ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHIV ANSH

Registered No litigation declared Residential / Group Housing project

SHIV ANSH

By Sudhir Gulati

RG-MH-66928 · RERA P52000047973 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 44 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Nov 2029Possession promisedmoved 44 months from the original
4 of 10Construction stages donefurthest along: Slabs of Super Structure, 75%
16 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SHIV ANSH is a Residential / Group Housing project by Sudhir Gulati in Raigarh, Maharashtra, registered with MahaRERA as P52000047973 on 2 Dec 2022. Possession is promised by 30 Nov 2029. The completion date has moved by 44 months from the original filing. 8 of the 24 units on this registration are recorded sold or booked, and 4 of 10 construction stages are filed complete.

At a glance

Project

  • NameSHIV ANSH
  • TypeResidential / Group Housing
  • Location
    • PLOT 169A
    • SECTOR 10
    • KOPRA
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000047973
  • ReraGenie IDRG-MH-66928

Builder

  • NameSudhir Gulati
  • Entity typeIndividual
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2022First promiseMar 2026Revised toNov 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Dec 2022
  • Promised completion30 Nov 2029
  • Revised completionRevised to 30 Nov 2029 (originally 15 Mar 2026)
  • Buildings1 building record
  • Documents filed95 files

Current status

33%8 of 24 units booked
45.6%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shiv AnshNA141224024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

Shiv Ansh: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Stack Parking16

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area865 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jan 2026

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI1279.21
Proposed, not sanctioned1,279 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SHOP NO. 5&6, MORAJ RESIDENCY, PLOT NO. 1, SECTOR - 16, SANPADA, NAVI MUMBAI- 400705, TOLL FREE NO. 18004194332
Estimated costRs 9.88 cr
Cost incurredRs 4.50 cr
Work done45.57%
BuildingWingEstimatedIncurred
Shiv AnshNARs 9.88 crRs 4.50 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD G SHAH & ASSOCIATES
EngineerBAHUBALI DHAMANE
EngineerNitin M Pakhare
Chartered AccountantDIVYESH DOSHI
Chartered AccountantVikas Gudadinni
PartnerRole in project
SHIV ESTATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20022619915Mar 2026 → Nov 2029

Reason as filed by the promoterSubsequent to earlier approvals, the Promoter has received a Revised and Amended Commencement Certificate dated 08/12/2025 (Ref. No. CIDCO/BP-17637/TPO (NM & K)/2020/11732) approving construction up to G+13 upper floors, thereby materially enhancing and expanding the originally sanctioned project scope. Owing to the approval of additional upper floors, the overall quantum of construction, engineering coordination, procurement, execution timelines, and statutory compliances has substantially increased, necessitating additional time for orderly and compliant completion. The requirement for exten

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2029

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - June 26.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 - June 26.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 - June 2026.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 - Mar 26.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 - Mar 26.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - Mar 26.pdf17 Apr 2026
Building plan approvalFile: Revised Plan - Highlighted.pdf16 Jan 2026
Withdrawal Update Form 1File: Form 1 - Dec 25.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2 - Dec 25.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Dec 25.pdf16 Jan 2026
Form 1File: 1 Form 1 - Dec 22.pdf22 Dec 2025
Form 2File: 2 Form 2 - Dec 22.pdf22 Dec 2025
Form 3File: 2 Form 3 - Dec 22.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 Sold Booked - Dec 22.pdf22 Dec 2025
Form 1File: 2 Form 1 - Mar 23.pdf22 Dec 2025
Form 2File: 3 Form 2 - Mar 23.pdf22 Dec 2025
Form 3File: 3 Form 3 - Mar 23.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 2 Sold Booked - Mar 23.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 3 Sold Booked - June 23.pdf22 Dec 2025
Form 1File: 3 Form 1 - June 23.pdf22 Dec 2025
Form 2File: 4 Form 2 - June 23.pdf22 Dec 2025
Form 3File: 4 Form 3 - June 23.pdf22 Dec 2025
Form 3File: 5 Form 3 - Sept 23.pdf22 Dec 2025
Form 2File: 4 Form 2 - Sept 23.pdf22 Dec 2025
Form 1File: 4 Form 1 - Sept 23.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Booked - Sept 23.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 5 Sold Booked - Dec 23.pdf22 Dec 2025
Form 1File: 5 Form 1 - Dec 23.pdf22 Dec 2025
Form 2File: 5 Form 2 - Dec 23.pdf22 Dec 2025
Form 3File: 6 Form 3 - Dec 23.pdf22 Dec 2025
Form 3File: 7 Form 3 - Mar 24.pdf22 Dec 2025
Form 2File: 6 Form 2 - Mar 24.pdf22 Dec 2025
Form 1File: 6 Form 1 - Mar 24.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 6 Sold Booked - Mar 24.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 7 Sold Booked - June 24.pdf22 Dec 2025
Form 1File: 7 Form 1 - June 24.pdf22 Dec 2025
Form 2File: 7 Form 2 - June 24.pdf22 Dec 2025
Form 3File: 8 Form 3 - June 24.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 8 Sold Booked - Sept 24.pdf22 Dec 2025
Form 1File: 8 Form 1 - Sept 24.pdf22 Dec 2025
Form 2File: 8 Form 2 - Sept 24.pdf22 Dec 2025
Form 3File: 9 Form 3 - Sept 24.pdf22 Dec 2025
Form 1File: 9 Form 1 - Dec 24.pdf22 Dec 2025
Form 2File: 9 Form 2 - Dec 24.pdf22 Dec 2025
Form 3File: 10 Form 3 - Dec 24.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 9 Sold Booked - Dec 24.pdf22 Dec 2025
Form 1File: 10 Form 1 - Mar 25.pdf22 Dec 2025
Form 2File: 10 Form 2 - Mar 25.pdf22 Dec 2025
Form 3File: 11 Form 3 - Mar 25.pdf22 Dec 2025
Disclosure of Sold and Booked InventoryFile: 10 Sold Booked - Mar 25.pdf22 Dec 2025
Form 2A (FY 2022-2023)File: Form 2A - 22-23.pdf22 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A - 23-24.pdf22 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A - 24-25.pdf22 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf22 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf22 Dec 2025
Withdrawal Update Form 1File: Form1 30925 shivansh.pdf19 Oct 2025
Withdrawal Update Form 2File: Form2 30925 shivansh.pdf19 Oct 2025
Withdrawal Update Form 3File: Form3 30925 shivansh.pdf19 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf13 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 31325 shivansh.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 31325 Shiv ansh.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 31325 shivansh.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: SHIVANSHDisclosureofsoldinventory31325.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 311224 shivansh.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 311224 Shiv ansh.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 311224 shiv ansh.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: SHIVANSHDisclosureofsoldinventory311224.pdf19 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SHIVANSHdisclosureofinterest.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: SHIVANSHDisclosureofsoldinventory30924.pdf6 Nov 2024
CERSAI detailsFile: SHIVANSHcersai details30924.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5ShivAnsh 30924.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shiv Ansh Rera Form 5.pdf11 Mar 2024
Proforma of Agreement for saleFile: 2 Proforma of Agreement for sale (1).pdf14 Nov 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION LETTER SCAN COPY.pdf14 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE OC CIDCO_compressed.pdf15 Oct 2022
Proforma of Allotment letterFile: rera scan_compressed.pdf29 Sep 2022
Deviation Report with respect to Allotment letterFile: deviation letter.pdf29 Sep 2022
Layout approvalFile: layout.pdf19 Sep 2022
Building plan approvalFile: shiv ansh floor plans.pdf19 Sep 2022
Copy of Layout Approval (in case of layout)File: layout.pdf19 Sep 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shiv AasthaUlwe34CompletedApr 2019Jun 2018
Shiv ShreyaUlwe36CompletedSep 2017Dec 2016

How this compares with Raigarh

33%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 44 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV ANSH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOPRA5,900+ in Raigarh

2 kmSHIV ANSHCompleted 19Lapsed / revoked 3Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: Sudhir Gulati

Sudhir Gulati has 1 registration on MahaRERA, including SHIV ANSH. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHIV ANSH is delayed beyond 30 Nov 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV ANSH?

The registered promoter entity is Sudhir Gulati, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV ANSH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV ANSH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV ANSH?

The professionals named in the filing: Architect: D G SHAH & ASSOCIATES; Engineer: BAHUBALI DHAMANE; Engineer: Nitin M Pakhare; Chartered Accountant: DIVYESH DOSHI; Chartered Accountant: Vikas Gudadinni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV ANSH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV ANSH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV ANSH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.