Home / Browse projects / Palghar, Maharashtra / SHANTI NIWAS

Registered No litigation declared Residential / Group Housing project

SHANTI NIWAS

By RAJLAXMI REDEVELOPERS

RG-MH-31055 · RERA P99000079389 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
73 of 108Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SHANTI NIWAS is a Residential / Group Housing project by RAJLAXMI REDEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000079389 on 3 Mar 2025. Possession is promised by 31 Dec 2028. 35 of the 108 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHANTI NIWAS
  • TypeResidential / Group Housing
  • Location
    • RAM MANDIR ROAD
    • VIRAR WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000079389
  • ReraGenie IDRG-MH-31055

Builder

  • NameRAJLAXMI REDEVELOPERS
  • Entity typePartnership
  • GSTIN27ABFFR9360J1ZO
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

32%35 of 108 units booked
40.8%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHANTI NIWASNA14149810108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

SHANTI NIWAS: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered24
Open Space63

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,323 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LTD
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on10 Dec 2025
LandownerVillageDistrict
SHANTI NIWAS CO OP HSG SOC LTDVasai-Virar City (M Corp)Palghar
SHANTI NIWAS CO OP HSG SOC LTDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Permissible FSI5640.8
Proposed, not sanctioned5,641 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD GR FLR SURVEY NO 265 MHATRE WADI NEAR VIRAR RAILWAY STATION VIRAR W MAHARASHTRA 401303
Estimated costRs 20.90 cr
Cost incurredRs 8.53 cr
Work done40.8%
BuildingWingEstimatedIncurred
SHANTI NIWASNARs 17.77 crRs 8.53 cr
-NARs 3.14 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKULDEEP B PATIL
EngineerMUKESH KUMAR
EngineerSANJAY B BELNEKAR
Chartered AccountantVIVEK J SANKHALA
Chartered AccountantRAVEENA SANKHALA
PartnerRole in project
RAJLAXMI REDEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Shanti Niwas.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Feb 2026
Withdrawal Update Form 3File: FORM 3(1).pdf21 Feb 2026
Withdrawal Update Form 1File: Redevelopers Form 1 Sep 25.pdf27 Jan 2026
Withdrawal Update Form 1File: Redevelopers Form 1 Sep 25.pdf27 Jan 2026
Withdrawal Update Form 1File: Redevelopers Form 1 Sep 25.pdf27 Jan 2026
Withdrawal Update Form 2File: Redevelopers Form 2 Sep 25.pdf27 Jan 2026
Withdrawal Update Form 2File: Redevelopers Form 2 Sep 25.pdf27 Jan 2026
Withdrawal Update Form 2File: Redevelopers Form 2 Sep 25.pdf27 Jan 2026
Withdrawal Update Form 3File: CA certificate (1).pdf27 Jan 2026
Withdrawal Update Form 3File: CA certificate (1).pdf27 Jan 2026
Withdrawal Update Form 3File: CA certificate (1).pdf27 Jan 2026
Layout approvalFile: MYSCAN_20251209_0002.PDF9 Dec 2025
Building plan approvalFile: MYSCAN_20251209_0004.PDF9 Dec 2025
Building plan approvalFile: MYSCAN_20251209_0003.PDF9 Dec 2025
Layout approvalFile: MYSCAN_20251209_0002.PDF9 Dec 2025
Building plan approvalFile: MYSCAN_20251209_0004.PDF9 Dec 2025
Building plan approvalFile: MYSCAN_20251209_0003.PDF9 Dec 2025
Layout approvalFile: MYSCAN_20251209_0002.PDF9 Dec 2025
Building plan approvalFile: MYSCAN_20251209_0004.PDF9 Dec 2025
Building plan approvalFile: MYSCAN_20251209_0003.PDF9 Dec 2025
Withdrawal Update Form 1File: FORM 1...pdf9 Dec 2025
Withdrawal Update Form 1File: FORM 1...pdf9 Dec 2025
Withdrawal Update Form 1File: FORM 1...pdf9 Dec 2025
Withdrawal Update Form 2File: FORM 2...pdf9 Dec 2025
Withdrawal Update Form 2File: FORM 2...pdf9 Dec 2025
Withdrawal Update Form 2File: FORM 2...pdf9 Dec 2025
Withdrawal Update Form 3File: SN FORM 3.pdf9 Dec 2025
Withdrawal Update Form 3File: SN FORM 3.pdf9 Dec 2025
Withdrawal Update Form 3File: SN FORM 3.pdf9 Dec 2025
Form 5 (FY 2024-2025)File: form 5 shanti niwas.pdf10 Oct 2025
Form 1File: FORM 1 SHANTI NIWAS20250912151818.pdf12 Sep 2025
Form 2File: FORM 2 SHANTI NIWAS20250912152010.pdf12 Sep 2025
Form 3File: FORM 3 SHANTI NIWAS20250912152202.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD20250912152408.pdf12 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A SHANTI NIWAS.pdf10 Sep 2025
Form 1File: FORM 1 SHANTI NIWAS.pdf31 Jul 2025
Form 2File: FORM 2 SHANTI NIWAS.pdf31 Jul 2025
Form 3File: FORM 3 SHANTI NIWAS.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shanti 1.pdf5 May 2025
Proforma of Agreement for saleFile: blank draft shanti niwas final.pdf30 Apr 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE20250307163006.pdf7 Mar 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE20250307163006.pdf7 Mar 2025
Other - FinanceFile: ENCUMBRANCE CERTIFICATE20250307163006.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf20 Feb 2025
Proforma of Agreement for saleFile: AGREEEMENT FOR SALE_RERA.pdf4 Jan 2025
Proforma of Allotment letterFile: ALLOTTMENT.pdf13 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: DESIGNATED.pdf13 Nov 2024
Other - LegalFile: CC approval.pdf29 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC with ambadend.pdf28 Oct 2024
CERSAI detailsFile: Undertaking for No CERSAI Report.pdf23 Oct 2024
Other - TechnicalFile: Annexure A Declaration cum undertaking.pdf23 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf22 Oct 2024
Layout approvalFile: sheet no 1 layout compressed.pdf17 Oct 2024
Building plan approvalFile: sheet no 2 BLDG PLAN compressed.pdf17 Oct 2024
Building plan approvalFile: Sheet No 3 BLDG PLAN compressed.pdf17 Oct 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance concerned to Finance.pdf17 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate concerned to Legal.pdf17 Oct 2024
Copy of Layout Approval (in case of layout)File: sheet no 1 layout compressed.pdf17 Oct 2024
Declaration in FORM BFile: FORM B DEVELOPER.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet no 2 BLDG PLAN compressed.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 3 BLDG PLAN compressed.pdf17 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC FORMAT D.pdf17 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect toAllottment letter.pdf17 Oct 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance concerned to Finance.pdf17 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate concerned to Legal.pdf17 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organizations of SHILPA SAMPAT.pdf17 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance availed for the project.pdf17 Oct 2024
Copy of the legal title reportFile: LEGAL TITLE SEARCH REPORT for RERA com.pdf15 Oct 2024
CERSAI detailsFile: CERSAI.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations of DHRUV MEHTA.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations of JIGAR SHAH.pdf15 Oct 2024
PAN CardFile: COMPANY PAN CARD.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KULDEEP_0001.pdf14 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Opening of RERA designated account.pdf14 Oct 2024

How this compares with Palghar

32%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHANTI NIWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR WEST3,200+ in Palghar

Builder: RAJLAXMI REDEVELOPERS

RAJLAXMI REDEVELOPERS has 2 registrations on MahaRERA, including SHANTI NIWAS and KRISHNA NIWAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHANTI NIWAS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANTI NIWAS?

The registered promoter entity is RAJLAXMI REDEVELOPERS, a partnership as per the filing. Its GSTIN 27ABFFR9360J1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANTI NIWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHANTI NIWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANTI NIWAS?

The professionals named in the filing: Architect: KULDEEP B PATIL; Engineer: MUKESH KUMAR; Engineer: SANJAY B BELNEKAR; Chartered Accountant: VIVEK J SANKHALA; Chartered Accountant: RAVEENA SANKHALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANTI NIWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANTI NIWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANTI NIWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.