Shankheshwar Heights

By Siddheshwar Construction Co.

RG-MH-88644 · RERA P51900018161 · Last updated on MahaRERA portal: 22 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
20 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
43 of 130Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Shankheshwar Heights is a Others project by Siddheshwar Construction Co. in Mumbai City, Maharashtra, registered with MahaRERA as P51900018161 on 11 Oct 2018. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 87 of the 130 units on this registration are recorded sold or booked, and 20 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameShankheshwar Heights
  • TypeOthers
  • Location
    • PATIL GALLI
    • CHUNABHATTI
    • Mumbai City
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900018161
  • ReraGenie IDRG-MH-88644

Builder

  • NameSiddheshwar Construction Co.
  • Entity typePartnership
  • PartnersRupraj Thanmal Jain, Manohar Pandurang Waje, Dhanesh Rupraj Jain

Key dates

this monthRegisteredOct 2018First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2018
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings4 building records
  • Documents filed109 files

Current status

67%87 of 130 units booked
87.7%Work done, per cost certificate

Figures as on 22 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A- WingNA109505
B-WingNA242454559
C-WingNA242461566
D-WingNA2424000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

A- Wing80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
B-Wing63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
C-Wing63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
D-Wing79%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 22 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed108

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots108
Closed/Covered108
BuildingClosed/CoveredTotal
B-Wing5454
C-Wing5454

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,163 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RUPRAJ JAINNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI15757.61
Proposed, not sanctioned13,434 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChembur East Mumbai
Estimated costRs 58.15 cr
Cost incurredRs 50.97 cr
Work done87.66%
BuildingWingEstimatedIncurred
A- WingNARs 13.81 crRs 12.71 cr
B-WingNARs 13.81 crRs 12.71 cr
C-WingNARs 13.81 crRs 12.71 cr
D-WingNARs 13.81 crRs 12.71 cr
-NARs 2.91 crRs 14.54 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAspire Architects & Consultants
EngineerSK Consultants & Engineers
Chartered AccountantAmit S. Salvi & CO.
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Siddheshwar Construction Co.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03062621222Jun 2026 → Jun 2027

Reason as filed by the promoterThe delay has occurred due to the pending construction work, which remains incomplete and has consequently impacted the timely completion of the project. Certain construction activities, including finishing and allied infrastructural works, could not be completed within the stipulated timeline due to execution-related challenges, coordination issues, and practical site constraints encountered during the course of development. These circumstances adversely affected the pace of progress and resulted in an unavoidable delay in achieving project completion within the prescribed period. Despite the

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000591439Prajakta KerkarSiddheshwar Construction Co.20/08/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Shankeshwar Heights June 26_compressed.pdf22 Aug 2026
Withdrawal Update Form 2File: Form 2 - Shankeshwar Heights June 26.pdf22 Aug 2026
Withdrawal Update Form 3File: Form 3 - Shankeshwar Heights June 26.pdf22 Aug 2026
Withdrawal Update Form 1File: Form 1 Shankeshwar Heights June 26.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 - Shankheshwar Heights as on March 2026.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 - Shankheshwar Heights as on March 2026.pdf12 Aug 2026
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Shankeshwar Heights.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 - Shankheshwar Heights as on March 2026_compressed.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 - Shankheshwar Heights as on March 2026.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3 - Shankheshwar Heights as on March 2026.pdf3 Jun 2026
Form 1File: Form 1 - Shankheshwar Heights as on June 2025.pdf7 Mar 2026
Form 2File: Form 2 - Shankeshwar Heights as on June 2025.pdf7 Mar 2026
Form 3File: Form 3 - Shankeshwar Heights as on June 2025.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shankheshwar Heights as on June 2025.pdf7 Mar 2026
Form 1File: Form 1 - Shankeshwar Heights as on Sep 2025.pdf7 Mar 2026
Form 2File: Form 2 - Shankeshwar Heights as on Sep 2025.pdf7 Mar 2026
Form 3File: Form 3 - Shankeshwar Heights as on Sep 2025.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shankheshwar Heights as on Sep 2025.pdf7 Mar 2026
Form 1File: Form 1 - Shankheshwar Heights as on Dec 2025.pdf7 Mar 2026
Form 2File: Form 2 - Shankeshwar Heights as on Dec 2025.pdf7 Mar 2026
Form 3File: Form 3 - Shankheshwar Heights as on Dec 2025.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shankheshwar Heights as on Dec 2025.pdf7 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHANKHESHWAR HEIGHTS 30-6-24.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shankeshwar Heights as on Dec 2024.pdf1 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Shankheshwar Heights Form 2A 19-20.pdf28 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shankheshwar Heights Form 2A 20-21.pdf28 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shankheshwar heights Form 2A 22-23.pdf28 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Shankheshwar heights Form 2A 23-24.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shankheshwar Heights as on JUNE 2024 (1).pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf15 Feb 2025
Certificates of CA (Form 3)File: 8 Certificates of CA (Form 3).pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shankheshwar Heights- March 2023.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shankheshwar Heights- 31-03-2024.pdf11 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Shankeshwar Heights as on Dec 2024.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shankeshwar Heights as on Dec 2024.pdf10 Feb 2025
Details of encumbrancesFile: Encumbrance - Shankheshwar Heights.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Shankeshwar Heights as On 31-12-24.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OF SHANKESHWAR HEIGHTS AS ON 30-09-24.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 Of Shankeshwar Heights as on 30-09-24.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 Of Shankeshwar Heights as on 30-09-24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shankeshwar Heights as on September 2024.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Of Shankeshwar Heights As On 30-09-34.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Jul 2024
Certificates of CA (Form 3)File: 4 Certificates of CA (Form 3).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHANKHESHWR HEIGHTS03282024.pdf28 Mar 2024
Certificates of CA (Form 3)File: Siddheshwar RERA_compressed.pdf28 Mar 2024
Other - FinanceFile: 03202024_0001.pdf20 Mar 2024
Disclosure of sold/ booked inventoryFile: 03152024.pdf16 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 29-Feb-2024.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: Adobe Scan 27-Oct-2023.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 25-Oct-2023.pdf25 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22.pdf8 Sep 2023
Disclosure of sold/ booked inventoryFile: CCF20230623.pdf23 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf28 Feb 2023
Declaration about Commencement CertificateFile: Declaration about cc.pdf16 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-I_Jun-22.pdf16 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-II_Jun-22.pdf16 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA Form 2A_Jun-22.pdf16 Aug 2022
Disclosure of sold/ booked inventoryFile: DocScanner Aug 12, 2022 4-44 PM_2.pdf16 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Siddheshwar 18-19.pdf16 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Siddheshwar 19-20.pdf16 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Siddheshwar 20-21.pdf16 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf28 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf28 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC -Shankeshwar.pdf18 Jul 2022
CERSAI detailsFile: Shankeshwar Heights.pdf5 Jul 2022
Layout approvalFile: IOA-17-01-2022-1.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-5.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-8.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-2.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-3.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-4.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-6.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-7.pdf17 Jun 2022
Layout approvalFile: IOA-17-01-2022-6.pdf17 Jun 2022
Copy of Layout Approval (in case of layout)File: IOA-17-01-2022-2.pdf17 Jun 2022
Copy of Layout Approval (in case of layout)File: IOA-17-01-2022-3.pdf17 Jun 2022

How this compares with Mumbai City

67%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shankheshwar Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHUNABHATTI780+ in Mumbai City

2 kmShankheshwar HeightsCompleted 24Lapsed / revoked 10Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: Siddheshwar Construction Co.

Siddheshwar Construction Co. has 1 registration on MahaRERA, including Shankheshwar Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Shankheshwar Heights is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shankheshwar Heights?

The registered promoter entity is Siddheshwar Construction Co., a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shankheshwar Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shankheshwar Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shankheshwar Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shankheshwar Heights?

The professionals named in the filing: Architect: Aspire Architects & Consultants; Engineer: SK Consultants & Engineers; Chartered Accountant: Amit S. Salvi & CO.; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shankheshwar Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shankheshwar Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shankheshwar Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.