2026
- Revised completionNone
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 27 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHIV ASPIRE | NA | 5 | 5 | 20 | 5 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SHIV ASPIRE: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed67
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHIV ASPIRE | NA | Rs 3.31 cr | Rs 2.65 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | mohit chaugule |
| Engineer | viraj b patil |
| Chartered Accountant | SHITAL N SHANKARGOUDA |
| Chartered Accountant | SHITAL NEMINATH SHANKARGOVDA |
| Partner | Role in project |
|---|---|
| VIAN UNITY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (2) (1).pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (2) (1).pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: Form1 30-6-2025.pdf | 24 Jan 2026 |
| Withdrawal Update Form 2File: form 2 30-6-2025.pdf | 24 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 30-6-2025.pdf | 24 Jan 2026 |
| Form 1File: Form 1 - Architects Certificate March 2025.pdf | 23 Jan 2026 |
| Form 2File: Form 2 - Engineers Certificate March 2025.pdf | 23 Jan 2026 |
| Form 3File: Form 3 - Vian Unity 31-03-25.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR NO 29 SOLD BOOKED March 25.pdf | 23 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate Dec-24.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Vian Unity 31-12-2024_compressed.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate Dec-24.pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR NO 29 SOLD BOOKED Dec-24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate June 24.pdf | 2 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Sep 24.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vian Unity 30-6-24_compressed.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vian Unity 30-9-24_compressed.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate June 2024.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Sep 2024.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR NO 29 SOLD BOOKED June 24.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR NO 29 SOLD BOOKED Sep 24.pdf | 2 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 VIAN UNITY 23 24.pdf | 2 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architects Certificate December 2023.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Architects Certificate March 2024.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate December 2023 REV.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate March 2024 REV.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 4 CIRCULAR NO 29 SOLD BOOKED December 23.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 4 CIRCULAR NO 29 SOLD BOOKED March 24.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Vian Unity 31-12-23.pdf | 16 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Vian Unity 31-3-24.pdf | 16 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: no encumbrance certificate - legal.pdf | 18 Aug 2023 |
| Details of encumbrances concerned to LegalFile: no encumbrance certificate - legal.pdf | 18 Aug 2023 |
| Layout approvalFile: plot map.pdf | 21 Jul 2023 |
| Building plan approvalFile: dwg.pdf | 21 Jul 2023 |
| PAN CardFile: Vian unity PAN.pdf | 21 Jul 2023 |
| Copy of the legal title reportFile: legal title report.pdf | 21 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: non encumbrance certificate_compressed.pdf | 21 Jul 2023 |
| Details of encumbrances concerned to LegalFile: non encumbrance certificate_compressed.pdf | 21 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: plot map.pdf | 21 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf | 21 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: building permission certificate.pdf | 21 Jul 2023 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 21 Jul 2023 |
| Declaration in FORM BFile: form b.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf | 21 Jul 2023 |
| CERSAI detailsFile: undertaking.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Vian Unity_compressed27072023.pdf | 21 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN ORDER REAL ESTATE ORG - ANURAG BEDAGE.pdf | 21 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN ORDER REAL ESTATE ORG - MADHU BHASME.pdf | 21 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN ORDER REAL ESTATE ORG - SURABHI CHAUGULE.pdf | 21 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN ORDER REAL ESTATE ORG - VIRAJ BALASAHEB PATIL.pdf | 21 Jul 2023 |
| Proforma of Allotment letterFile: allotment letter final.pdf | 21 Jul 2023 |
| Proforma of Agreement for saleFile: AGREEMENT TO SALE Draft 26092023.pdf | 21 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: formant a.pdf | 21 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: no deviation certificate.pdf | 21 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: no deviation certificate AGREEMNT.pdf | 21 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHIV ASPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHINDE MALA790+ in Sangli
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: VIAN UNITY
VIAN UNITY has 1 registration on MahaRERA, including SHIV ASPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What does it mean that SHIV ASPIRE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHIV ASPIRE is delayed beyond 18 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIV ASPIRE?
The registered promoter entity is VIAN UNITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIV ASPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIV ASPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIV ASPIRE?
The professionals named in the filing: Architect: mohit chaugule; Engineer: viraj b patil; Chartered Accountant: SHITAL N SHANKARGOUDA; Chartered Accountant: SHITAL NEMINATH SHANKARGOVDA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIV ASPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback