SHANTIPRASAD CO-OP HOUSING SOCIETY
RG-MH-72290 · RERA P51600052466 · Last updated on MahaRERA portal: 23 Oct 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHANTIPRASAD CO-OP HOUSING SOCIETY is a Residential / Group Housing project by VINAY MAGANLAL KARNAVAT in Nashik, Maharashtra, registered with MahaRERA as P51600052466 on 8 Sep 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 28 of the 60 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSHANTIPRASAD CO-OP HOUSING SOCIETY
- TypeResidential / Group Housing
- Location
- MOTWANI ROAD
- NEAR GUJRATHI HOSPITAL
- Nashik Road
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600052466
- ReraGenie IDRG-MH-72290
Builder
- NameVINAY MAGANLAL KARNAVAT
- Entity typeIndividual
- Other registrations3 more →
- Completed4 of 4
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Sep 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 23 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHANTIPRASAD CO-OP HOUSING SOCIEYT | NA | 7 | 7 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SHANTIPRASAD CO-OP HOUSING SOCIEYT: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHANTIPRASAD CO-OP HOUSING SOCIETY | Nashik Road | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHANTIPRASAD CO-OP HOUSING SOCIEYT | NA | Rs 5.00 cr | Rs 4.18 cr |
| - | NA | Rs 1.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MOHIT NITIN KARNAVAT |
| Engineer | UNEET VINAY KARNAVAT |
| Chartered Accountant | DILIP PANDURANG PALDE |
| Partner | Role in project |
|---|---|
| VINAY MAGANLAL KARNAVAT | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 2 ARCHITECT CERTIFICATE.pdf | 23 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 23 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf | 23 Oct 2025 |
| Occupational CertificateFile: SHANTIPRASAD_COMPLETION.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT0625.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE0625.pdf | 14 Oct 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration PERT.pdf | 27 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT 12_24.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE 12_24.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration PERT.pdf | 27 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT 09_24.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE 09_24.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration PERT.pdf | 27 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT 06_24.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE 06_24.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration PERT.pdf | 27 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT 03_24.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE 03_24.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration PERT.pdf | 27 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 27 Jun 2025 |
| Form 2File: FORM 2 ENGINEERS CERTIFICATE.pdf | 27 Jun 2025 |
| Form 3File: FORM 3 CA CERTIFICATE.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf | 27 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SHANTIPRASAD FY 23-24.pdf | 2 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT 03_24.pdf | 31 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT 06_24.pdf | 31 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT 09_24.pdf | 31 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT 12_24.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE 03_24.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE 06_24.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE 09_24.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE 12_24.pdf | 31 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf | 29 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf | 29 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrance.pdf | 30 Aug 2023 |
| Details of encumbrances concerned to LegalFile: encumbrance.pdf | 30 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance.pdf | 4 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance.pdf | 4 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 4 Aug 2023 |
| Proforma of Agreement for saleFile: sales deed.pdf | 4 Aug 2023 |
| CERSAI detailsFile: DISCLOSURE.pdf | 3 Aug 2023 |
| Building plan approvalFile: PLAN1.pdf | 13 Jul 2023 |
| Building plan approvalFile: PLAN2.pdf | 13 Jul 2023 |
| Layout approvalFile: LAY OUT_compressed.pdf | 13 Jul 2023 |
| PAN CardFile: PAN.pdf | 13 Jul 2023 |
| Copy of the legal title reportFile: legal title report.pdf | 13 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: LAY OUT_compressed.pdf | 13 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN1.pdf | 13 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN2.pdf | 13 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement shanti prasad.pdf | 13 Jul 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 13 Jul 2023 |
| Declaration in FORM BFile: FORM B.pdf | 13 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERETIFICATE.pdf | 13 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 13 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form-2A.pdf | 13 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep SHANTIPRASAD CO-OP HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR GUJRATHI HOSPITAL4,100+ in Nashik
Filed coordinates, straight-line distance. 82 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: VINAY MAGANLAL KARNAVAT
VINAY MAGANLAL KARNAVAT has 4 registrations on MahaRERA, including SAI LAXMI VILLAS and RAJGADH CO-OP HOUSING SOCIETY LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHANTIPRASAD CO-OP HOUSING SOCIETY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHANTIPRASAD CO-OP HOUSING SOCIETY?
The registered promoter entity is VINAY MAGANLAL KARNAVAT, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHANTIPRASAD CO-OP HOUSING SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHANTIPRASAD CO-OP HOUSING SOCIETY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHANTIPRASAD CO-OP HOUSING SOCIETY?
The professionals named in the filing: Architect: MOHIT NITIN KARNAVAT; Engineer: UNEET VINAY KARNAVAT; Chartered Accountant: DILIP PANDURANG PALDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHANTIPRASAD CO-OP HOUSING SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback