Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
0 of 11Construction stages doneacross 2 buildings; furthest along: Excavation, 70%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

SHELTON CHS is a Mixed project by JALARAM AND ASSOCIATES in Raigarh, Maharashtra, registered with MahaRERA as P52000077387 on 13 Aug 2024. Possession is promised by 13 Aug 2027.

At a glance

Project

  • NameSHELTON CHS
  • TypeMixed
  • Location
    • Thane Naka Road
    • Near HOC Colony
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077387
  • ReraGenie IDRG-MH-18107

Builder

  • NameJALARAM AND ASSOCIATES
  • Entity typePartnership
  • GSTIN27AASFJ6673Q1Z5
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersDEVENDRA JETHALAL POPAT, MEENA DINESH POPAT, RANA RANCHOD AHIR, DAMJI MEKAN NISAR, MOHANLAL DEVSHI PATEL, VINOD DEVSHI PATEL
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2024
  • Promised completion13 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A, Wing B and Wing CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.

Wing A, Wing B and Wing C9%
ActivityProgress
Excavation70%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Closed/Covered56
Open Space27

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,350 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2024
LandownerVillageDistrict
Shelton Co-Operative Housing Society LimitedPanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI5017.69
Proposed, not sanctioned3,981 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1, Arihant Aura, Plot No 13-1, TTC Industrial Area, Thane Belapur Road, Turbhe - 400705

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
JALARAM AND ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Aug 2027

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Shelton CHS as on June 2025.pdf13 May 2026
Form 2File: Form 2 - Shelton CHS as on June 2025.pdf13 May 2026
Form 3File: Form 3 of Shelton CHS as on 30-06-2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shelton CHS as on June 2025.pdf13 May 2026
Form 1File: Form 1 - Shelton CHS as on June 2025.pdf13 May 2026
Form 2File: Form 2 - Shelton CHS as on June 2025.pdf13 May 2026
Form 3File: Form 3 of Shelton CHS as on 30-06-2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shelton CHS as on June 2025.pdf13 May 2026
Form 1File: Form 1 - Shelton CHS as on Sep 2025.pdf13 May 2026
Form 2File: Form 2 - Shelton CHS as on Sep 2025.pdf13 May 2026
Form 3File: Form 3 of Shelton CHS as on 30-09-2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shelton CHS as on Sept 2025.pdf13 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shelton CHS as on March 2025.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shelton CHS as on March 2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 31ST MARCH 2025.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 31ST MARCH 2025.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shelton CHS as on Sep 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shelton CHS as on Dec 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shelton CHS as on Sep 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shelton CHS as on Dec 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shelton CHS as on Sep 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shelton CHS as on Dec 2024.pdf20 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification - Shelton CHS.pdf25 Jul 2024
Other - TechnicalFile: Annexure A - Order no 50.pdf25 Jul 2024
Other - TechnicalFile: CC Verification - Shelton CHS.pdf25 Jul 2024
Other - LegalFile: Partnership Deed - Jalaram And Associates.pdf22 Jul 2024
Declaration in FORM BFile: Form B - Promoter.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_11zon.pdf19 Jun 2024
Layout approvalFile: Scan-0002.pdf22 May 2024
Building plan approval or NA orderFile: Layout pg 1.pdf22 May 2024
Building plan approval or NA orderFile: Scan-0003.pdf22 May 2024
Building plan approval or NA orderFile: Scan-0004.pdf22 May 2024
Building plan approval or NA orderFile: Scan-0005.pdf22 May 2024
Building plan approval or NA orderFile: Scan-0006.pdf22 May 2024
Copy of Layout Approval (in case of layout)File: Scan-0002.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout pg 1.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan-0003.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan-0004.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan-0005.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan-0006.pdf22 May 2024
Declaration about Commencement CertificateFile: Format D - Declaration of CC.pdf22 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details (1).pdf22 May 2024
CERSAI detailsFile: CERSAI_Search_Report_ - Shelton.pdf16 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report For Allotment Letter.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances Letter - Shelton.pdf15 May 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances Letter - Shelton.pdf15 May 2024
Proforma of Allotment letterFile: Letter of Allotment - Shelton.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Shelton CHS_11zon.pdf10 May 2024
PAN CardFile: Pan Card Jalaram And Associates.pdf4 May 2024
Copy of the legal title reportFile: Title And Search Report.pdf4 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Devlopment permission - PMC.pdf4 May 2024
Proforma of Agreement for saleFile: AREEMENT OF SALE - SHELTON.pdf4 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Shelton CHS.pdf4 May 2024

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHELTON CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near HOC Colony5,900+ in Raigarh

2 kmSHELTON CHSCompleted 165Lapsed / revoked 58Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 364 registered projects within 2 km.

Builder: JALARAM AND ASSOCIATES

JALARAM AND ASSOCIATES has 2 registrations on MahaRERA, including SHELTON CHS and Shivneri Aaykar CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHELTON CHS is delayed beyond 13 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHELTON CHS?

The registered promoter entity is JALARAM AND ASSOCIATES, a partnership as per the filing. Its GSTIN 27AASFJ6673Q1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHELTON CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHELTON CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SHELTON CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHELTON CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHELTON CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.