Registered No litigation declared Residential / Group Housing project

SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD

By CHARKOP SHALIMAR CHS LTD

RG-MH-72058 · RERA P51800047429 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 95%
24 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD is a Residential / Group Housing project by CHARKOP SHALIMAR CHS LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047429 on 31 Oct 2022. Possession is promised by 31 Dec 2026. 37 of the 61 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD
  • TypeResidential / Group Housing
  • Location
    • PLOT 166 RDP 7
    • SEC 3 CHARKOP KANDIVLI WEST
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047429
  • ReraGenie IDRG-MH-72058

Builder

  • NameCHARKOP SHALIMAR CHS LTD
  • Entity typeSociety
  • ChairpersonPRASHANT Balkrishna KADVEKAR

Key dates

this monthRegisteredOct 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

61%37 of 61 units booked
70.3%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHARKOP SHALIMARNA232056561

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

CHARKOP SHALIMAR: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area774 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025

Approvals and building plan

Sanctioning authorityMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY
Permissible FSI3716.74
Proposed, not sanctioned920 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAMANGAL BLDG SEC 1 PLOT NO 274 DR AMBEDKAR ROAD CHARKOP KANDIVALI WEST MUMBAI 400067
Estimated costRs 22.88 cr
Cost incurredRs 16.08 cr
Work done70.3%
BuildingWingEstimatedIncurred
CHARKOP SHALIMARNARs 21.39 crRs 15.69 cr
-NARs 1.49 crRs 39.03 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHARSHAD MAANOHAAR MORE
EngineerHARSHAD MAANOHAAR MORE
EngineerABHIJIT PHATARPEKAR
Chartered AccountantMAULIK SHAH
Chartered AccountantA K O R D & CO Partner Dattatray Bhanage
Chartered AccountantR V B & Associates Proprietor CA RAHUL VISHNU BOMBALE
PartnerRole in project
CHARKOP SHALIMAR CHS LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Charkop Shalimar_Form 2A RERA 2025-26 Sign.pdf23 Jun 2026
Withdrawal Update Form 1File: RERA FORM 1.pdf6 Jun 2026
Withdrawal Update Form 2File: RERA FORM 2.pdf6 Jun 2026
Withdrawal Update Form 3File: RERA FORM 3 - CHARKOP SHALIMAR CHSL.pdf6 Jun 2026
Withdrawal Update Form 1File: RERA FORM 1 - SIGNED - Q3.pdf17 Feb 2026
Withdrawal Update Form 2File: RERA FORM 2 - SIGNED.pdf17 Feb 2026
Withdrawal Update Form 3File: RERA FORM_3_SIGNED_Q3-compressed 1.pdf17 Feb 2026
Withdrawal Update Form 1File: FORM 1 Architechts certificate_Charkop Shalimar Q-2 2025 F1.pdf27 Oct 2025
Withdrawal Update Form 2File: 2025-03-31_Q2_Form 2 Engineers certificate F2.pdf27 Oct 2025
Withdrawal Update Form 3File: 01 Charkop Shalimar FORM - 3 -F.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: CA CERTIFICATE RERA FORM 5 - SIGNED_F.pdf30 Sep 2025
Withdrawal Update Form 1File: FORM 1 Architechts certificate_Charkop Shalimar Q-2 2025.pdf24 Sep 2025
Withdrawal Update Form 2File: 2025-03-31_Q2_Form 2 Engineers certificate.pdf24 Sep 2025
Withdrawal Update Form 3File: Charkop Shalimar From 3 Q1.pdf24 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Charkop Shalimar Form 3(10-04-2025)_compressed.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate_Charkop Shalimar Q-4 2024 SIGNED.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024-12-31_Form 2 Engineers certificate SIGNED.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Charkop Shalimar Form 3 (10-01-2025).pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SIGNED.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARKOP SHALIMAR CHSL FORM 3 SIGNED.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Booked Inventory.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate_Charkop Shalimar Q-2 2024.pdf1 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024-06-30_Form 2 Engineers certificate.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 30TH JUNE 2024_11zon.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Charkop Shalimar_FORM 2A 2023-24.pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM - 5 SIGNED.pdf1 Jun 2024
Other - FinanceFile: DISCOLSURE OF SOLD BOOKED INVENTORY - SIGNED.pdf1 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate_Charkop Shalimar Q-1 2024.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024-03-31_Form 2 Engineers certificate.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 31ST MARCH 2024_11zon.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts Certificate.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts Certificate.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 30TH DECEMBER 2023_11zon.pdf24 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Charkop Shalimar_FORM 2A Q-3.pdf22 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Charkop Shalimar_FORM 2A Q-4.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate_Charkop Shalimar Q-2 2023.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2023-09-30_Form 2 Engineers certificate.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 30TH SEPTEMBER 2023_compressed.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM - 5 SIGNED.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts Certificate.pdf26 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf26 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 30TH JUNE 2023 Zipped.pdf26 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-DSC.pdf10 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-DSC.pdf10 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UPDATED RERA FORM 3 - SIGNED UPTO 31st MAR 23 Compressed.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 31st MAR 23_11zon.pdf15 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-STAMPED AND SIGNED.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-STAMPED AND SIGNED.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-STAMPED AND SIGNED.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 - SIGNED UPTO 31 DEC 22 _compressed.pdf17 Feb 2023
Copy of the legal title reportFile: Charkop Shalimar Legal Title Report.pdf1 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200248708.pdf1 Oct 2022
Proforma of Allotment letterFile: Agreement for sale _ RERA.pdf1 Oct 2022
Proforma of Agreement for saleFile: Agreement for sale _ RERA.pdf1 Oct 2022
Layout approvalFile: 6 Charkop Shalimar IOA Plans.pdf30 Sep 2022
Building plan approvalFile: 7 Charkop Shalimar IOA Copy.pdf30 Sep 2022
Details of encumbrances concerned to FinanceFile: 3 Declaration of Encumbrance.pdf30 Sep 2022
Details of encumbrances concerned to LegalFile: 4 Declaration of Encumbrance.pdf30 Sep 2022
Copy of Layout Approval (in case of layout)File: 6 Charkop Shalimar IOA Plans.pdf30 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 7 Charkop Shalimar IOA Copy.pdf30 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Charkop Shalimar_First CC_Signed.pdf30 Sep 2022
Declaration about Commencement CertificateFile: RERA Declaration of CC format D.pdf30 Sep 2022
Declaration in FORM BFile: Shalimar CHSL FORM B.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architechts certificate.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate.pdf30 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form-3.pdf30 Sep 2022
Proforma of Agreement for saleFile: ALLOTMENT LETTER_RERA.pdf30 Sep 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER_RERA.pdf30 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration_Format - A.pdf30 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment.pdf30 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report_AFS.pdf30 Sep 2022
PAN CardFile: CHARKOP SHALIMAR_PAN CARD.pdf29 Sep 2022

How this compares with Mumbai Suburban

61%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS L on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SEC 3 CHARKOP KANDIVLI WEST6,700+ in Mumbai Suburban

2 kmSELF REDEVELOPMENT OF CHCompleted 119Lapsed / revoked 70Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 337 registered projects within 2 km.

Builder: CHARKOP SHALIMAR CHS LTD

CHARKOP SHALIMAR CHS LTD has 1 registration on MahaRERA, including SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD?

The registered promoter entity is CHARKOP SHALIMAR CHS LTD, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD?

The professionals named in the filing: Architect: HARSHAD MAANOHAAR MORE; Engineer: HARSHAD MAANOHAAR MORE; Engineer: ABHIJIT PHATARPEKAR; Chartered Accountant: MAULIK SHAH; Chartered Accountant: A K O R D & CO Partner Dattatray Bhanage; Chartered Accountant: R V B & Associates Proprietor CA RAHUL VISHNU BOMBALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS L to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.