ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHALOM ELEGANT

Registration lapsed No litigation declared Residential / Group Housing project

SHALOM ELEGANT

By JACOB VERGHESE GEORGE

RG-MH-04549 · RERA P52000021982 · Last updated on MahaRERA portal: 15 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 29 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

SHALOM ELEGANT is a Residential / Group Housing project by JACOB VERGHESE GEORGE in Raigarh, Maharashtra, registered with MahaRERA as P52000021982 on 25 Aug 2019. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 29 months from the original filing.

At a glance

Project

  • NameSHALOM ELEGANT
  • TypeResidential / Group Housing
  • Location
    • Sector - 19
    • Ulwe
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000021982
  • ReraGenie IDRG-MH-04549

Builder

  • NameJACOB VERGHESE GEORGE
  • Entity typeIndividual

Key dates

10 months past promisethis monthRegisteredAug 2019First promiseJul 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2019
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 30 Jul 2023)
  • Buildings1 building record
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHALOM ELEGANTNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

SHALOM ELEGANT: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.76%

Progress on shared amenities15

As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area796 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1194.05
Proposed, not sanctioned1,194 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchP B NO 172 NO51 APSARA APARTMENTS SECTOR 17 VASHI NAVI MUMBAI 400 705 MAHARASHTRA

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
JACOB VERGHESE GEORGE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017341Jul 2023 → Dec 2025

Reason as filed by the promoterWe sincerely apologize for the delay in both the completion of the project and the submission of this application. The delay has been caused due to procurement issues, site conditions, coordination challenges, delay in obtaining the Occupancy Certificate (OC), and insufficient funds. Currently, the project is 95% completed based on the current sanctioned plans. However, we are in the process of obtaining additional Floor Space Index (FSI) and making necessary changes to the approved plans. Due to these modifications, we require an extension to complete the remaining work and secure the OC. We

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 May 2023

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: PERT Chart RERA.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March 2025.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate March 2025.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance 2019-20.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance 2020-21.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular-29.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance 2021-22.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance 2023-2024.pdf14 Apr 2025
Declaration in FORM BFile: Form B 500Rs.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nov 24.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shalom Elegant as on 30-09-2024.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of Shalom Elegant as on 30-09-2024.pdf26 Feb 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf26 Feb 2025
Declaration about Commencement CertificateFile: Format D.pdf26 Feb 2025
CERSAI detailsFile: Cersai Declaration.pdf26 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration .pdf26 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 Shalom.pdf26 Feb 2025
Declaration in FORM BFile: Form B.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nov 24.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23 Shalom.pdf27 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: WhatsApp.pdf30 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Shalom Elegant FY 2021-22.pdf4 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20 Shalom Elegant (1).pdf23 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21 Shalom Elegant.pdf23 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: sj developers cc(2)_2-end_1-6.pdf9 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: sj developers cc(2)_2-end_7-end.pdf9 Aug 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sj developers.pdf9 Aug 2019
Proforma of Allotment letterFile: S J DEVELOPERS_SHALOM ELEGANT (1).pdf9 Aug 2019
Layout approvalFile: ilovepdf_merged.pdf7 Aug 2019
Building plan approvalFile: ilovepdf_merged.pdf7 Aug 2019
Copy of the legal title reportFile: sj title certificate_compressed.pdf7 Aug 2019
Details of encumbrancesFile: encumbrance sj developers.pdf7 Aug 2019
Copy of Layout Approval (in case of layout)File: ilovepdf_merged.pdf7 Aug 2019
Building Plan Approval (IOD)File: ilovepdf_merged.pdf7 Aug 2019
Declaration in FORM BFile: sj developers form B notarised_compressed.pdf7 Aug 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 29 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHALOM ELEGANT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulwe5,900+ in Raigarh

Builder: JACOB VERGHESE GEORGE

JACOB VERGHESE GEORGE has 1 registration on MahaRERA, including SHALOM ELEGANT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that SHALOM ELEGANT shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHALOM ELEGANT is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHALOM ELEGANT?

The registered promoter entity is JACOB VERGHESE GEORGE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHALOM ELEGANT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHALOM ELEGANT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SHALOM ELEGANT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHALOM ELEGANT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHALOM ELEGANT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.