ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / SHAGUN TRADE CENTRE

Registration approved Commercial project

SHAGUN TRADE CENTRE

By N S NITHIN

RG-KA-62828 · RERA PRM/KA/RERA/1257/334/PR/191116/003026

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

SHAGUN TRADE CENTRE is a Commercial project by N S NITHIN in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/191116/003026 on 16 Nov 2019. Possession is promised by 30 Dec 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameSHAGUN TRADE CENTRE
  • TypeCommercial
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/191116/003026
  • ReraGenie IDRG-KA-62828

Builder

  • NameN S NITHIN
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2019First promiseMar 2022Revised toDec 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Nov 2019
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAGUN---01919

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area728 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.70 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHARUN ANCHAN
EngineerK. ANIL HEGDE

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2022 → Dec 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/191116/003026 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
licence-
drwn-
plan-
NOT APP (1)-
AGRT TO SALE_compressed-
Land Document-
drwn-
drwn-
NOT APP (1)-
NOT APP (1)-
WATER POWER NOC NA-
specificationshagun-
EC-
notary affidavit new_compressed-
NITHIN-FORM B_compressed-
Katha-
JDA-
deed1-
CONVERSION-NEW_compressed (2)-
WATER POWER NOC NA-
fire noc-
WATER POWER NOC NA-
NOT APP POLLUT-
plan-
drwn-
Conversion-
Balance Sheet 2017 - 2018File: BS19_compressed.pdf-
Balance Sheet 2016 - 2017File: BS18_compressed.pdf-
Balance Sheet 2015 - 2016File: B S 17 (2).pdf-
Audited Profit and Loss Statement 2017 - 2018File: PL19.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PL18.pdf-
Audited Profit and Loss Statement 2015 - 2016File: p &l 17 (1).pdf-
Director's Report 2017 - 2018File: NOT APP (1).pdf-
Director's Report 2016 - 2017File: NOT APP (1).pdf-
Director's Report 2015 - 2016File: NOT APP (1).pdf-
Cash Flow Statement 2017 - 2018File: NOT APP (1).pdf-
Cash Flow Statement 2016 - 2017File: NOT APP (1).pdf-
Auditor's Report 2017 - 2018File: NOT APP (1).pdf-
Auditor's Report 2016 - 2017File: NOT APP (1).pdf-
Auditor's Report 2015 - 2016File: NOT APP (1).pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 18-19 new.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: I T 17-18.pdf-
NITHIN-FORM B_compressed-
Prospectus/BrochureFile: New Microsoft Word Document.pdf-
Advertisement Copy 1File: New Microsoft Word Document.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1257_334_PR_191116_003026shagun.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
SOLIS-OngoingMar 2020Not delivered

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 9 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep SHAGUN TRADE CENTRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: N S NITHIN

N S NITHIN has 1 registration on RERA Karnataka, including SHAGUN TRADE CENTRE. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if SHAGUN TRADE CENTRE is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHAGUN TRADE CENTRE?

The registered promoter entity is N S NITHIN. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHAGUN TRADE CENTRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHAGUN TRADE CENTRE?

The professionals named in the filing: Architect: SHARUN ANCHAN; Engineer: K. ANIL HEGDE. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAGUN TRADE CENTRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAGUN TRADE CENTRE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAGUN TRADE CENTRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.