ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / SHAHID NAGAR

Registered No litigation declared Others project

SHAHID NAGAR

By NEUMEC AND SANGAM JV

RG-MH-23957 · RERA P51900002527 · Last updated on MahaRERA portal: 16 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 42 months from the original
8 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
21 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

SHAHID NAGAR is a Others project by NEUMEC AND SANGAM JV in Mumbai City, Maharashtra, registered with MahaRERA as P51900002527 on 1 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 42 months from the original filing. 18 of the 39 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHAHID NAGAR
  • TypeOthers
  • Location
    • 207 REGENT CHAMBER
    • NARIMAN POINT
    • Mumbai City
    • 400021
  • Pincode400021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900002527
  • ReraGenie IDRG-MH-23957

Builder

  • NameNEUMEC AND SANGAM JV
  • Entity typeOthers
  • Named personsNEUMEC BUILDER AND DEVELOPER`, Neumec Development & Allied Services Pvt Ltd
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseJun 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed160 files

Current status

46%18 of 39 units booked

Figures as on 16 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAHID NAGARNA8303939

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

SHAHID NAGAR: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,658 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI3284.31
Proposed, not sanctioned3,284 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5C II, MITAL COURT,224 NARIMAN POINT

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
NEUMEC AND SANGAM JV-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900024546Jun 2024 → Jun 2025

Reason as filed by the promoterThe delay in the completion of the project has occurred due to several unforeseen challenges, primarily: 1. Impact of the COVID-19 Pandemic: The pandemic caused significant disruptions, including delays in the remobilization of workers after the lockdowns and travel restrictions were lifted, resulting in labor shortages and hindering the progress of the project. In addition to the above, the delay has also been caused by procurement issues, unforeseen site conditions, coordination challenges. We are pleased to inform you that the project is now 100% completed. We are in the process of applying

EA11092502560Jun 2024 → Dec 2027

Reason as filed by the promoterI, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P51900002527. As per HEARING DATED 3rd November 2025, Hon'ble Shri Manoj Saunik Sir granted Extension upto 31.12.2027. The order is uploaded in Other Tab for your reference

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Dec 2024.pdf16 Jan 2026
Withdrawal Update Form 2File: _Form_2__Mar_24.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shahid Nagar as on June 2025 (SIGNED).pdf16 Jan 2026
Commencement certificateFile: NB___D_Shahid_Nagar_CC_Composit_Bldg_No1_31-07-2024 (2).pdf11 Sep 2025
Building plan approvalFile: N_B_D_Shahid_Nagar_Bldg_NO-1_IOD_with_Plan_31-07-2024.pdf11 Sep 2025
Withdrawal Update Form 1File: Form 1 Dec 2024.pdf11 Sep 2025
Withdrawal Update Form 1File: Form 1 Dec 2024.pdf11 Sep 2025
Withdrawal Update Form 2File: _Form_2__Mar_24.pdf11 Sep 2025
Withdrawal Update Form 2File: _Form_2__Mar_24.pdf11 Sep 2025
Withdrawal Update Form 3File: Form 3 - Shahid Nagar as on June 2025.pdf11 Sep 2025
Withdrawal Update Form 3File: Form 3 - Shahid Nagar as on June 2025 (SIGNED).pdf11 Sep 2025
Certificates of CA (Form 3)File: Form 3 - Shahid Nagar as on March 2025.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shahid Nagar as on March 2025.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Circular_-_29.pdf29 Mar 2025
Other - TechnicalFile: PERT Shahid nagar.pdf29 Mar 2025
Other - TechnicalFile: Pert chart.pdf29 Mar 2025
Declaration in FORM BFile: Form-B.pdf28 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2024.pdf28 Mar 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024_compressed.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2024.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: Circular 29 Dec 2024.pdf28 Mar 2025
Certificates of CA (Form 3)File: Form 3 of Shahid Nagar as on 30-09-2024.pdf18 Jan 2025
Certificates of CA (Form 3)File: Form 3 of Shahid Nagar as on 31-12-2024.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shahid Nagar as on 31-12-2024.pdf18 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shahid Nagar as on 30-09-2024.pdf18 Jan 2025
Layout approvalFile: Copy of Layout.pdf14 Nov 2024
Building plan approvalFile: 1.pdf14 Nov 2024
Building plan approvalFile: 2.pdf14 Nov 2024
Building plan approvalFile: 3.pdf14 Nov 2024
Building plan approvalFile: 4.pdf14 Nov 2024
Building plan approvalFile: 5.pdf14 Nov 2024
Building plan approvalFile: 6.pdf14 Nov 2024
Building plan approvalFile: 7.pdf14 Nov 2024
Building plan approvalFile: 8.pdf14 Nov 2024
Building plan approvalFile: 9.pdf14 Nov 2024
Copy of Layout Approval (in case of layout)File: Copy of Layout.pdf14 Nov 2024
Building Plan Approval (IOD)File: 2.pdf14 Nov 2024
Building Plan Approval (IOD)File: 9.pdf14 Nov 2024
Building Plan Approval (IOD)File: 8.pdf14 Nov 2024
Building Plan Approval (IOD)File: 7.pdf14 Nov 2024
Building Plan Approval (IOD)File: 6.pdf14 Nov 2024
Building Plan Approval (IOD)File: 5.pdf14 Nov 2024
Building Plan Approval (IOD)File: 4.pdf14 Nov 2024
Building Plan Approval (IOD)File: 3.pdf14 Nov 2024
Building Plan Approval (IOD)File: 1.pdf14 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Shahid Nagar as on Sep 2024.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form_5_-_Shahid_Nagar_for_FY_2018-19_11zon.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form_5_-_Shahid_Nagar_for_FY_2019-20_11zon.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form_5_-_Shahid_Nagar_for_FY_2020-21_11zon.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct 24.pdf23 Oct 2024
Certificates of CA (Form 3)File: Form 3 Jun 24 (2)_11zon.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun 24 (2).pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22_11zon.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23_11zon.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Shahid Nagar as on June 2024.pdf15 Oct 2024
Building plan approvalFile: pl.pdf14 Oct 2024
Building plan approvalFile: plm.pdf14 Oct 2024
Certificates of CA (Form 3)File: Form 3 of Shahid Nagar as on 30-06-2024.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Binder1_11zon.pdf14 Oct 2024
Building Plan Approval (IOD)File: plm.pdf14 Oct 2024
Building Plan Approval (IOD)File: pl.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A-2019-20.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A-2021-22.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-2023-24.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-2022-23.pdf12 Aug 2024
Certificates of CA (Form 5)File: Form 5 17-18.pdf12 Aug 2024
Declaration in FORM BFile: AFFIDAVIT_CUM_DECLARATION_-_SANGAM_JV.pdf9 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: _Form_2__Mar_24.pdf9 Aug 2024
Certificates of CA (Form 3)File: _Form_3__Mar_24.pdf9 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE_A_FORMAT_N.pdf9 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: _Form_5___FY_2021-22_.pdf9 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: _Form_5___FY_2022-23_.pdf9 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT_A.pdf9 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jul 2024
Certificates of CA (Form 3)File: 12 Certificates of CA (Form 3).pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Shahid Nagar as on March 2024.pdf10 Jun 2024

How this compares with Mumbai City

46%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 42 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAHID NAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARIMAN POINT780+ in Mumbai City

2 kmSHAHID NAGARCompleted 3Lapsed / revoked 4Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: NEUMEC AND SANGAM JV

NEUMEC AND SANGAM JV has 2 registrations on MahaRERA, including SHAHID NAGAR and COMPOSITE BUILDING NO2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if SHAHID NAGAR is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAHID NAGAR?

The registered promoter entity is NEUMEC AND SANGAM JV, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAHID NAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAHID NAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAHID NAGAR?

The professionals named in the filing: Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAHID NAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAHID NAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAHID NAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.