Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 15 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
27 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

SHAGUN RESIDENCY is a Residential / Group Housing project by SHAGUN CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052339 on 14 Aug 2023. Possession is promised by 30 Sep 2027. The completion date has moved by 15 months from the original filing. 5 of the 32 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHAGUN RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • DADABHAI ROAD EXT
    • VILE PARLE WEST
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052339
  • ReraGenie IDRG-MH-06288

Builder

  • NameSHAGUN CONSTRUCTION
  • Entity typePartnership
  • PartnersSANJAY CHHABILDAS PAREKH, KASHMIRA ASHISH SOLANKI, DHAVAL VIJAY KARIA, AMI DHAVAL KARIA

Key dates

this monthRegisteredAug 2023First promiseJun 2026Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2023
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 27 Jun 2026)
  • Buildings1 building record
  • Documents filed78 files

Current status

16%5 of 32 units booked
75.1%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAGUN RESIDENCYNA131232032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

SHAGUN RESIDENCY: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area730 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025
LandownerVillageDistrict
KALANDHAR COTTAGE CO-OPERATIVE HOUSING SOCIETY LTDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI2430.95
Proposed, not sanctioned1,407 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVILE PARLE EAST
Estimated costRs 16.65 cr
Cost incurredRs 12.50 cr
Work done75.08%
BuildingWingEstimatedIncurred
SHAGUN RESIDENCYNARs 16.65 crRs 12.50 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHISH R SOLANKI
EngineerBHAVIN M SHAH
EngineerHITESH R SOLANKI
Chartered AccountantPUNIT GUPTA
Chartered AccountantYOJANA B GUPTA
PartnerRole in project
SHAGUN CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15062621377Jun 2026 → Sep 2027

Reason as filed by the promoterDue to delay in completing the project as per the promised timeline We require a further 15 months of extension. We will complete the entire project on or before 30/09/2027 date

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf18 Jul 2026
Withdrawal Update Form 2File: form 2.pdf18 Jul 2026
Withdrawal Update Form 3File: form 3.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf19 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf10 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf10 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 1File: form 1.pdf18 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf18 Mar 2026
Withdrawal Update Form 3File: form 3 - SHAGUN.pdf18 Mar 2026
Form 2A (FY 2023-2024)File: form 2A 23-24.pdf22 Dec 2025
Form 5 (FY 2023-2024)File: form 5 23-24.pdf20 Dec 2025
Form 5 (FY 2024-2025)File: form 5 24-25.pdf20 Dec 2025
Withdrawal Update Form 1File: form 1.pdf12 Nov 2025
Withdrawal Update Form 2File: form 2.pdf12 Nov 2025
Withdrawal Update Form 3File: form 3.pdf12 Nov 2025
Building plan approvalFile: Building Plan Approval.pdf10 Oct 2025
Form 1File: form 1.pdf1 Aug 2025
Form 2File: form 2.pdf1 Aug 2025
Form 3File: form 3.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf1 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate1.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form2a.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGI_CERTI_SHAGUN.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: sold and unsold.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Apr 2024
Details of encumbrances concerned to FinanceFile: 21_merged.pdf25 Jul 2023
Details of encumbrances concerned to LegalFile: 21_merged.pdf25 Jul 2023
Layout approvalFile: APPROVED PLAN (3) (1) (1).pdf20 Jul 2023
Copy of Layout Approval (in case of layout)File: APPROVED PLAN (3) (1) (1).pdf20 Jul 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC (5).pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: output (1).pdf19 Jul 2023
Copy of the legal title reportFile: TITLE REPORT.pdf14 Jul 2023
Proforma of Agreement for saleFile: RERA FLAT SALE AGR KALANDHAR 1.pdf14 Jul 2023
Deviation Report with respect to model copy of AgreementFile: 19 (2).pdf14 Jul 2023
Proforma of Allotment letterFile: 17 (1).pdf13 Jul 2023
Deviation Report with respect to Allotment letterFile: 16 (1).pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf10 Jul 2023
Building plan approvalFile: APPROVED PLAN (2)_2-2.pdf7 Jul 2023
Building plan approvalFile: APPROVED PLAN (2)_3-3.pdf7 Jul 2023
Building plan approvalFile: APPROVED PLAN (2)_4-4.pdf7 Jul 2023
Building plan approvalFile: APPROVED PLAN (2)_5-end.pdf7 Jul 2023
Building plan approvalFile: IOA (1).pdf7 Jul 2023
PAN CardFile: PAN SHAGUN.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN (2)_2-2.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN (2)_3-3.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN (2)_4-4.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN (2)_5-end.pdf7 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: IOA (1).pdf7 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC_Shagun.pdf7 Jul 2023
Declaration in FORM BFile: 7 (1).pdf7 Jul 2023
CERSAI detailsFile: CERSAI LETTER.pdf7 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (53).pdf7 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf7 Jul 2023

How this compares with Mumbai Suburban

16%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAGUN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE WEST6,700+ in Mumbai Suburban

2 kmSHAGUN RESIDENCYCompleted 141Lapsed / revoked 60Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 333 registered projects within 2 km.

Builder: SHAGUN CONSTRUCTION

SHAGUN CONSTRUCTION has 1 registration on MahaRERA, including SHAGUN RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHAGUN RESIDENCY is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAGUN RESIDENCY?

The registered promoter entity is SHAGUN CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAGUN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAGUN RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAGUN RESIDENCY?

The professionals named in the filing: Architect: ASHISH R SOLANKI; Engineer: BHAVIN M SHAH; Engineer: HITESH R SOLANKI; Chartered Accountant: PUNIT GUPTA; Chartered Accountant: YOJANA B GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAGUN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAGUN RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAGUN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.