Home / Browse projects / Mumbai Suburban, Maharashtra / SHETH MIDORI
SHETH MIDORI
By SHETH INFRAWORLD PRIVATE LIMITED
RG-MH-10009 · RERA P51800000882 · Last updated on MahaRERA portal: 18 Mar 2023
Source: official MahaRERA filing
Red flags
- 100 complaints at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHETH MIDORI is a Residential / Group Housing project by SHETH INFRAWORLD PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000882 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Nov 2021. The completion date has moved by 30 months from the original filing. 100 complaints are on record with the regulator.
At a glance
Project
- NameSHETH MIDORI
- TypeResidential / Group Housing
- Location
- SHIV VALLABH ROAD
- HANUMAN TEKDI
- Borivali
- Mumbai Suburban
- 400068
- Pincode400068
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000882
- ReraGenie IDRG-MH-10009
Builder
- NameSHETH INFRAWORLD PRIVATE LIMITED
- Entity typeCompany
- DirectorAshwin Sheth
- Declared earlier projects10 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion30 Nov 2021
- Revised completionRevised to 30 Nov 2021 (originally 31 May 2019)
- Buildings3 building records
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 25 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 15 | 0 | 0 | 0 | 0 |
| BUILDING C | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
BUILDING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities19
As on 18 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 98% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| MULTIPLAY AREA | Yes | 75% |
| KIDS PLAY AREA | Yes | 100% |
| JOGGING TRACK | Yes | 100% |
| CLUB HOUSE | Yes | 100% |
Parking filed567
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 258 | 258 |
| BUILDING B | 142 | 142 |
| BUILDING C | 167 | 167 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GA DESIGN |
| Engineer | JW CONSULTANTS LLP |
| Partner | Role in project |
|---|---|
| SHETH INFRAWORLD PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterLetter submitted on 07 February 2013 to MCGM seeking for amendment of plan to retain existing shed with additional temporary structure on project was finally approved on 27 November 2013, thereby causing delay of approx 10 months in completion of project. Application for Environmental Clearance submitted on 16 September 2013 was issued by Government of Maharashtra on 04 December 2014, thereby causing a delay of approx 1 year and 2 months. Application submitted to MPCB for Consent to Establish on 17 January 2015 was finally issued on 29 April 2015, causing a delay of approx 3 months Stop Work N
Reason as filed by the promoter(i) As per DCPR 2034, applicant were required to make fresh application dated 22.03.19 for getting amended plan concession before MCGM with respect to Wing A1, & Wing A2 upto 22nd Flr and Wing A3 upto 21st Flr which was duly approved on 03.08.19 thereby causing delay of 5 months. (ii) Basis the above, the applicant submitted the amended plan on 04.12.19, which was approved on 24.12.19 with respect to Wing A1 upto 21st Flr, Wing A2 upto 21st(p) flr and Wing A3 upto 20th Flr. (iii) Thereafter the applicant on 22.01.20 applied for further CC for further construction of A wing which was approved o
Complaints filed with MahaRERA100
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000814 | Hemant Gowda | ShethInfraworld Pvt. Ltd | 25/01/2018 |
| CC006000000000778 | Siddharth Bhatt & Vyoma Bhatt | Sheth Indraworld Pvt. Ltd | 08/10/2017 |
| CC006000000000862 | Amit Rathod | Ashwin Natwarlal Sheth | 28/09/2017 |
| CC006000000110925 | Amit Rathod | Ashwin Natwarlal Sheth | 21/09/2019 |
| CC006000000000889 | Neha Agrawal | Sheth Infraworld Pvt Ltd | 27/10/2017 |
| CC006000000192836 | Robin Kurian and Winnie Sarah Thomas | Sheth Infraworld Pvt Ltd | 04/03/2020 |
| CC006000000192850 | Ronnie Kurian and Nithiya Mary Joseph | Sheth Infraworld Pvt Ltd | 04/03/2020 |
| CC006000000012327 | SHETH MIDORI DAHISAR BUYERS AOP | SHETH INFRAWORLD PRIVATE LIMITED | 06/12/2017 |
| CC006000000012330 | SHETH MIDORI DAHISAR BUYERS AOP | SHETH INFRAWORLD PRIVATE LIMITED | 06/12/2017 |
| CC006000000012424 | SUMIT RANAWAT | SHETH INFRAWORLD PRIVATE LIMITED | 13/12/2017 |
| CC006000000012427 | AMEY KADU | SHETH INFRAWORLD PRIVATE LIMITED | 13/12/2017 |
| CC006000000012428 | MULCHAND DARJI | SHETH INFRAWORLD PRIVATE LIMITED | 13/12/2017 |
| CC006000000023372 | PAWAN LAKHOTIA | Sheth infraworld pvt. Ltd | 16/02/2018 |
| CC006000000023410 | Prasannaraj Prakash Bhatawdekar | SHETH INFRAWORLD PRIVATE LIMITED | 09/03/2018 |
| CC006000000023716 | NILESH DATTARAM GHATGE | SHETH INFRAWORLD PVT LTD HAVING CIN NO.U45202MH2010PTC210291 | 14/03/2018 |
| CC006000000023932 | NILESH PRABHULKAR | M/S Sheth Infraworld Pvt Ltd. | 29/03/2018 |
| CC006000000193900 | Nilesh Prabhulkar | Sheth Infraworld Pvt Limited | 04/09/2020 |
| CC006000000023917 | Laxmi Gaikwad and Ajay Gaikwad | Sheth Infraworld Private Limited | 29/03/2018 |
| CC006000000044547 | Mehul Shashikant Raval | Sheth Infraworld Pvt. Ltd. | 24/05/2018 |
| CC006000000044256 | Midori Delay in possession, extra charges due to increase in Area | Sheth Infraworld Private limited | 23/04/2018 |
| CC006000000044480 | NARAYAN RAMANUJ KABRA | SHETH INFRAWORLD PVT LTD | 11/05/2018 |
| CC006000000044482 | SAURABH SANTOSH KESARWANI | SHETH INFRAWORLD PVT LTD | 11/05/2018 |
| CC006000000044487 | Madhuri Shashikant Juikar | M/s. SHETH INFRAWORLD PVT. LTD. | 12/05/2018 |
| CC006000000054615 | Mahesh Goving Chendavankar | Sheth Infraworld Pvt Ltd. | 31/05/2018 |
| CC006000000054833 | Mr. Devidas Bhogate & Mrs. Diya Bhogate | Sheth Infraworld Pvt. Ltd. | 08/06/2018 |
| CC006000000054836 | Mr. Mahesh Kumar Duggal & Mrs. Alka Mahesh Duggal | Sheth Infraworld Pvt. Ltd. | 08/06/2018 |
| CC006000000054958 | Tanuj Arora | Sheth Infraworld | 16/06/2018 |
| CC006000000055073 | Mahesh M Kelkar | Chintan Sheth | 04/07/2018 |
| CC006000000055412 | MANOJ GAGVANI | Sheth Infraworld Private Limited | 19/07/2018 |
| CC006000000055777 | KIRAN M DEVARDEKAR | Sheth Infraorld Pvt.Ltd. | 13/08/2018 |
| CC006000000055449 | Anup Kumar Rath | Sheth Infraworld Private Limited | 20/07/2018 |
| CC006000000055462 | PRAVEEN KUMAR HARKAWAT | ASHWIN SHETH GROUP | 27/08/2018 |
| CC006000000055484 | Umesh Joshi and Veena Joshi | Sheth Infraworld Pvt Ltd | 01/08/2018 |
| CC006000000055603 | Sadashiv Prabhu and Swati Prabhu | Sheth Infraworld Pvt Ltd | 13/08/2018 |
| CC006000000055606 | RAJESH ASSUMAL RANGWANI & PAYAL RANGWANI | Mr. Chintan Sheth, M/s Sheth Infraworld Private Limited | 02/08/2018 |
| CC006000000055622 | Nitin Nandkumar Paithankar | Sheth InfraworldCompanies - Sheth Midori | 04/08/2018 |
| CC006000000055669 | Girish Dash | Sheth Infra World | 17/08/2018 |
| CC006000000055867 | Govind Arjun Dhavan & Renuka G Dhavan | Sheth Infraworld Pvt Ltd | 20/08/2018 |
| CC006000000055885 | ANISMITA GHOSH | SHETH INFRAWORLD PRIVATE LIMITED | 25/08/2018 |
| CC006000000055976 | Indu Shreerang Shedge & Vaishali S. Shedge | Sheth Infraworld Pvt. Ltd. | 28/08/2018 |
| CC006000000055991 | SAMIR KEDIA | SHETH INFRAWORLD PVT LTD | 30/08/2018 |
| CC006000000056168 | Deepak Talathi | Sheth infraworld | 23/09/2018 |
| CC006000000057033 | Bhupendra Yadav | M/s Sheth Infraworld Private Limited | 26/11/2018 |
| CC006000000056320 | MANOJ RAJENDRA NILE | SHETH INFRAWORLD PRIVATE LIMITED | 25/09/2018 |
| CC006000000056905 | SHIRISH GHOLKAR | SHETH INFRAWORLD PRIVATE LIMITED | 23/11/2018 |
| CC006000000057674 | Sharmishtha Hemant Masurekar | Sheth Infraworld Pvt Ltd | 19/01/2019 |
| CC006000000057899 | Trikaal Theatres & RealtyIndia Private Limited | Sheth Infraworld Private Limited | 02/02/2019 |
| CC006000000057920 | Trikaal Theatres & Realty India Pvt. Ltd | Sheth Infraworld Pvt. Ltd. | 02/02/2019 |
| CC006000000057921 | Trikaal Theatres & Realty India Pvt. Ltd. | Sheth Infraworld Pvt. Ltd | 02/02/2019 |
| CC006000000057925 | Trikaal Theatres & Realty India Pvt. Ltd. | Sheth Infraworld Pvt. Ltd. | 02/02/2019 |
| CC006000000057927 | Trikaal Theatres & Realty India Pvt. Ltd. | Sheth Infraworld Pvt. Ltd. | 02/02/2019 |
| CC006000000057928 | Trikaal Theatres & Realty India Pvt. Ltd. | Sheth Infraworld Pvt. Ltd. | 02/02/2019 |
| CC006000000057978 | Mitali Natverlal Rathod | Sheth Infraworld Pvt Ltd | 15/02/2019 |
| CC006000000057994 | MEHENDRA KUMAR BENI PRASAD | SHETH INFRAWORLD PRIVATE LIMITED | 07/02/2019 |
| CC006000000058031 | Deepika | Sheth Infraworld Pvt Ltd | 20/02/2019 |
| CC006000000078482 | Sundeep Kelkar & Smita Kelkar | Sheth Infraworld Pvt Ltd | 14/03/2019 |
| CC006000000100222 | Prashant Satish Hegde | Sheth Infraworld Pvt Ltd | 23/08/2019 |
| CC006000000110694 | Saurabh Kesarwani & Rasi Kesarwani | Sheth Infraworld Pvt Ltd | 30/09/2019 |
| CC006000000110909 | Rubina Brayan Dbritto and Brayan Anthony Dbritto | Sheth Infraworld Pvt Ltd | 02/10/2019 |
| CC006000000161241 | Vishwas Shetty and Lalitha Shetty | Sheth Infraworld Pvt Ltd | 28/10/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Aug 2022
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sheth Midori.pdf | 18 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Sheth Midori A_merged.pdf | 23 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Awing society Application.pdf | 21 Nov 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY Registration.pdf | 21 Nov 2022 |
| Certificates of Architect (Form 4)File: Form-4.pdf | 15 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sheth Midori_Form-1_18102022.pdf | 19 Oct 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Midori A Wing OC.pdf | 4 Aug 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Midori Part Oc.pdf | 4 Aug 2022 |
| Certificates of CA (Form 3)File: FORM -3-SHETH MIDORI.pdf | 26 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sheth Midori_compressed.pdf | 20 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: SHETH MIDORI.pdf | 19 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: SHITH MIDORI -C1 C2 C3.pdf | 19 Jul 2022 |
| Certificates of CA (Form 3)File: FORM 3 -SHETH MIDORI.pdf | 22 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHETH MIDORI.PDF | 13 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sheth Midori.pdf | 26 Apr 2022 |
| Details of encumbrancesFile: Sheth Midori_Encumbrance update_3.pdf | 22 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SHETH MIDORI- C WING.PDF | 20 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SHETH MIDORI AB WING.PDF | 20 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIDORI.pdf | 12 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Sheth Midori.pdf | 19 Jan 2022 |
| CERSAI detailsFile: Midori_CERSAI.pdf | 10 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sheth midori.pdf | 7 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1.pdf | 3 Jan 2022 |
| OtherFile: oc - application 3.pdf | 1 Dec 2021 |
| OtherFile: oc - application 2.pdf | 1 Dec 2021 |
| OtherFile: oc - application 1.pdf | 1 Dec 2021 |
| Certificates of CA (Form 3)File: Sheth Midori 09-11-2021 Form 3.pdf | 12 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold - Booked Inventory - Sheth Midori.pdf | 2 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: In formation of Sold - Booked Inventory (Building wise) - Sheth Midori.pdf | 14 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: MIDORI FORM 5 18-19.pdf | 14 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Midori.pdf | 10 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: SHETH MIDORI CC.pdf | 15 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Midori Further CC dt 2702020.pdf | 28 Jan 2020 |
| Certificates of CA (Form 5)File: FORM 5 - MIDORI.pdf | 30 Oct 2019 |
| Details of encumbrancesFile: encumberrance Midori_08012018.pdf | 25 Apr 2019 |
| Certificates of Architect (Form 4)File: Architect Certificate.pdf | 7 Feb 2019 |
| OtherFile: Oc-Midori.pdf | 6 Feb 2019 |
| Certificates of CA (Form 5)File: Steth Midori.pdf | 24 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC - Sheth Midori.pdf | 23 Mar 2018 |
| Details of encumbrancesFile: Encumbrance Certificate - Midori.pdf | 19 Jul 2017 |
| Proforma of Allotment letterFile: RERA Agreement - Midori 16th july 2017 approved by Chintan.pdf | 19 Jul 2017 |
| Proforma of Allotment letterFile: RERA ALLOTMENT LETTER -Midori 18th July 2017.pdf | 19 Jul 2017 |
| Building plan approvalFile: 1.pdf | 18 Jul 2017 |
| Building plan approvalFile: Ltr Dahisar Amended - 2405.pdf | 18 Jul 2017 |
| Copy of the legal title reportFile: 002 - Title Report 2 OP.pdf | 18 Jul 2017 |
| Building Plan Approval (IOD)File: 1.pdf | 18 Jul 2017 |
| Building Plan Approval (IOD)File: Ltr Dahisar Amended - 2405.pdf | 18 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 18 Jul 2017 |
| Declaration in FORM BFile: FORM B MIDORI_Final.pdf | 18 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate July 14072017op.pdf | 18 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Signed _ MIDORI 13th July.pdf | 18 Jul 2017 |
| Building plan approvalFile: 2-5.pdf | 10 Jul 2017 |
| Building plan approvalFile: 6-8.pdf | 10 Jul 2017 |
| Building plan approvalFile: 9-11.pdf | 10 Jul 2017 |
| Building plan approvalFile: 12-15.pdf | 10 Jul 2017 |
| Layout approvalFile: LAYOUT LETTER - OP.pdf | 10 Jul 2017 |
| Layout approvalFile: 11 - OP.pdf | 10 Jul 2017 |
| Layout approvalFile: 12 - OP.pdf | 10 Jul 2017 |
| PAN CardFile: pan Sheth Infraworld Pvt Ltd.pdf | 10 Jul 2017 |
| Copy of the legal title reportFile: 002 - Title Report op.pdf | 10 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT LETTER - OP.pdf | 10 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 11 - OP.pdf | 10 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 12 - OP.pdf | 10 Jul 2017 |
| Building Plan Approval (IOD)File: 2-5.pdf | 10 Jul 2017 |
| Building Plan Approval (IOD)File: 6-8.pdf | 10 Jul 2017 |
| Building Plan Approval (IOD)File: 9-11.pdf | 10 Jul 2017 |
| Building Plan Approval (IOD)File: 12-15.pdf | 10 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificatte 12072017.pdf | 10 Jul 2017 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SIGMA | ZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI -25 | 260 | Completed | Jul 2014 | Late, Dec 2014 |
| VIVIANA MALLS | Viviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601 | 240 | Completed | May 2013 | May 2013 |
| VASANT LAWNS | Vasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601 | 465 | Completed | Mar 2012 | Late, Nov 2012 |
| BEAUMONDE | APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25 | 196 | Completed | Dec 2011 | Late, Jan 2012 |
| VASANT MARVEL | WESTRN EXPRESS HIGHWAY BORIWALI EAST MUMBAI - 66 | 641 | Completed | Oct 2011 | Late, Jul 2012 |
| CYNERGY | APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25 | 33 | Completed | Sep 2011 | Sep 2011 |
| VASANT GALAXY | JUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI | 803 | Completed | Oct 2010 | Late, Mar 2011 |
| VASANT VALLEY | MALAD EAST MUMBAI 96 | 127 | Completed | Jun 2010 | Late, Dec 2010 |
| VASANT GARDEN | SWAPNA NAGARI OFF LBS MARG MULUND WEST MUMBAI 80 | 1,825 | Completed | Mar 2007 | Late, Dec 2007 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep SHETH MIDORI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HANUMAN TEKDI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 241 registered projects within 2 km.
ICON
RAGHU LEELA REALTORS PRIVATE LIMITED
ORNATE SOLITAIRE
ORNATE DAHISAR DEVELOPERS
EMPIRE HEIGHTS
EMPIRE REALTY
SHAKTI DHAM-WING A, VRINDAVAN-WING B RESIDENTI
DHARTI DEVELOPERS
RAGHUKUL CHSL
RAMNIYATI REALITIES LLP
Earth Residency Wing C and Wing D
Earth Estate Developers Pvt Ltd
See every Mumbai Suburban project, with the district possession charts
Builder: SHETH INFRAWORLD PRIVATE LIMITED
SHETH INFRAWORLD PRIVATE LIMITED has 1 registration on MahaRERA, including SHETH MIDORI. Its filings disclose 10 earlier MahaRERA projects: declares 2 of 10 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SHETH MIDORI is delayed beyond 30 Nov 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHETH MIDORI?
The registered promoter entity is SHETH INFRAWORLD PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHETH MIDORI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHETH MIDORI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SHETH MIDORI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHETH MIDORI?
The professionals named in the filing: Architect: GA DESIGN; Engineer: JW CONSULTANTS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHETH MIDORI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback