SHIKARA PRIDE PHASE - I
By Shikara Constructions Pvt. Ltd.
RG-MH-79009 · RERA P52000046692 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIKARA PRIDE PHASE - I is a Others project by Shikara Constructions Pvt. Ltd. in Raigarh, Maharashtra, registered with MahaRERA as P52000046692 on 29 Aug 2022. Possession is promised by 31 Dec 2026. 16 of the 73 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NameSHIKARA PRIDE PHASE - I
- TypeOthers
- Location
- PANVEL MATHERAN ROAD
- NEREPADA
- Nere
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000046692
- ReraGenie IDRG-MH-79009
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Aug 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed105 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 8 | 8 | 46 | 11 | 57 |
| B WING | NA | 7 | 7 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 70%.
A WING59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
B WING60%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A WING | 4 | 39 | 43 |
| B WING | 3 | 39 | 42 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Swapnil Kalyankar |
| Architect | prathamesh Khot |
| Engineer | Ram Marathe |
| Engineer | YAGNIK RANK |
| Chartered Accountant | SUNNY BHAGIA |
| Chartered Accountant | Poonam Balumal Bhagya |
| Partner | Role in project |
|---|---|
| Shikara Constructions Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed105
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Shikara Pride Phase I Form 5 FY 202425.pdf | 29 Jun 2026 |
| Form 1File: ARCHITECH CERTIFICATE PRIDE JUN 25.pdf | 2 Aug 2025 |
| Form 2File: Shikara Pride Engineer Certificate June 25.pdf | 2 Aug 2025 |
| Form 3File: Shikara Pride CA Certificate June 25.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD PRIDE JUN 25.pdf | 2 Aug 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECLARATION.pdf | 2 Aug 2025 |
| Form 1File: ARCHITECT CERTIFICATE - PRIDE - Dec 24.pdf | 3 Jun 2025 |
| Form 2File: Engineer Certificate - Shikara Pride - Dec 24.pdf | 3 Jun 2025 |
| Form 3File: CA Certificate - Shikara Pride - Dec 24.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY - PRIDE - Dec 24.pdf | 3 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration.pdf | 3 Jun 2025 |
| Form 1File: Architect Certificate - Shikara Pride Mar 25.pdf | 3 Jun 2025 |
| Form 2File: Engineer Certificate - Shikara Pride - Mar 25.pdf | 3 Jun 2025 |
| Form 3File: CA Certificate - Shikara Pride - Mar 25.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY - PRIDE - Mar 25.pdf | 3 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration.pdf | 3 Jun 2025 |
| Building plan approvalFile: Shikara Pride - Revised Plans-1.pdf | 18 Jan 2025 |
| Building plan approvalFile: Shikara Pride - Revised Plans-2.pdf | 18 Jan 2025 |
| Building plan approvalFile: Shikara Pride - Revised Plans-3.pdf | 18 Jan 2025 |
| Building plan approvalFile: Shikara Pride - Revised Plans-4.pdf | 18 Jan 2025 |
| Building plan approvalFile: Shikara Pride - Revised Plans-5.pdf | 18 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Shikara Pride - Revised Plans-5.pdf | 18 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Shikara Pride - Revised Plans-4.pdf | 18 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Shikara Pride - Revised Plans-3.pdf | 18 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Shikara Pride - Revised Plans-2.pdf | 18 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Shikara Pride - Revised Plans-1.pdf | 18 Jan 2025 |
| Building plan approvalFile: Plan No 1.pdf | 3 Jan 2025 |
| Building plan approvalFile: Plan No 2.pdf | 3 Jan 2025 |
| Building plan approvalFile: Plan No 3.pdf | 3 Jan 2025 |
| Building plan approvalFile: Plan No 4.pdf | 3 Jan 2025 |
| Building plan approvalFile: Plan No 5.pdf | 3 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SHIKARA PRIDE MARCH 2024.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Pride - 30092023.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Pride - 30062023.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Pride - 31032023.pdf | 3 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan No 3.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan No 5.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan No 4.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan No 2.pdf | 3 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan No 1.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure SHIKARA PRIDE 30032023.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure SHIKARA PRIDE 30092023.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure SHIKARA PRIDE 30062024.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure SHIKARA PRIDE 30092024.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Pride 31032024.pdf | 3 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Pride 31032024.pdf | 16 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Pride - Sep-24.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Pride - Jun-24.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Pride - Mar-24.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHIKARA PRIDE 2023-24.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT SHIKARA PRIDE SEP 24.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHIKARA PRIDE - MAR 24.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHIKARA PRIDE - JUN 24.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHIKARA PRIDE - SEP 24.pdf | 9 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SHIKARA PRIDE SOLD INVENTORY - SEP 24.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Shikara Pride Phase I 3006.pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Shikara Pride Phase 1 3003.pdf | 4 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Shikara Pride - 23-24.pdf | 17 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate - Shikara Pride - Dec 23.pdf | 14 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Shikara Pride - Dec 23.pdf | 14 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate - Shikara Pride - Dec 23.pdf | 3 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: SHIKARA PRIDE PHASE I.pdf | 19 Jan 2024 |
| Proforma of Agreement for saleFile: Agreement for sale - SHIKARA PRIDE- RERA.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert Shikara Pride 30092023.pdf | 6 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Shikara Pride 30092023.pdf | 6 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Shikara Pride 30092023.pdf | 2 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shikara Pride rera form 5.pdf | 30 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2223.pdf | 24 Aug 2023 |
| Proforma of Agreement for saleFile: AFS SHIKARA PRIDE RERA.pdf | 21 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Shikara Pride Phase - I.pdf | 11 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Shikara Pride.pdf | 10 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate - Pride Q1 - FY23-24.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Pride Q1 - FY23-24.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIKARA PRIDE - Architect Cert 31032023.pdf | 6 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIKARA PRIDE - CA Cert 31032023.pdf | 6 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE SHIKARA PRIDE - DEC 22.pdf | 24 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE SHIKARA PRIDE - DEC 22.pdf | 24 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SHIKARA PRIDE - DEC 22.pdf | 24 Jan 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shikara Estates Phase II | Village - Chiple Taluka-Panvel | 99 | Completed | Apr 2014 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 105 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHIKARA PRIDE PHASE - I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEREPADA5,900+ in Raigarh
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Shikara Constructions Pvt. Ltd.
Shikara Constructions Pvt. Ltd. has 6 registrations on MahaRERA, including Shikara Greens Phase I and Shikara Orchid. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHIKARA PRIDE PHASE - I is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIKARA PRIDE PHASE - I?
The registered promoter entity is Shikara Constructions Pvt. Ltd., a company as per the filing. Its GSTIN 27AAKCS3917P1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIKARA PRIDE PHASE - I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIKARA PRIDE PHASE - I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIKARA PRIDE PHASE - I?
The professionals named in the filing: Architect: Swapnil Kalyankar; Architect: prathamesh Khot; Engineer: Ram Marathe; Engineer: YAGNIK RANK; Chartered Accountant: SUNNY BHAGIA; Chartered Accountant: Poonam Balumal Bhagya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIKARA PRIDE PHASE - I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback