Home / Browse projects / Pune, Maharashtra / Shine City Phase V
Shine City Phase V
By Namoh Builders and Developers
RG-MH-83462 · RERA P52100080761 · Last updated on MahaRERA portal: 25 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shine City Phase V is a Others project by Namoh Builders and Developers in Pune, Maharashtra, registered with MahaRERA as P52100080761 on 3 Jul 2025. Possession is promised by 31 Dec 2029.
At a glance
Project
- NameShine City Phase V
- TypeOthers
- Location
- Gut No. 1195
- 1196
- 1197
- Chikhali
- Haveli
- Pune
- 412114
- Pincode412114
- RERA no.P52100080761
- ReraGenie IDRG-MH-83462
Builder
- NameNamoh Builders and Developers
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jul 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
A Wing: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed316
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership100
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Vaishali Sanjay Kunjir | Dhankawadi | Pune |
| Rupali Sachin Kokate | Pimpri Chinchawad (M Corp.) | Pune |
| Haisabai Kondiba Gawade | Pimpri Chinchawad (M Corp.) | Pune |
| Baban Laxman More | Chikhali | Pune |
| Krushna Hiraman More | Chikhali | Pune |
| Neelam Santosh Gade | Chikhali | Pune |
| Latabai Vishnu More | Chikhali | Pune |
| Tanaya Vishnu More | Chikhali | Pune |
| Ananda Vishnu More | Chikhali | Pune |
| Balasaheb Laxman More | Chikhali | Pune |
| Gangubai Sadashiv More | Chikhali | Pune |
| Balasaheb Sadashiv More | Chikhali | Pune |
| Sunanda Balasaheb More | Chikhali | Pune |
| Sheetal Balasaheb More | Chikhali | Pune |
| Reshma Dilip Tavare | Chikhali | Pune |
| Pandurang Sadashiv More | Chikhali | Pune |
| Pooja Pandurang More | Chikhali | Pune |
| Prashant Pandurang More | Chikhali | Pune |
| Priyanka Rohidas Gaikwad | Chikhali | Pune |
| Jalindar Sadashiv More | Chikhali | Pune |
| Sangeeta Jalinder More | Chikhali | Pune |
| Akshay Jalinder More | Chikhali | Pune |
| Aruna Manohar Gaikwad | Kuruli | Pune |
| Anjana Sanjay Kalokhe | DEHU | Pune |
| Parubai Narayan More | Chikhali | Pune |
| Kaluram Narayan More | Chikhali | Pune |
| Ratnamala Kaluram More | Chikhali | Pune |
| Ashok Kaluram More | Chikhali | Pune |
| Sarika Ganesh Nevale | Chikhali | Pune |
| Sopan Narayan More | Chikhali | Pune |
| Sangeeta Sopan More | Chikhali | Pune |
| Rohit Sopan More | Chikhali | Pune |
| Sindhubai Kisan Rakshe | Salumbare | Pune |
| Sushila Eknath Shelke | Chikhali | Pune |
| Alka Suresh Nanekar | Chakan (CT) | Pune |
| Lilabai Mahadu More | Chikhali | Pune |
| Shankar Mahadu More | Chikhali | Pune |
| Asha Shankar More | Chikhali | Pune |
| Nutan Shankar More | Chikhali | Pune |
| Jayshree Machindra More | Chikhali | Pune |
| Sangeeta Vasant Dumbare | Bhose | Pune |
| Indabai Ananda Bhalekar | Pune (M Corp.) | Pune |
| Prakash Baban More | Chikhali | Pune |
| Shilpa Prakash More | Chikhali | Pune |
| Sonam Pramod Chaudhari | Chikhali | Pune |
| Dagadu Laxman More | Chikhali | Pune |
| Shakuntala Dagadu More | Chikhali | Pune |
| Geetaram Dagadu More | Chikhali | Pune |
| Laxmibai Geetaram More | Chikhali | Pune |
| Kajal Jayashree More | Pune (M Corp.) | Pune |
| Sayaji Sahadu Lokhande | Pune (M Corp.) | Pune |
| Mangal Raghunath Kolekar | Pune (M Corp.) | Pune |
| Komal Jayashree More | Pune (M Corp.) | Pune |
| Namrata Dattatray Landge | Chikhali | Pune |
| Om Dattatray Landge | Chikhali | Pune |
| Rushikesh Geetaram More | Chikhali | Pune |
| Tejashree Pravin Nevale | Chikhali | Pune |
| Chandrabhaga Nathu More | Chikhali | Pune |
| Sarika Sunil More | Chikhali | Pune |
| Saurabh Sunil More | Chikhali | Pune |
| Sakshi Sunil More | Chikhali | Pune |
| Gorakshnath Nathu More | Chikhali | Pune |
| Dhanashree Gorakshnath More | Chikhali | Pune |
| Shivam Gorakshnath More | Chikhali | Pune |
| Sangeeta Baba Gawade | Chikhali | Pune |
| Manda Sanjay Bahirat | Chikhali | Pune |
| Nivrutti Laxman More | Chikhali | Pune |
| Laxmibai Nivrutti More | Chikhali | Pune |
| Anil Nivrutti More | Chikhali | Pune |
| Priya Anil More | Chikhali | Pune |
| Sayali Anil More | Chikhali | Pune |
| Om Anil More | Chikhali | Pune |
| Neel Anil More | Chikhali | Pune |
| Jaya Rajendra Salunkhe | Pune (M Corp.) | Pune |
| Pranav Raju Landge | Chikhali | Pune |
| Suman Annasaheb Thorave | Chikhali | Pune |
| Vimal Geetaram Murhe | Chikhali | Pune |
| Kamal Aabasaheb Tapkir | Chikhali | Pune |
| Sharada Arjun Karvande | Chikhali | Pune |
| Champabai Bajaba Landage | Chikhali | Pune |
| Namdev Bajaba Landge | Chikhali | Pune |
| Nivrutti Babaji Landge | Chikhali | Pune |
| Anjali Nivrutti Landge | Chikhali | Pune |
| Prerna Nivrutti Landge | Chikhali | Pune |
| Saloni Nivrutti Landge | Chikhali | Pune |
| Nandabai Nilkanth Pinjan | Chikhali | Pune |
| Vasant Kisan Landge | Chikhali | Pune |
| Leelabai Vasant Landge | Chikhali | Pune |
| Sneha Dattatray Landge | Chikhali | Pune |
| Sangeeta Ramesh Yadav | Chikhali | Pune |
| Vanita Keshav Tavare | Chikhali | Pune |
| Chabubai Dasharath Landge | Chikhali | Pune |
| Shantabai Vijay Landge | Chikhali | Pune |
| Ashwini Vijay Landge | Chikhali | Pune |
| Priyanka Vijay Landge | Chikhali | Pune |
| Raju Dashrath Landge | Chikhali | Pune |
| Rupali Raju Landge | Chikhali | Pune |
| Siddharth Raju Landge | Chikhali | Pune |
| Mandabai Gulab Marathe | Chikhali | Pune |
| Dattatray Vasant Landge | Chikhali | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dream Space Architects |
| Engineer | Sachin Ishwara Naik |
| Chartered Accountant | N B Sayed & Associates |
| Partner | Role in project |
|---|---|
| Namoh Builders and Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - FinanceFile: End Use Certificate - Signed.pdf | 25 Jun 2025 |
| Other - FinanceFile: Additional Payment Receipt.pdf | 25 Jun 2025 |
| Other - FinanceFile: E Building Completion Certifiacte.pdf | 20 Jun 2025 |
| Other - FinanceFile: B and C Building Completion Certifiacte.pdf | 20 Jun 2025 |
| Other - LegalFile: Gat No 1195 - Supplementary DA_8913-2017_Sopan More 19to36.pdf | 25 Apr 2025 |
| Other - LegalFile: Gat No 1195 - Supplementary DA_8913-2017_Sopan More 1to18.pdf | 25 Apr 2025 |
| Other - LegalFile: Supplementary Agreement DOC NO 304 4TH Jan 2013.pdf | 25 Apr 2025 |
| Other - TechnicalFile: Declaration for Plot Area.pdf | 11 Apr 2025 |
| Building plan approvalFile: 6.pdf | 6 Feb 2025 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (7).pdf | 6 Feb 2025 |
| Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building plan approvalFile: 6 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building plan approvalFile: 7 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (7).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (2).pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 6 Feb 2025 |
| Other - FinanceFile: Gat No 1195 - POA DOC NO 10517 2011 27th SEPT.pdf | 6 Feb 2025 |
| Other - FinanceFile: Gat No 1197 - POA DOC NO 1831 21-44.pdf | 6 Feb 2025 |
| Other - FinanceFile: Gat No 1197 POA DOC NO 1831 -1-20.pdf | 6 Feb 2025 |
| Other - FinanceFile: Gat No 1196 - POA DOC NO 2837 - 2012.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (5).pdf | 5 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrace Letter - Legal.pdf | 5 Feb 2025 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (5).pdf | 5 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrace Letter - Legal.pdf | 5 Feb 2025 |
| Other - FinanceFile: 4 Other - Finance.pdf | 5 Feb 2025 |
| Other - FinanceFile: Declaration - Exemption of bank account for landowner.pdf | 29 Jan 2025 |
| Other - LegalFile: Lease Deed No 15491 -2023 MSEB.pdf | 28 Jan 2025 |
| Other - LegalFile: Lease Deed No 15490 -2023 MSEB.pdf | 28 Jan 2025 |
| Other - LegalFile: Gat No 1195 - Correction DOCNO 6786.pdf | 18 Nov 2024 |
| Other - LegalFile: Gat No 1197 - POA DOC No 3103.pdf | 18 Nov 2024 |
| Other - LegalFile: Gat No 1197 -Supplementary Agreement Sayaji mangal.pdf | 18 Nov 2024 |
| Other - LegalFile: Gat No 1196 - Sale Deed DOC NO 10769 -2011.pdf | 18 Nov 2024 |
| Other - LegalFile: POA 10518-Maruti, Mangal ,Pravin giving Consent.pdf | 18 Nov 2024 |
| Other - LegalFile: Reconstitution Partnership Deed_compressed.pdf | 18 Nov 2024 |
| Other - TechnicalFile: 1 Other - Technical (24).pdf | 18 Nov 2024 |
| Copy of the legal title reportFile: Final Title Report as per scrutiny_11zon.pdf | 16 Nov 2024 |
| Proforma of Allotment letterFile: Draft Allotment_12032025.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate final.pdf | 16 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report dated 12-03-2025.pdf | 16 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION - AGREEMENT TO SELL date 22012025.pdf | 16 Nov 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (9).pdf | 16 Nov 2024 |
| Layout approvalFile: PAGE 1 SHINE CITY.pdf | 14 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: PAGE 1 SHINE CITY.pdf | 14 Nov 2024 |
| Building plan approvalFile: page 1.pdf | 4 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: page 1.pdf | 4 Nov 2024 |
| PAN CardFile: Namoh Builders Developers Pan Card.pdf | 23 Oct 2024 |
| Declaration in FORM BFile: FORM B - Promoter Revised -Shine City.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: First Form 2 - Shine City Phase V (1).pdf | 23 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate date 18102024.pdf | 23 Oct 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (8).pdf | 23 Oct 2024 |
| CERSAI detailsFile: 1 CERSAI details (14).pdf | 23 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (7).pdf | 23 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (86).pdf | 23 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B -Declaration from the bank Shine City Phase V Account.pdf | 23 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: 1 Disclosure for secured_unsecured finance availed for the project (3).pdf | 23 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Shine City Phase V on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chikhali13,700+ in Pune
Aishwaryam Anand
Sai Essen Developers
AISHWARYAM HAMARA ABHIMAAN
SAI ESSEN DEVELOPERS
AISHWARYAM HAMARA GAURAV
SAI ESSEN DEVELOPERS
VAASTU DREAMS III
SAI ESSEN 7 AND 8 LLP
AISHWARYAM COURTYARD GOLD
SAI ESSEN PROPERTIES
GANESH PARADISE PHASE 2
EKDANTA NEST LLP
Builder: Namoh Builders and Developers
Namoh Builders and Developers has 1 registration on MahaRERA, including Shine City Phase V. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Shine City Phase V is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shine City Phase V?
The registered promoter entity is Namoh Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shine City Phase V?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shine City Phase V?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shine City Phase V?
The professionals named in the filing: Architect: Dream Space Architects; Engineer: Sachin Ishwara Naik; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shine City Phase V?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback