ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SHANTI DHAM NAGARI

Registered No litigation declared Plotted project

SHANTI DHAM NAGARI

By Umesh Agrawal & Gopal Chandak

RG-MH-22936 · RERA P50500047190 · Last updated on MahaRERA portal: 30 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
32 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SHANTI DHAM NAGARI is a Plotted project by Umesh Agrawal & Gopal Chandak in Nagpur, Maharashtra, registered with MahaRERA as P50500047190 on 11 Oct 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 21 of the 53 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSHANTI DHAM NAGARI
  • TypePlotted
  • Location
    • Wela Harishchandra ROad
    • Wela Harishchandra
    • Wela harichandra
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500047190
  • ReraGenie IDRG-MH-22936

Builder

  • NameUmesh Agrawal & Gopal Chandak
  • Entity typeOthers
  • Named personsUMESH RAMCHIRPAL AGRAWAL, GOPAL JUGALKISHOR CHANDAK

Key dates

this monthRegisteredOct 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • BuildingsNot stated in filing
  • Documents filed77 files

Current status

40%21 of 53 units booked

Figures as on 30 Jan 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes70%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,018 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Nov 2025
LandownerVillageDistrict
UMESH RAMCHIRPAL AGRAWALNagpur (M Corp.)Nagpur
GOPAL JUGALKISHOR CHANDAKNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority
Permissible FSI11690.87
Proposed, not sanctioned11,691 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHARAMPETH NAGPUR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHAWAL HARSHE
EngineerDHAWAL HARSHE
Chartered AccountantAMEY DABKE
Chartered AccountantCHETAN BHANDIRGE & CO
PartnerRole in project
Umesh Agrawal & Gopal Chandak-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18122518744Dec 2025 → Dec 2026

Reason as filed by the promoterThe project work is pending to complete due to certain coordination challenges and slower execution than originally planned. Some activities required additional time to be carried out in the proper technical sequence. Availability of materials and skilled manpower also impacted the progress of work. The promoter has now reviewed the execution plan and arranged necessary resources. Extension is therefore requested to complete the project in a planned manner on or before 31/12/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Dec-25 ShantiDham.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 Dec-25 ShantiDham.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec-25 ShantiDham.pdf30 Jan 2026
Form 1File: Form 1 Sep-24-1-3.pdf21 Nov 2025
Form 2File: Form 2 Sep-24-4-7.pdf21 Nov 2025
Form 3File: Form 3 Sep-24.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Sep24.pdf21 Nov 2025
Form 1File: Form 1 Dec-24-1-3.pdf21 Nov 2025
Form 2File: Form 2 Dec-24-4-7.pdf21 Nov 2025
Form 3File: Form 3 Dec-24.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Dec24.pdf21 Nov 2025
Form 1File: Form 1 March-25-1-3.pdf21 Nov 2025
Form 2File: Form 2 March-25-4-7.pdf21 Nov 2025
Form 3File: Form 3 Mar-25.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Mar25.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 June-25-1-3.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 Sep-25-1-3.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 June-25-4-7.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 Sep-25-4-7.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Jun-25.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Sep-25.pdf21 Nov 2025
Form 2A (FY 2022-2023)File: 31.march.2023 DIVINE.pdf21 Nov 2025
Form 2A (FY 2023-2024)File: 31-march-2024 DIVINE.pdf21 Nov 2025
Form 2A (FY 2024-2025)File: 31-march-2025 DIVINE.pdf21 Nov 2025
Form 5 (FY 2022-2023)File: shantidham-11-10-2022 to 31-03-23.pdf21 Nov 2025
Form 5 (FY 2023-2024)File: shantidham-01-04-2023 to 31-03-2024.pdf21 Nov 2025
Form 5 (FY 2024-2025)File: shantidham-01-04-2024 to 31-03-2025.pdf21 Nov 2025
Form 1File: Form 1 Dec-22-1-3.pdf20 Nov 2025
Form 2File: Form 2 Dec-22-4-7.pdf20 Nov 2025
Form 3File: Form 3 Dec-22.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Dec-22.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Mar-23.pdf20 Nov 2025
Form 3File: Form 3 Mar-23.pdf20 Nov 2025
Form 2File: Form 2 March-23-4-7.pdf20 Nov 2025
Form 1File: Form 1 March-23-1-3.pdf20 Nov 2025
Form 1File: Form 1 June-23-1-3.pdf20 Nov 2025
Form 2File: Form 2 June-23-4-7.pdf20 Nov 2025
Form 3File: Form 3 Jun-23.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Jun-23.pdf20 Nov 2025
Form 1File: Form 1 Sep-23-1-3.pdf20 Nov 2025
Form 2File: Form 2 Sep-23-4-7.pdf20 Nov 2025
Form 3File: Form 3 Sep-23.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Sep-23.pdf20 Nov 2025
Form 1File: Form 1 Dec-23-1-3.pdf20 Nov 2025
Form 2File: Form 2 Dec-23-4-7.pdf20 Nov 2025
Form 3File: Form 3 Dec-23.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Dec-23.pdf20 Nov 2025
Form 1File: Form 1 March-24-1-3.pdf20 Nov 2025
Form 2File: Form 2 March-24-4-7.pdf20 Nov 2025
Form 3File: Form 3 Mar-24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Mar-24.pdf20 Nov 2025
Form 1File: Form 1 June-24-1-3.pdf20 Nov 2025
Form 2File: Form 2 June-24-4-7.pdf20 Nov 2025
Form 3File: Form 3 Jun-24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Shantidham S&U Jun-24.pdf20 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca updated.pdf19 Sep 2022
Proforma of Allotment letterFile: model agreement to sale.pdf14 Sep 2022
Proforma of Allotment letterFile: allotment letter.pdf14 Sep 2022
Deviation Report with respect to Allotment letterFile: deviation of allotment letter .pdf14 Sep 2022
Deviation Report with respect to model copy of AgreementFile: deviation of agreement to sale .pdf14 Sep 2022
Other - FinanceFile: organized CA CERTIFICATE.pdf9 Sep 2022
Layout approvalFile: MAP_compressed.pdf1 Sep 2022
Building plan approval or NA orderFile: NMRDA lette.pdf1 Sep 2022
PAN CardFile: BOTH PAN.pdf1 Sep 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf1 Sep 2022
Details of encumbrances concerned to FinanceFile: FInancial Encumbrance.pdf1 Sep 2022
Details of encumbrances concerned to LegalFile: Legal encumbrance.pdf1 Sep 2022
Copy of Layout Approval (in case of layout)File: MAP_compressed.pdf1 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: NMRDA lette.pdf1 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: NMRDA lette.pdf1 Sep 2022
Declaration about Commencement CertificateFile: Declaration for commencement.pdf1 Sep 2022
Declaration in FORM BFile: stamp paper 1.pdf1 Sep 2022
Declaration in FORM BFile: stamp paper 1.pdf1 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate .pdf1 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate1 .pdf1 Sep 2022
CERSAI detailsFile: CERSA.pdf1 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for separate bank.pdf1 Sep 2022

How this compares with Nagpur

40%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHANTI DHAM NAGARI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wela Harishchandra2,800+ in Nagpur

2 kmSHANTI DHAM NAGARICompleted 7Lapsed / revoked 11Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: Umesh Agrawal & Gopal Chandak

Umesh Agrawal & Gopal Chandak has 1 registration on MahaRERA, including SHANTI DHAM NAGARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SHANTI DHAM NAGARI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANTI DHAM NAGARI?

The registered promoter entity is Umesh Agrawal & Gopal Chandak, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANTI DHAM NAGARI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHANTI DHAM NAGARI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANTI DHAM NAGARI?

The professionals named in the filing: Architect: DHAWAL HARSHE; Engineer: DHAWAL HARSHE; Chartered Accountant: AMEY DABKE; Chartered Accountant: CHETAN BHANDIRGE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANTI DHAM NAGARI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANTI DHAM NAGARI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANTI DHAM NAGARI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.