ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Shikara Orchid

Registration lapsed No litigation declared Residential / Group Housing project

Shikara Orchid

By Shikara Constructions Pvt. Ltd.

RG-MH-43584 · RERA P52000018510 · Last updated on MahaRERA portal: 3 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 21 months past the filed date
  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jan 2025Possession promised21 months past this date
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
1 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Shikara Orchid is a Residential / Group Housing project by Shikara Constructions Pvt. Ltd. in Raigarh, Maharashtra, registered with MahaRERA as P52000018510 on 12 Nov 2018. Possession was promised by 29 Jan 2025 and is now 21 months past that date. The completion date has moved by 12 months from the original filing. 67 of the 68 units on this registration are recorded sold or booked, and 50 of 55 construction stages are filed complete.

At a glance

Project

  • NameShikara Orchid
  • TypeResidential / Group Housing
  • Location
    • Nere Road
    • Akurli Village
    • Akurli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000018510
  • ReraGenie IDRG-MH-43584

Builder

  • NameShikara Constructions Pvt. Ltd.
  • Entity typeCompany
  • GSTIN27AAKCS3917P1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsVishal Ashok Mehra, Anita Ashok Mehra
  • Other registrations5 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

21 months past promisethis monthRegisteredNov 2018First promiseJan 2024Revised toJan 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Nov 2018
  • Promised completion29 Jan 2025
  • Revised completionRevised to 29 Jan 2025 (originally 30 Jan 2024)
  • Buildings5 building records
  • Documents filed117 files

Current status

99%67 of 68 units booked

Figures as on 3 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1 Wing ANA5312012
Building No 1 Wing BNA5312012
Building No 1 Wing CNA5312012
Building No 2 Wing ANA6416016
Building No 2 Wing BNA6416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 3 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No 1 Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 1 Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 1 Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 2 Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 2 Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered21
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
Building No 1 Wing A358
Building No 1 Wing B303
Building No 1 Wing C303
Building No 2 Wing A628
Building No 2 Wing B606

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,718 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 May 2025

Approvals and building plan

Sanctioning authorityCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Permissible FSI2655.96
Proposed, not sanctioned2,656 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSion, Mumbai-400022

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrathamesh Khot
EngineerYateesh Rajaram Tare
Chartered AccountantSunny Bhagia & Associates
Chartered AccountantSunny Bhagia
PartnerRole in project
Shikara Constructions Pvt. Ltd.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017302Jan 2024 → Jul 2024

Reason as filed by the promoterDUE TO COVID SITUATION THERE WAS SHORTAGE OF MANPOWER & DELAY IN RECEIVING THE MATERIAL AT SITE

EXT52000019601Jan 2024 → Jan 2025

Reason as filed by the promoterDUE TO SHORTAGE OF CONSTRUCTION MATERIAL AND SHORTAGE OF MANPOWER AT SITE WE HEREBY REQUEST FOR EXTENSION OF PROJECT FOR 6 MONTHS.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: ARCHITECT CERTIFICATE - ORCHID - Dec 24.pdf3 Jun 2025
Form 2File: Engineer Certificate - Shikara Orchid - Dec 24.pdf3 Jun 2025
Form 3File: CA CERTIFICATE - ORCHID - Dec 24.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY - ORCHID - Dec 24.pdf3 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf3 Jun 2025
Form 1File: Architect Certificate - Shikara Orchid - Mar 25.pdf3 Jun 2025
Form 2File: Engineer Certificate - Shikara Orchid - Mar 25.pdf3 Jun 2025
Form 3File: CA Certificate - Shikara Orchid - Mar 25.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY - ORCHID - Mar 25.pdf3 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf3 Jun 2025
Certificates of CA (Form 3)File: CA CERTIFICATE SHIKARA ORCHID - SEP 24.pdf14 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE SHIKARA ORCHID - SEP 24.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHIKARA ORCHID 2023-24.pdf14 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT SHIKARA ORCHID SEP 24.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: SHIKARA ORCHID SOLD INVENTORY - SEP 24.pdf9 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Shikara Orchids 300624.pdf4 Nov 2024
Certificates of CA (Form 3)File: SHIKARA ORCHIDS CA CERTIFICATE.pdf4 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHIKARA ORCHIDS ENGNEER CERTIFICATE.pdf4 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Shikara Orchid - 23-24.pdf4 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate - Orchid 31032024.pdf3 May 2024
Certificates of CA (Form 3)File: CA Certificate - Orchid 31032024.pdf2 May 2024
Declaration in FORM BFile: Form B - Affidavit - Shikara Orchid.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Shikara Orchid 31032024.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Orchid 31032024.pdf26 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Seperate Bank Accounts - Orchid.pdf26 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Orgn.pdf26 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Accounts - Orchid.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate - Shikara Orchid - Dec 23.pdf3 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate - Shikara Orchid - Dec 23.pdf3 Feb 2024
Certificates of CA (Form 3)File: CA Certificate - Shikara Orchid - Dec 23.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: SHIKARA ORCHID.pdf19 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert Shikara Orchid 30092023.pdf8 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert Shikara Orchid 30092023.pdf2 Nov 2023
Certificates of CA (Form 3)File: CA Cert Shikara Orchid 30092023.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SHIKARA ORCHID FORM 5 2023.pdf30 Sep 2023
Declaration in FORM BFile: Shikara Orchid Form B.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shikara Orchid 2A 2023.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Shikara Orchid.pdf11 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate - Orchid Q1 - FY23-24.pdf20 Jul 2023
Certificates of CA (Form 3)File: CA Certificate - Orchid Q1 - FY23-24.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKARA GREENS - Architect Cert 31032023.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKARA ORCHID - Architect Cert 31032023.pdf6 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHIKARA ORCHID - ENG Cert 31032023.pdf6 May 2023
Certificates of CA (Form 3)File: SHIKARA ORCHID - CA Cert 31032023.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 02A SHIKARA ORCHID.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shikara Orchid - Arch Certificate - Dec 22.pdf24 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shikara Orchid - Engineer Certificate - Dec 22.pdf24 Jan 2023
Certificates of CA (Form 3)File: Shikara Orchid - CA Certificate - Dec 22.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 -SHIKARA ORCHIDS 2022- SO.pdf24 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE - SHIKARA ORCHID.pdf9 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE - SHIKARA ORCHID SEP 22.pdf9 Nov 2022
Certificates of CA (Form 3)File: CA CERTIFICATE - SHIKARA ORCHID SEP 22.pdf9 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Shikara Orchid.pdf10 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certiificate - Shikara Orchid.pdf10 Aug 2022
Certificates of CA (Form 3)File: CA Certificate - Shikara Orchid.pdf10 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate - AKURLI - 31-03-2022.pdf30 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - AKURLI - 31-03-2022.pdf30 May 2022
Certificates of CA (Form 3)File: CA Certificate - AKURLI - 31-03-2022.pdf30 May 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT - SHIKARA ORCHID.pdf8 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Akurli Project Engineering Cirtificate.pdf3 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Shikara Orchid CHS - Name Reservation.pdf21 Feb 2022
CERSAI detailsFile: 1 CERSAI details.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: SHIKARA ORCHIDS 2018.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SHIKARA ORCHIDS 2019.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SHIKARA ORCHIDS 2020.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SHIKARA ORCHIDS 2021.pdf19 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate- SO.pdf16 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SO.pdf16 Feb 2022
Certificates of CA (Form 3)File: CA Certificate - SO.pdf16 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKARA ORCHIDS ARCHITECH CERTIFICATE.pdf8 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - AKURLI.pdf8 Dec 2021
Certificates of CA (Form 3)File: SHIKARA ORCHID CA CERTIFICATE.pdf8 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4th Quarter - Architect Certificate 20-21.pdf18 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1st Quarter - Architect Certificate 21-22.pdf18 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3rd Quarter - Engineer Certificate 20-21.pdf18 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4th Quarter - Engineer Certificate 20-21.pdf18 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1st Quarter - Engineer Certificate 21-22.pdf18 Aug 2021
Certificates of CA (Form 3)File: 4th Quarter - CA Certificate 20-21.pdf18 Aug 2021
Certificates of CA (Form 3)File: 1st Quarter - CA Certificate 21-22.pdf18 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ORCHID ARCHITECT CERTIFICATE MAR 20.pdf11 Feb 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shikara Estates Phase IIVillage - Chiple Taluka-Panvel99CompletedApr 2014Apr 2014

How this compares with Raigarh

99%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shikara Orchid on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akurli Village5,900+ in Raigarh

2 kmShikara OrchidCompleted 21Lapsed / revoked 7Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Shikara Constructions Pvt. Ltd.

Shikara Constructions Pvt. Ltd. has 6 registrations on MahaRERA, including Shikara Greens Phase I and Shikara Orchid. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that Shikara Orchid shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Shikara Orchid is delayed beyond 29 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shikara Orchid?

The registered promoter entity is Shikara Constructions Pvt. Ltd., a company as per the filing. Its GSTIN 27AAKCS3917P1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shikara Orchid?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shikara Orchid?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shikara Orchid?

The professionals named in the filing: Architect: Prathamesh Khot; Engineer: Yateesh Rajaram Tare; Chartered Accountant: Sunny Bhagia & Associates; Chartered Accountant: Sunny Bhagia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shikara Orchid?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shikara Orchid. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shikara Orchid to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.