ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHANKAR HOMES

Registered No litigation declared Others project

SHANKAR HOMES

By RAHUL SAWALARAM KENI

RG-MH-05517 · RERA P52000052186 · Last updated on MahaRERA portal: 19 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
42 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

SHANKAR HOMES is a Others project by RAHUL SAWALARAM KENI in Raigarh, Maharashtra, registered with MahaRERA as P52000052186 on 27 Jul 2023. Possession is promised by 31 Mar 2027. 7 of the 49 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHANKAR HOMES
  • TypeOthers
  • Location
    • PLOT NO 67
    • SECTOR - R 2 PUSHPAK
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052186
  • ReraGenie IDRG-MH-05517

Builder

  • NameRAHUL SAWALARAM KENI
  • Entity typeIndividual

Key dates

this monthRegisteredJul 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

14%7 of 49 units booked
72.3%Work done, per cost certificate

Figures as on 19 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHANKAR HOMESNA7744549

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHANKAR HOMES: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered32
Open Space7

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area669 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Feb 2026
LandownerVillageDistrict
DILIP SHANTARAM KENIKaranjadeRaigarh
JAGDISH SAWALARAM KENIKaranjadeRaigarh
RAHUL SAWALARAM KENIKaranjadeRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation
Permissible FSI2154.1
Proposed, not sanctioned2,154 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOPS NO 5,6,7,8 MORESHWAR HEIGHTS KAMOTHE NAVI MUMBAI KAMOTHE MAHARASHTRA - 410209
Estimated costRs 3.83 cr
Cost incurredRs 2.77 cr
Work done72.34%
BuildingWingEstimatedIncurred
SHANKAR HOMESNARs 3.48 crRs 2.77 cr
-NARs 34.80 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAYUR JAIN
EngineerS V PATEL & ASSOCIATES
Chartered AccountantG S DESAI & ASSOCIATES
PartnerRole in project
RAHUL SAWALARAM KENI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Mar 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf19 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Feb 2026
Withdrawal Update Form 2File: FORM NO - 2.pdf19 Feb 2026
Withdrawal Update Form 2File: FORM NO - 2.pdf19 Feb 2026
Withdrawal Update Form 2File: FORM NO - 2.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM-3 SIGN.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM-3 SIGN.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM-3 SIGN.pdf19 Feb 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO - 2.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: BOOKED INVENTRY.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO -2.pdf26 Nov 2024
Disclosure of sold/ booked inventoryFile: BOOKED INVENTRY 30-09-24.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Architect's Certificate.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: BOOKED INVENTRY 30-06-24.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R2 - FORM 1.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf11 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A till 31 03 2024.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: SOLE INVENTORY.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf8 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect's Certificate.pdf29 Apr 2024
Layout approvalFile: DRAWING.pdf5 Feb 2024
Building plan approvalFile: DRAWING.pdf5 Feb 2024
Copy of Layout Approval (in case of layout)File: DRAWING.pdf5 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: DRAWING.pdf5 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: SIGNED Disclosure of Sold Inventory.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Jan 2024
Other - LegalFile: CORRECTION FORMAT.pdf15 Jan 2024
Layout approvalFile: CC DRAWING.pdf25 Nov 2023
Building plan approvalFile: CC DRAWING.pdf25 Nov 2023
Copy of Layout Approval (in case of layout)File: CC DRAWING.pdf25 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: CC DRAWING.pdf25 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Nov 2023
Copy of the legal title reportFile: NEW TITILE SERACH REPORT.pdf24 Jul 2023
Other - FinanceFile: Rahul Chief Promoter-.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf23 Jun 2023
Deviation Report with respect to Allotment letterFile: THE DEVIATION Allotment Letter_compressed.pdf7 Jun 2023
Deviation Report with respect to model copy of AgreementFile: THE DEVIATION agreement to sale_compressed.pdf7 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf5 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf18 May 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf11 May 2023
Building plan approvalFile: CIDCO_DRAWING SIGNED.pdf10 May 2023
Layout approvalFile: CIDCO_DRAWING SIGNED.pdf10 May 2023
Details of encumbrances concerned to FinanceFile: LEGAL.pdf10 May 2023
Details of encumbrances concerned to LegalFile: LEGAL.pdf10 May 2023
Copy of Layout Approval (in case of layout)File: CIDCO_DRAWING SIGNED.pdf10 May 2023
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_DRAWING SIGNED.pdf10 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 May 2023
Declaration about Commencement CertificateFile: DECLARATION OF C C.pdf10 May 2023
Declaration in FORM BFile: Rahul Keni FORM-B.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf10 May 2023
CERSAI detailsFile: CERSAI.pdf10 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: REAL ESTATE ORGANIZATIONS.pdf10 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK ACCOUNT DETAILS.pdf10 May 2023
Other - LegalFile: Agreement To Lease_splitPDF_Page1-24_CompressPdf.pdf10 May 2023
Other - LegalFile: Agreement To Lease_splitPDF_Page25-48.pdf10 May 2023
Other - LegalFile: Agreement To Lease_splitPDF_Page49-72_CompressPdf.pdf10 May 2023
PAN CardFile: RAHUL KENI PAN.pdf9 May 2023
Details of encumbrances concerned to FinanceFile: DECLARATION RELATED OF FINANCE.pdf9 May 2023
Details of encumbrances concerned to LegalFile: DECLARATION RELATED OF FINANCE.pdf9 May 2023

How this compares with Raigarh

14%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHANKAR HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR - R 2 PUSHPAK5,900+ in Raigarh

2 kmSHANKAR HOMESCompleted 132Lapsed / revoked 46Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 292 registered projects within 2 km.

Builder: RAHUL SAWALARAM KENI

RAHUL SAWALARAM KENI has 1 registration on MahaRERA, including SHANKAR HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHANKAR HOMES is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANKAR HOMES?

The registered promoter entity is RAHUL SAWALARAM KENI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANKAR HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHANKAR HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANKAR HOMES?

The professionals named in the filing: Architect: MAYUR JAIN; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: G S DESAI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANKAR HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANKAR HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANKAR HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.