SECTOR 15 ROADPALI KALAMBOLI
By City and Industrial Development Corporation Of Mahrastra Ltd
RG-MH-45782 · RERA P52000017437 · Last updated on MahaRERA portal: 7 Apr 2022
Source: official MahaRERA filing
Red flags
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SECTOR 15 ROADPALI KALAMBOLI is a Others project by City and Industrial Development Corporation Of Mahrastra Ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000017437 on 13 Aug 2018. The registration is recorded completed; possession was promised by 30 Sep 2022. The completion date has moved by 18 months from the original filing.
At a glance
Project
- NameSECTOR 15 ROADPALI KALAMBOLI
- TypeOthers
- Location
- Plot no 1 to 9 Sector 15 Kalamboli
- Roadpali
- Rodpali
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000017437
- ReraGenie IDRG-MH-45782
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Aug 2018
- Promised completion30 Sep 2022
- Revised completionRevised to 30 Sep 2022 (originally 31 Mar 2021)
- Buildings17 building records
- Documents filed37 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LIG 3 PHASE 1 GROUND TO 13 TH FLOOR | NA | 14 | 0 | 0 | 0 | 0 |
| LIG 4 PHASE 1 | NA | 15 | 0 | 0 | 0 | 0 |
| LIG 7 PHASE 1 UPTO 14 TH FLOOR | NA | 15 | 0 | 0 | 0 | 0 |
| LIG 1 PHASE 2 GROUND TO 13TH FLOOR | NA | 14 | 0 | 0 | 0 | 0 |
| LIG 2 PHASE 2 GROUND TO 13 TH FLOOR | NA | 14 | 0 | 0 | 0 | 0 |
| LIG 5 PHASE 2 | NA | 15 | 0 | 0 | 0 | 0 |
| LIG 6 PHASE 2 | NA | 15 | 0 | 0 | 0 | 0 |
| EWS 1 PHASE 2 GROUND TO 7 TH FLOOR | NA | 8 | 0 | 0 | 0 | 0 |
| EWS 2 PHASE 2 GROUND TO 7 TH FLOOR | NA | 8 | 0 | 0 | 0 | 0 |
| EWS 3 PHASE 2 GROUND TO 7 TH FLOOR | NA | 8 | 0 | 0 | 0 | 0 |
| EWS 4 PHASE 2 GROUND TO 14TH FLOOR | NA | 15 | 0 | 0 | 0 | 0 |
| LIG 1 PHASE 3- 14 TH FLOOR | NA | 1 | 0 | 0 | 0 | 0 |
| LIG 2 PHASE 3- 14 TH FLOOR | NA | 1 | 0 | 0 | 0 | 0 |
| LIG 3 PHASE 3- 14 TH FLOOR | NA | 1 | 0 | 0 | 0 | 0 |
| EWS 1 PHASE 3 - 8TH TO 14TH FLOOR | NA | 7 | 0 | 0 | 0 | 0 |
| EWS 2 PHASE 3- 8TH TO 14TH FLOOR | NA | 7 | 0 | 0 | 0 | 0 |
| EWS 3 PHASE 3- 8TH TO 14TH FLOOR | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building17
As on 7 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
153 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Podiums (if any), at 0%.
LIG 3 PHASE 1 GROUND TO 13 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 4 PHASE 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 7 PHASE 1 UPTO 14 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 1 PHASE 2 GROUND TO 13TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 2 PHASE 2 GROUND TO 13 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 5 PHASE 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 6 PHASE 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 1 PHASE 2 GROUND TO 7 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 2 PHASE 2 GROUND TO 7 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 3 PHASE 2 GROUND TO 7 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 4 PHASE 2 GROUND TO 14TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 1 PHASE 3- 14 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 2 PHASE 3- 14 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LIG 3 PHASE 3- 14 TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 1 PHASE 3 - 8TH TO 14TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 2 PHASE 3- 8TH TO 14TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
EWS 3 PHASE 3- 8TH TO 14TH FLOOR82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed245
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| LIG 3 PHASE 1 GROUND TO 13 TH FLOOR | 22 | 22 |
| LIG 4 PHASE 1 | 22 | 22 |
| LIG 7 PHASE 1 UPTO 14 TH FLOOR | 22 | 22 |
| LIG 1 PHASE 2 GROUND TO 13TH FLOOR | 22 | 22 |
| LIG 2 PHASE 2 GROUND TO 13 TH FLOOR | 22 | 22 |
| LIG 5 PHASE 2 | 22 | 22 |
| LIG 6 PHASE 2 | 22 | 22 |
| EWS 1 PHASE 2 GROUND TO 7 TH FLOOR | 12 | 12 |
| EWS 2 PHASE 2 GROUND TO 7 TH FLOOR | 12 | 12 |
| EWS 3 PHASE 2 GROUND TO 7 TH FLOOR | 12 | 12 |
| EWS 4 PHASE 2 GROUND TO 14TH FLOOR | 22 | 22 |
| LIG 1 PHASE 3- 14 TH FLOOR | 1 | 1 |
| LIG 2 PHASE 3- 14 TH FLOOR | 1 | 1 |
| LIG 3 PHASE 3- 14 TH FLOOR | 1 | 1 |
| EWS 1 PHASE 3 - 8TH TO 14TH FLOOR | 10 | 10 |
| EWS 2 PHASE 3- 8TH TO 14TH FLOOR | 10 | 10 |
| EWS 3 PHASE 3- 8TH TO 14TH FLOOR | 10 | 10 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shri Shrikant Dinakar Khadilkar Chief Architect BGSCTPL |
| Partner | Role in project |
|---|---|
| City and Industrial Development Corporation Of Mahrastra Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe progress of the project is severely affected even after parital lifting of lockdown due to shortage of labour and supply chain disruption as well as prolonged mansoon.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Aug 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Mar 2022
Documents filed37
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form_4_Architect_Certificate-KALAMBOLI-E-01_1_11zon.pdf | 7 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Plot No_1 to 9 Sector 15 Kalamboli 2017-18.pdf | 24 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Plot No 1 to 9 Sector 15 Kalamboli 2018-19.pdf | 24 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Plot No 1 to 9 Sector 15 Kalamboli 2019-20.pdf | 24 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Plot No 1 to 9 Sector 15 Kalamboli 2020-21.pdf | 24 Mar 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_Sector15__Kalamboli.pdf | 24 Mar 2022 |
| CERSAI detailsFile: Kalamboli.pdf | 6 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Sector 15 Kalamboli new.pdf | 11 Nov 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE1.pdf | 12 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A 2019-20 Kalamboli.pdf | 8 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A 2020-21 Kalamboli.pdf | 8 Oct 2021 |
| Certificates of CA (Form 3)File: Form_4_Architect_Certificate-KALAMBOLI-E-04.pdf | 8 Oct 2021 |
| Certificates of CA (Form 3)File: Form_4_Architect_Certificate-KALAMBOLI-L-01.pdf | 8 Oct 2021 |
| Layout approvalFile: 1) KALAMBOLI LAYOUT PLAN_compressed.pdf | 21 May 2019 |
| Copy of Layout Approval (in case of layout)File: 1) KALAMBOLI LAYOUT PLAN_compressed.pdf | 21 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate Kalamboli.pdf | 21 May 2019 |
| Layout approvalFile: Kalamboli 906 uploaded.pdf | 22 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: Kalamboli 906 uploaded.pdf | 22 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended CC (Kalamboli) compress.pdf | 21 Feb 2019 |
| Building plan approvalFile: EWE Kalamboli.pdf | 1 Aug 2018 |
| Building plan approvalFile: LIG C plus R floor plan Kalamboli.pdf | 1 Aug 2018 |
| Building plan approvalFile: LIG R floor plan Kalamboli.pdf | 1 Aug 2018 |
| Layout approvalFile: Layout Kalamboli.pdf | 1 Aug 2018 |
| PAN CardFile: Pan card CIDCO.pdf | 1 Aug 2018 |
| Copy of the legal title reportFile: Legal title report.pdf | 1 Aug 2018 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 1 Aug 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Kalamboli.pdf | 1 Aug 2018 |
| Building Plan Approval (IOD)File: LIG C plus R floor plan Kalamboli.pdf | 1 Aug 2018 |
| Building Plan Approval (IOD)File: LIG R floor plan Kalamboli.pdf | 1 Aug 2018 |
| Building Plan Approval (IOD)File: EWE Kalamboli.pdf | 1 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: cc kalamboli.pdf | 1 Aug 2018 |
| Declaration in FORM BFile: Form B.pdf | 1 Aug 2018 |
| Certificates of CA (Form 3)File: CA certificate PI Kalamboli.pdf | 1 Aug 2018 |
| Certificates of CA (Form 3)File: CA certificate PII Kalamboli.pdf | 1 Aug 2018 |
| Certificates of CA (Form 3)File: CA certificate PIII Kalamboli.pdf | 1 Aug 2018 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 1 Aug 2018 |
| Proforma of Allotment letterFile: Allotment letter format _ RERA_ corrected by LO_12072018.pdf | 1 Aug 2018 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Construction of 32 Nos of LIG type and 22 EWS type Sector 36 Kharghar | Plot no 2 sector 36 Kharghar | 3,590 | Completed | May 2015 | Late, Jun 2016 |
| Design and construction of 16 nos MIG type and 8 nos HIG type buildings Sect36 Kharghar | Plot 3 Sector 36 Kharghar | 1,224 | Completed | May 2014 | Late, May 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 37 filed documents as one ZIP, foldered, with a manifest
Keep SECTOR 15 ROADPALI KALAMBOLI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Roadpali5,900+ in Raigarh
Filed coordinates, straight-line distance. 107 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: City and Industrial Development Corporation Of Mahrastra Ltd
City and Industrial Development Corporation Of Mahrastra Ltd has 2 registrations on MahaRERA, including Sector 40 Kharghar and SECTOR 15 ROADPALI KALAMBOLI. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SECTOR 15 ROADPALI KALAMBOLI is delayed beyond 30 Sep 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SECTOR 15 ROADPALI KALAMBOLI?
The registered promoter entity is City and Industrial Development Corporation Of Mahrastra Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SECTOR 15 ROADPALI KALAMBOLI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SECTOR 15 ROADPALI KALAMBOLI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SECTOR 15 ROADPALI KALAMBOLI?
The professionals named in the filing: Architect: Shri Shrikant Dinakar Khadilkar Chief Architect BGSCTPL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SECTOR 15 ROADPALI KALAMBOLI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback