ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Serenity Heights

Registered Litigation declared Residential / Group Housing project

Serenity Heights

By S AND T DEVELOPERS

RG-MH-18536 · RERA P51800077396 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 1 complaint at MahaRERA
  • Rs 25.00 crore secured on the land, in favour of AU Small Finance Bank

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
38 of 46Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Serenity Heights is a Residential / Group Housing project by S AND T DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077396 on 13 Aug 2024. Possession is promised by 31 Dec 2027. 8 of the 46 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSerenity Heights
  • TypeResidential / Group Housing
  • Location
    • CG Road
    • Near Cubic Mall
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400074
  • Pincode400074
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077396
  • ReraGenie IDRG-MH-18536

Builder

  • NameS AND T DEVELOPERS
  • Entity typePartnership
  • PartnerTrilochan Kumar
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

17%8 of 46 units booked
39.9%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Serenity HeightsNA7046046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

Serenity Heights: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,295 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on23 Apr 2026
LandownerVillageDistrict
Arun Popatlal ChavdaChemburMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3919.65
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPB No 3, JK Chambers, Sector 17, Vashi, Navi Mumbai - 400703
Estimated costRs 22.50 cr
Cost incurredRs 8.99 cr
Work done39.94%
BuildingWingEstimatedIncurred
Serenity HeightsNARs 22.05 crRs 8.96 cr
-NARs 45.00 lakhRs 2.25 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARK Reza Kabul Architects
ArchitectThree Dimensional Consultants LLP
EngineerAnkit Satish Shah
EngineerSK Consultants & Engineers
Chartered AccountantPBG and Associates
Chartered AccountantDilip Kumar B Agrawal
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
S AND T DEVELOPERS-

Litigation declared5

CaseCourtStatus
COMS/266/2020/2020Bombay High CourtClosed
COMS/267/2020/2020Bombay High CourtClosed
S/427/2015/2015Bombay High CourtClosed
3038/2024Bombay City Civil CourtOngoing
786/2015Bombay High CourtClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12504225Rajeev BhardwajS AND T DEVELOPERS29/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf11 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 Marc 2026.Pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 dec 2025.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 dec 2025.pdf24 Apr 2026
Form 5 (FY 2024-2025)File: Serenity Heights - Form 5 FY24-25 (signed).pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1 - Serenity Heights as on Sep 2025.pdf29 Nov 2025
Withdrawal Update Form 2File: Form 2 - Serenity Heights as on Sept 2025.pdf29 Nov 2025
Withdrawal Update Form 3File: Form 3 - Serenity Heights as on 30-09-2025.pdf29 Nov 2025
Building plan approvalFile: Plan 1.pdf25 Sep 2025
Building plan approvalFile: Plan 2.pdf25 Sep 2025
Building plan approvalFile: Plan 3.pdf25 Sep 2025
Building plan approvalFile: Plan 4.pdf25 Sep 2025
Building plan approvalFile: Plan 5.pdf25 Sep 2025
Withdrawal Update Form 1File: Form 1 - Serenity Heights as on June 2025 (SIGNED).pdf25 Sep 2025
Withdrawal Update Form 2File: Form 2 - Serenity Heights as on June 2025 (SIGNED).pdf25 Sep 2025
Withdrawal Update Form 3File: Form 3 - Serenity Heights as on June 2025 (SIGNED).pdf25 Sep 2025
Layout approvalFile: Plan 1.pdf10 Sep 2025
Building plan approvalFile: Plan 2.pdf10 Sep 2025
Layout approvalFile: Plan 3.pdf10 Sep 2025
Building plan approvalFile: Plan 4.pdf10 Sep 2025
Building plan approvalFile: Plan 5.pdf10 Sep 2025
Details of encumbrances concerned to FinanceFile: S and T RERA Encumbrance.pdf12 May 2025
CERSAI detailsFile: CERSAI Search.pdf12 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_On the letterhead of the Promoter.pdf12 May 2025
Details of encumbrances concerned to LegalFile: S and T RERA Encumbrance.pdf12 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - On the banks letterhead.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf13 Jan 2025
Building plan approvalFile: Sanctioned Plan (Till 8th Floor)_compressed.pdf7 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC (Till 8th Floor).pdf7 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan (Till 8th Floor)_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect certificate.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA Certificate.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate.PDF2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration Shabbir.pdf7 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_of_Interest_in_Other_Real_Estate_Organization_-_Trilochan[1].pdf7 Aug 2024
Proforma of Agreement for saleFile: Draft Agreement New.pdf7 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Agreement for Sale - 06-08-24.pdf7 Aug 2024
Other - LegalFile: AFS - Clarification Letter.pdf7 Aug 2024
Other - LegalFile: Search Report .pdf7 Aug 2024
CERSAI detailsFile: Cersai Declaration.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 new.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect certificate.pdf15 Jul 2024
Details of encumbrances concerned to FinanceFile: Finance - Non encumbrance.pdf11 Jul 2024
Details of encumbrances concerned to FinanceFile: Legal - Non encumbrance.pdf11 Jul 2024
Details of encumbrances concerned to LegalFile: Finance - Non encumbrance.pdf11 Jul 2024
Details of encumbrances concerned to LegalFile: Legal - Non encumbrance.pdf11 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of Separate Bank Account.pdf11 Jul 2024
Copy of the legal title reportFile: Legal Opinion - S T Developers .pdf19 Jun 2024
Layout approvalFile: Layout Approval Plinth.pdf18 Jun 2024
Building plan approvalFile: Zero FSI IOD.pdf18 Jun 2024
PAN CardFile: S AND T PAN Card.pdf18 Jun 2024
Copy of Layout Approval (in case of layout)File: Layout Approval Plinth.pdf18 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Zero FSI IOD.pdf18 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Zero FSI CC.pdf18 Jun 2024
Declaration about Commencement CertificateFile: Declaration Commencement.pdf18 Jun 2024
Declaration in FORM BFile: Developer FORM B.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf18 Jun 2024
Proforma of Allotment letterFile: Proforma of Allotment Letter - Final.pdf18 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter.pdf18 Jun 2024
Other - TechnicalFile: Annexure-A - Serenity Heights.pdf18 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Rosalia ApartmentsAndheri West29CompletedJul 2020Late, Jun 2023

How this compares with Mumbai Suburban

17%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Serenity Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Cubic Mall6,700+ in Mumbai Suburban

2 kmSerenity HeightsCompleted 102Lapsed / revoked 59Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: S AND T DEVELOPERS

S AND T DEVELOPERS has 1 registration on MahaRERA, including Serenity Heights. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Serenity Heights is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Serenity Heights?

The registered promoter entity is S AND T DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Serenity Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Serenity Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Serenity Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Serenity Heights?

The professionals named in the filing: Architect: ARK Reza Kabul Architects; Architect: Three Dimensional Consultants LLP; Engineer: Ankit Satish Shah; Engineer: SK Consultants & Engineers; Chartered Accountant: PBG and Associates; Chartered Accountant: Dilip Kumar B Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Serenity Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Serenity Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Serenity Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.