ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Shalimar Residency

Registration lapsed No litigation declared Residential / Group Housing project

Shalimar Residency

By Shalimar Constructions

RG-MH-24239 · RERA P52100008184 · Last updated on MahaRERA portal: 5 May 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 85 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2019Possession promised85 months past this date
3 of 11Construction stages donefurthest along: Internal walls, 98%
0Complaints at MahaRERAon this registration
Jump to the 33 documents Report an error

Shalimar Residency is a Residential / Group Housing project by Shalimar Constructions in Pune, Maharashtra, registered with MahaRERA as P52100008184 on 18 Aug 2017. Possession was promised by 30 Sep 2019 and is now 85 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameShalimar Residency
  • TypeResidential / Group Housing
  • Location
    • Dhanori - Lohegaon Road
    • Sathe Vasti
    • LOHGAON
    • Haveli
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100008184
  • ReraGenie IDRG-MH-24239

Builder

  • NameShalimar Constructions
  • Entity typePartnership
  • PartnersJaved Harun Sayyed, Shahanawaz Husain Shaikh
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

85 months past promisethis monthRegisteredAug 2017First promiseSep 2018Revised toSep 2019

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Sep 2019
  • Revised completionRevised to 30 Sep 2019 (originally 30 Sep 2018)
  • Buildings1 building record
  • Documents filed33 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shalimar ResidencyNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

Shalimar Residency: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 5 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,102 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
BHALCHANDRA GANGADHAR SASTEPune (M Corp.)Pune
ARUNA GAJANAN DESHMUKHPune (M Corp.)Pune
RUKMINI PRAKASH VANJAREPune (M Corp.)Pune

Approvals and building plan

Permissible FSI1709.08
Proposed, not sanctioned1,709 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchParmar House, 2413 East Street, Gen Thimayya Road, Camp, Pune 411 001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmannulla Shabbir Inamdar
EngineerV M Consultant
PartnerRole in project
Shalimar Constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100000688Sep 2018 → Sep 2019

Reason as filed by the promoterRespected Sir/Madam, We Shalimar Constructions have registered the project under MAHARERA by the name “SHALIMAR RESIDENCY”. And the project registration number is P52100008184. We would like to inform you that we have obtained the occupancy certificate of 27 units/flats against the 32 units/flats. Which are 100% completed and ready for possession. Only 5 units are left to obtain occupancy certificate because some finishing work is pending. We request you to please grant us the extension period of 1 year to complete all the finishing work and to obtain final occupancy certificate of the remaini

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed33

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: shalimar From3 26 4 23_compressed (1).pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: shalimar Form5 20-21.pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: shalimar From5 21-22.pdf5 May 2023
Certificates of CA (Form 3)File: Form 3 Shalimar 29-Apr-2023 17-45-24(2)_compressed_compressed.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Shalimar 2021 29-Apr-2023 17-53-52.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: shalimar constructtions rerra form 2019-2020.pdf26 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Shalimar Construction RERAFORM5.pdf25 Jun 2021
Building plan approvalFile: plan 1-2-comps.pdf29 Sep 2018
Building plan approvalFile: plan 2-2 comps.pdf29 Sep 2018
Building Plan Approval (IOD)File: plan 1-2-comps.pdf29 Sep 2018
Building Plan Approval (IOD)File: plan 2-2 comps.pdf29 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate 2018-compressed.pdf29 Sep 2018
OtherFile: occupancy certificate.pdf29 Sep 2018
OtherFile: NA Order (1).pdf9 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: ShalimarCommencement-ilovepdf-compressed-ilovepdf-compressed.pdf31 Mar 2018
Copy of the legal title reportFile: Searchtitle.pdf3 Aug 2017
Details of encumbrancesFile: Shalimar.pdf3 Aug 2017
Declaration in FORM BFile: FORM B-ilovepdf-compressed.pdf3 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf3 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer-certificate.pdf3 Aug 2017
Certificates of CA (Form 3)File: CAForm3-ilovepdf-compressed.pdf3 Aug 2017
Layout approvalFile: HPSC1195-ilovepdf-compressed.pdf31 Jul 2017
Building plan approvalFile: HPSC1196-ilovepdf-compressed.pdf31 Jul 2017
Building plan approvalFile: HPSC1197-ilovepdf-compressed.pdf31 Jul 2017
Building plan approvalFile: HPSC1198-ilovepdf-compressed.pdf31 Jul 2017
Building plan approvalFile: HPSC1199-ilovepdf-compressed.pdf31 Jul 2017
PAN CardFile: PAN.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: HPSC1195-ilovepdf-compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: HPSC1196-ilovepdf-compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: HPSC1197-ilovepdf-compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: HPSC1198-ilovepdf-compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: HPSC1199-ilovepdf-compressed.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement to sale.pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shalimar Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sathe Vasti13,700+ in Pune

2 kmShalimar ResidencyCompleted 58Lapsed / revoked 23Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: Shalimar Constructions

Shalimar Constructions has 2 registrations on MahaRERA, including Shalimar Residency and PRAGATI TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Shalimar Residency shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Shalimar Residency is delayed beyond 30 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shalimar Residency?

The registered promoter entity is Shalimar Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shalimar Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shalimar Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shalimar Residency?

The professionals named in the filing: Architect: Amannulla Shabbir Inamdar; Engineer: V M Consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shalimar Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shalimar Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shalimar Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.