Shantaram Park Residency

By Shubha Developers

RG-MH-25921 · RERA P51700009534 · Last updated on MahaRERA portal: 12 Dec 2025

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA
  • Completion date moved by 64 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 64 months from the original
13 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 90%
49 of 154Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Shantaram Park Residency is a Residential / Group Housing project by Shubha Developers in Thane, Maharashtra, registered with MahaRERA as P51700009534 on 22 Aug 2017. Possession is promised by 7 Dec 2026. The completion date has moved by 64 months from the original filing. 105 of the 154 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameShantaram Park Residency
  • TypeResidential / Group Housing
  • Location
    • Wafe Road
    • Wafe
    • Vafe
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009534
  • ReraGenie IDRG-MH-25921

Builder

  • NameShubha Developers
  • Entity typePartnership
  • PartnerShubha Mall

Key dates

this monthRegisteredAug 2017First promiseAug 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion7 Dec 2026
  • Revised completionRevised to 7 Dec 2026 (originally 1 Aug 2021)
  • Buildings2 building records
  • Documents filed54 files

Current status

68%105 of 154 units booked
94.6%Work done, per cost certificate

Figures as on 12 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type ANA871050105
Type BNA6549049

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

Type A65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Type B77%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 12 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed176

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots176
Closed/Covered2
Open Space174
BuildingClosed/CoveredOpen SpaceTotal
Type A18788
Type B18788

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,561 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Dec 2025
LandownerVillageDistrict
Sulbha Sudhakar DingoreVafeThane

Approvals and building plan

Sanctioning authorityTown Planning, Thane
Permissible FSI6666.28
Proposed, not sanctioned6,666 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1 to 4, Crystal, Near Gopal Sharma School, CTS No 10/9 off Chandivali, Powai, Mumbai 400076
Estimated costRs 16.64 cr
Cost incurredRs 15.75 cr
Work done94.63%
BuildingWingEstimatedIncurred
Type ANARs 8.42 crRs 7.16 cr
-NARs 5.30 crRs 5.86 cr
Type BNARs 2.92 crRs 2.72 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHISH VAIDHYA
EngineerRAVI MALL
Chartered AccountantNEHALI & CO
PartnerRole in project
Shubha Developers-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700010560Aug 2021 → Jul 2022

Reason as filed by the promoterDue to COVID-19 pandemic situation thus causing non-availability of labours for site work.

EXT51700013046Aug 2021 → Dec 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 27/12/2023

EXT51700017860Aug 2021 → Dec 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 27/12/2024

EXT51700025135Aug 2021 → Dec 2025

Reason as filed by the promoterDue to shortage of material and labor not able to complete please grant us extension till 27/12/2025

EA16122518702Aug 2021 → Dec 2026

Reason as filed by the promoterWe wish to bring to your kind attention the progress and challenges faced in the timely completion of our real estate project, Shantaram Park Residency, located at Shahpur, Thane. As of today, out of the two buildings in the project-Type-A and Type-B, Type-B is 100% and Type-A is 90% complete. The completion of Type-A has been delayed due to circumstances beyond our control. Despite our sincere efforts to adhere to the project timeline, several unforeseen challenges impacted progress: 1. Delay in Availability of Skilled Labour The project faced persistent shortages of skilled and semi-skilled

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000198487SHANTARAM PARK RESIDENCY ALLOTTEEWELFARE ASSOCIATIONSHUBHA DEVELOPERS09/10/2021
CC12400602Subhash Gobaru MoreShubha Developers28/10/2024
CC12501778shalaka sameer kadamShubha Developers30/05/2025
CC12502864RAJENDRA MURALIDHAR GANGURDEShubha Developers15/08/2025
CC12503120Asha Sahebrao PatilShubha Developers04/09/2025
CC12600521Mukesh Rajbal TyagiShubha Developers30/01/2026
CC12604065Amol Komalsingh ThokeShubha Developers30/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 7 Dec 2026

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Architect Certificate 30-11-25.pdf12 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Form-2 30-9-25.pdf12 Dec 2025
Withdrawal Update Form 3File: Form-3 Signed CA Certificate Sept-25.pdf12 Dec 2025
Withdrawal Update Form 1File: Form-1 Architect Certificate.pdf11 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Form-2 1-7-25.pdf11 Dec 2025
Withdrawal Update Form 3File: Form-3 Sept-23 Scanned.pdf11 Dec 2025
Declaration in FORM BFile: Form B Scanned 26-11-24.pdf27 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf21 Nov 2024
Certificates of CA (Form 3)File: form 3.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf16 Oct 2024
Certificates of CA (Form 3)File: Form 3.pdf16 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 23-24.pdf16 Oct 2024
Declaration in FORM BFile: Form B - Affidavit 20-10-23 - R2 (1).pdf27 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate 1-10-23.pdf27 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form-2 01-10-23.pdf27 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (quality assurance) 19-10-23.pdf27 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Disclosure 1-10-23.pdf27 Oct 2023
Certificates of CA (Form 3)File: Form-3 Sept-23 Scanned.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Scanned 22-23.pdf27 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer form 2A 21-22.pdf8 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 21-22 Scanned.pdf8 Dec 2022
Disclosure of sold/ booked inventoryFile: Inventory Disclosure 17-8-22.pdf19 Aug 2022
CERSAI detailsFile: CERSAI DECLARATION.pdf19 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf19 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Form 2 - 24-2-22.pdf15 Mar 2022
Certificates of CA (Form 3)File: CA Form 3 11-3-22 Compressed.pdf15 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 24-2-22.pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 17-18.pdf19 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf19 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf19 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: TP Approval (1) CC.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - 19-20.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - 20-21.pdf8 Jul 2021
Disclosure of sold/ booked inventoryFile: inventory disclosure.pdf8 Jul 2021
Declaration about Commencement CertificateFile: CC COVERING LETTER.pdf7 Jul 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE-BLANK AGGREMENT - RERA.pdf5 Jul 2019
Building plan approvalFile: TP Approval_opt.pdf31 Jul 2017
Building Plan Approval (IOD)File: TP Approval_opt.pdf31 Jul 2017
Declaration in FORM BFile: Form B - Shubha Developers_opt.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 - Architect Certificate_opt.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - Engineer Certificate_opt.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form-3 - CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT FOR SALE-BLANK AGGREMENT - RERA.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter - BLANK.pdf31 Jul 2017
Layout approvalFile: SP Approved DWG 1.pdf28 Jul 2017
Layout approvalFile: TP Approval_opt.pdf28 Jul 2017
PAN CardFile: Shubha Developers PAN.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate Original_opt.pdf28 Jul 2017
Details of encumbrancesFile: No Encumbrances Declaration.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: SP Approved DWG 1.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: TP Approval_opt.pdf28 Jul 2017

How this compares with Thane

68%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 64 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shantaram Park Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wafe7,600+ in Thane

2 kmShantaram Park ResidencyCompleted 14Lapsed / revoked 18Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Shubha Developers

Shubha Developers has 1 registration on MahaRERA, including Shantaram Park Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Shantaram Park Residency is delayed beyond 7 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shantaram Park Residency?

The registered promoter entity is Shubha Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shantaram Park Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shantaram Park Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shantaram Park Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shantaram Park Residency?

The professionals named in the filing: Architect: ASHISH VAIDHYA; Engineer: RAVI MALL; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shantaram Park Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shantaram Park Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shantaram Park Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.