Home / Browse projects / Mumbai City, Maharashtra / Shapoorji Pallonji The Odyssey 1

Registered No litigation declared Residential / Group Housing projectRedevelopment

Shapoorji Pallonji The Odyssey 1

By Floreat Investments Private Limited

RG-MH-05331 · RERA P51900050998 · Last updated on MahaRERA portal: 20 Oct 2026

Why this is marked a redevelopment: this filing shows 33 flats filed as rehab units, MahaRERA's column for homes returned to existing occupants or owners. MahaRERA has no redevelopment field, so this is ReraGenie's reading of the filing. Redevelopment across Mumbai City.

Source: official MahaRERA filing

Red flags

  • Rs 280.00 crore secured on the land, in favour of VISTRA ITCL INDIA LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedmoved 4 months by MahaRERA order
1 of 11Construction stages donefurthest along: Basement (if any), 0%
65 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Shapoorji Pallonji The Odyssey 1 is a Residential / Group Housing project by Floreat Investments Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900050998 on 19 May 2023. Possession is promised by 20 Dec 2031. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 13 of the 78 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameShapoorji Pallonji The Odyssey 1
  • TypeResidential / Group Housing
  • Location
    • Harishchandra Goregaonkar Marg
    • Gamdevi
    • Girgaon
    • Girgaum
    • Ward ABCD
    • Mumbai City
    • 400007
  • Pincode400007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900050998
  • ReraGenie IDRG-MH-05331

Builder

  • NameFloreat Investments Private Limited
  • Entity typeCompany
  • DirectorsSreeram Kuppa, Sumit Sapru, Subodh Pagnis, Sandeep Jaiswal

Key dates

this monthRegisteredMay 2023First promiseAug 2031Revised toDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 May 2023
  • Promised completion20 Dec 2031
  • Revised completionRevised to 20 Dec 2031 (originally 20 Aug 2031)
  • Buildings1 building record
  • Documents filed117 files

Current status

17%13 of 78 units booked
0.6%Work done, per cost certificate

Figures as on 20 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Composite Building ENA663678078

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Composite Building E: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed220

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots220
Closed/Covered220

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,741 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofVISTRA ITCL INDIA LIMITED
Secured amountRs 280.00 crore
CERSAI search filedYes
Declared on22 Jul 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12492.53
Proposed, not sanctioned12,493 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort, Mumbai
Estimated costRs 312.02 cr
Cost incurredRs 1.72 cr
Work done0.55%
BuildingWingEstimatedIncurred
Composite Building ENARs 261.37 crRs 1.72 cr
-NARs 50.65 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLeads Architectural Consultants
EngineerAmbadas Kharatmol Kharatmol
Chartered AccountantB R Nagda & Co
Chartered AccountantHarshad Doshi & Co.
PartnerRole in project
Floreat Investments Private Limited-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Aug 2031 → Dec 2031

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Dec 2031

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Odyssey- Form 1- Sept 2026.pdf20 Oct 2026
Withdrawal Update Form 2File: Odyssey- Form 2- Sept 2026 (Sale).pdf20 Oct 2026
Withdrawal Update Form 3File: Odyssey- Form 3- Sept 2026.pdf20 Oct 2026
Form 5 (FY 2024-2025)File: Odyssey- Form 5- FY 24-25.pdf9 Oct 2026
Form 5 (FY 2025-2026)File: Odyssey- Form 5- FY 2025-26 (signed).pdf30 Sep 2026
Layout approvalFile: Page 1 - Highlighted (Sanctioned BUA) (Permissible) (Parking).pdf8 Sep 2026
Building plan approvalFile: Page 4 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 5 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 6 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 7 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 8 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 9 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 10 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 11 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 12 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 13 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 14 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 15 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 16 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 17 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 18 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 19 - Floor Plans.pdf8 Sep 2026
Building plan approvalFile: Page 20 - Elevation.pdf8 Sep 2026
Building plan approvalFile: Page 21 - Elevation.pdf8 Sep 2026
Building plan approvalFile: Page 22 - Elevation.pdf8 Sep 2026
Building plan approvalFile: Page 23 - Elevation.pdf8 Sep 2026
Withdrawal Update Form 1File: Odyssey- Form 1- June 2026.pdf2 Sep 2026
Withdrawal Update Form 2File: Odyssey- Form 2- June 2026.pdf2 Sep 2026
Withdrawal Update Form 3File: Odyssey- Form 3- June 2026.pdf2 Sep 2026
Withdrawal Update Form 1File: Form 1- Odyssey- March 2026.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2- March 2026.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3 - March 2026.pdf10 Aug 2026
Withdrawal Update Form 1File: Declaration - JK Towers (Jun24).pdf25 Jul 2026
Withdrawal Update Form 1File: Form 1- Odyssey- Sept 2025.pdf25 Jul 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 - June 2025_11zon.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sept 2025.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 - June 2025.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 - Sept 2025.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf25 Jul 2026
Form 2A (FY 2024-2025)File: JK - QAQC Certificate (Mar25).pdf29 Jun 2026
Form 2A (FY 2025-2026)File: JK - RERA QAQC Cert (Mar26).pdf29 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JK - Promoter- Form 1- March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Odyssey1-No Withdrawal Declaration- Dec 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JK- No Progress Declaration (Dec 2024).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JK- No Progress Declaration (Dec 2024).pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Odyssey- No progress Declaration- Sept 2024.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Odyssey1-No Withdrawal Declaration- June 2024.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Odyssey1-No Withdrawal Declaration- Sept 2024.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Odyssey- No progress Declaration- Sept 2024.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Odyssey1- Form-5- FY 2023-24.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Odyssey1- Form-5- FY 2023-24.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration - JK Towers (Jun24).pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration - JK Towers (Jun24).pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Odyssey -Form 2A Declaration- Mar'24.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Odyssey -No Progress Declaration- Mar'24.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Odyssey -No Progress Declaration- Mar'24.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Odyssey1-No Withdrawal Declaration- Mar'24.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Odyssey -No Progress Declaration- Dec'23.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Odyssey -No Progress Declaration- Dec'23.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Odyssey- No Withdrawal Decln- Dec'23.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Odyssey -No Progress Declaration- Sept'23.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Odyssey -No Progress Declaration- Sept'23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: No Withdrawal Decln- Jun'23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: No Withdrawal Decln- Sept'23.pdf20 Oct 2023
Building plan approvalFile: Section A.pdf17 May 2023
Building plan approvalFile: Section B.pdf17 May 2023
Building plan approvalFile: Section C.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Section A.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Section B.pdf17 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Section C.pdf17 May 2023
Building plan approvalFile: Floor Plan 1.pdf16 May 2023
Building plan approvalFile: Floor Plan 2.pdf16 May 2023
Building plan approvalFile: Floor Plan 3.pdf16 May 2023
Building plan approvalFile: Odyssey- Clarification Letter for BUA, Floors and Apts.pdf16 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 1.pdf16 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 2.pdf16 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 3.pdf16 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Odyssey- Clarification Letter for BUA, Floors and Apts.pdf16 May 2023

How this compares with Mumbai City

17%of this project is bookeddistrict median 17%
36%of Mumbai City projects moved their completion datethis one moved by 4 months
23%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shapoorji Pallonji The Odyssey 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Girgaon790+ in Mumbai City

2 kmShapoorji Pallonji The OCompleted 17Lapsed / revoked 19Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 94 registered projects within 2 km.

Builder: Floreat Investments Private Limited

Floreat Investments Private Limited has 1 registration on MahaRERA, including Shapoorji Pallonji The Odyssey 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Shapoorji Pallonji The Odyssey 1 is delayed beyond 20 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shapoorji Pallonji The Odyssey 1?

The registered promoter entity is Floreat Investments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shapoorji Pallonji The Odyssey 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shapoorji Pallonji The Odyssey 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shapoorji Pallonji The Odyssey 1?

The professionals named in the filing: Architect: Leads Architectural Consultants; Engineer: Ambadas Kharatmol Kharatmol; Chartered Accountant: B R Nagda & Co; Chartered Accountant: Harshad Doshi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shapoorji Pallonji The Odyssey 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shapoorji Pallonji The Odyssey 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shapoorji Pallonji The Odyssey 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.