Home / Browse projects / Nagpur, Maharashtra / SG ESTATE - 2
SG ESTATE - 2
By Aska Real Estate Private Limited
RG-MH-90312 · RERA P50500053153 · Last updated on MahaRERA portal: 23 Sep 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SG ESTATE - 2 is a Plotted project by Aska Real Estate Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500053153 on 17 Oct 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 62 of the 64 units on this registration are recorded sold or booked.
At a glance
Project
- NameSG ESTATE - 2
- TypePlotted
- Location
- NA
- Jamtha
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500053153
- ReraGenie IDRG-MH-90312
Builder
- NameAska Real Estate Private Limited
- Entity typeCompany
- DirectorsHarsh Ashok Garg, Navdeep Ashok Garg
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Oct 2023
- Promised completion31 Mar 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed88 files
Current status
Figures as on 23 Sep 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 23 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 55% |
| Street Lighting | Yes | 55% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 25% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 15% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | C D Giripunje |
| Engineer | Moreshwar Choudhari |
| Engineer | BMS CONSTRUTION |
| Chartered Accountant | CA Abhinav Welekar |
| Chartered Accountant | Pravin Dhiran & Co. |
| Partner | Role in project |
|---|---|
| Aska Real Estate Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Sep 2025
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2023-2024)File: From 5 F.pdf | 23 Sep 2025 |
| Withdrawal Update Form 1File: fORM 1.pdf | 20 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 30-06-24.pdf | 20 Sep 2025 |
| Withdrawal Update Form 3File: Form 3.PDF | 20 Sep 2025 |
| Completion CertificateFile: completion certificate jamtha sg2.pdf | 20 Sep 2025 |
| Completion CertificateFile: grampanchayat jamtha .pdf | 20 Sep 2025 |
| Completion CertificateFile: OC Mail Screenshot.pdf | 20 Sep 2025 |
| Form 1File: Arch Certificate SG - 2.PDF | 4 Jul 2025 |
| Form 2File: Form 2.pdf | 4 Jul 2025 |
| Form 3File: Form 3 Signed.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S G 2 Booked Inventory.pdf | 4 Jul 2025 |
| Form 1File: Form 1.pdf | 4 Jul 2025 |
| Form 2File: Form 2.pdf | 4 Jul 2025 |
| Form 3File: form 3 aska.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S G 2 Booked Inventory.pdf | 4 Jul 2025 |
| Form 1File: Form 1.pdf | 4 Jul 2025 |
| Form 2File: Form 2 30-06-24.pdf | 4 Jul 2025 |
| Form 3File: Form 3.PDF | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: S G 2 Disclosure of Sold.pdf | 4 Jul 2025 |
| Form 1File: Form-1 30-9-2024.pdf | 4 Jul 2025 |
| Form 2File: Form-2 30-9-2024.pdf | 4 Jul 2025 |
| Form 3File: Form-3 30-09-2024 Sign.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure-29 30-09-2024.pdf | 4 Jul 2025 |
| Form 1File: Form-1 31-12-2024.pdf | 4 Jul 2025 |
| Form 2File: Form-2 31-12-2024.pdf | 4 Jul 2025 |
| Form 3File: Form-3 31-12-2024 Sign.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annnexure-29 31-12-2024.pdf | 4 Jul 2025 |
| Form 1File: Form-1 31-03-2025.pdf | 4 Jul 2025 |
| Form 2File: Form-2 31-03-2025.pdf | 4 Jul 2025 |
| Form 3File: Form-3 31-03-2025 Sign.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure-29 31-03-2025.pdf | 4 Jul 2025 |
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 4 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-9-2024.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2024.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-03-2025.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-9-2024.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-03-2025.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-03-2025 Sign.pdf | 1 May 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure-29 30-09-2024.pdf | 1 May 2025 |
| Disclosure of sold/ booked inventoryFile: Annnexure-29 31-12-2024.pdf | 1 May 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure-29 31-03-2025.pdf | 1 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2024 Sign.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-24.pdf | 25 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 25 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: S G 2 Booked Inventory.pdf | 25 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: S G 2 Disclosure of Sold.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.PDF | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 aska.pdf | 13 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate SG - 2.PDF | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: S G 2 Booked Inventory.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf | 20 Jan 2024 |
| Proforma of Agreement for saleFile: 9_ATS as per format.pdf | 11 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: 13_deviation for ATS.pdf | 11 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Part 1.pdf | 6 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Part 2 final.pdf | 6 Oct 2023 |
| Other - TechnicalFile: SG Estate 2 mail verification.pdf | 6 Oct 2023 |
| Building plan approval or NA orderFile: 7_Tentative Sanction.PDF | 8 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7_Tentative Sanction.PDF | 8 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 7_Tentative Sanction.PDF | 8 Aug 2023 |
| Declaration about Commencement CertificateFile: 12_Circular 32.PDF | 8 Aug 2023 |
| Other - LegalFile: 20Clarification for Plots.pdf | 5 Aug 2023 |
| Other - LegalFile: 21_Resolution.pdf | 5 Aug 2023 |
| Copy of the legal title reportFile: 4_Search Modified.pdf | 4 Aug 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200276520658_For_Asset_Based_Search_04_08_2023_16_48_08_600.pdf | 4 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 5_A_Financial Encumbrance.PDF | 3 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 5B_Legal Encumbrance.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 5_A_Financial Encumbrance.PDF | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 5B_Legal Encumbrance.pdf | 3 Aug 2023 |
| Declaration in FORM BFile: 6_form B.PDF | 3 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: 11_Annexure 29.PDF | 3 Aug 2023 |
| CERSAI detailsFile: 19_cersai declaration.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3.pdf | 3 Aug 2023 |
| Proforma of Allotment letterFile: 8_allotment letter.PDF | 3 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2.pdf | 2 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
Keep SG ESTATE - 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NA2,800+ in Nagpur
Filed coordinates, straight-line distance. 41 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: Aska Real Estate Private Limited
Aska Real Estate Private Limited has 1 registration on MahaRERA, including SG ESTATE - 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SG ESTATE - 2 is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SG ESTATE - 2?
The registered promoter entity is Aska Real Estate Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SG ESTATE - 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SG ESTATE - 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SG ESTATE - 2?
The professionals named in the filing: Architect: C D Giripunje; Engineer: Moreshwar Choudhari; Engineer: BMS CONSTRUTION; Chartered Accountant: CA Abhinav Welekar; Chartered Accountant: Pravin Dhiran & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SG ESTATE - 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback