Home / Browse projects / Raigarh, Maharashtra / Sea Queen Park

Completed No litigation declared Others project

Sea Queen Park

By Sea Queen Developers Pvt Ltd

RG-MH-68693 · RERA P52000018773 · Last updated on MahaRERA portal: 15 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
90 of 99Construction stages doneacross 9 buildings; furthest along: Podiums (if any), 0%
175 of 271Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 177 documents Report an error

Sea Queen Park is a Others project by Sea Queen Developers Pvt Ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000018773 on 4 Dec 2018. The registration is recorded completed; possession was promised by 12 Jun 2025. The completion date has moved by 6 months from the original filing. 96 of the 271 units on this registration are recorded sold or booked, and 90 of 99 construction stages are filed complete.

At a glance

Project

  • NameSea Queen Park
  • TypeOthers
  • Location
    • Plot 109/5
    • 112/6
    • 112/7
    • Taloje Majkur
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000018773
  • ReraGenie IDRG-MH-68693

Builder

  • NameSea Queen Developers Pvt Ltd
  • Entity typeCompany
  • DirectorSIJO SUNNY MANNAMPONE

Key dates

this monthRegisteredDec 2018First promiseDec 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Dec 2018
  • Promised completion12 Jun 2025
  • Revised completionRevised to 12 Jun 2025 (originally 2 Dec 2024)
  • Buildings9 building records
  • Documents filed177 files

Current status

35%96 of 271 units booked
100.0%Work done, per cost certificate

Figures as on 15 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA54161531
B WingNA5424024
C WingNA7624024
D WingNA7636036
E WingNA7636036
F WingNA7636036
G WingNA7636036
H WingNA7624024
I WingNA5424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 15 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

90 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Podiums (if any), at 0%.

A Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered73
BuildingClosed/CoveredTotal
A Wing11
B Wing66
C Wing88
D Wing55
E Wing66
F Wing1616
G Wing1313
H Wing1313
I Wing55

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,250 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI8245.71
Proposed, not sanctioned8,246 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShabi Complex, Plot 110/111,Sector 12, Vashi
Estimated costRs 32.63 cr
Cost incurredRs 32.63 cr
Work done100.0%
BuildingWingEstimatedIncurred
A WingNARs 3.50 crRs 3.50 cr
B WingNARs 3.50 crRs 3.50 cr
C WingNARs 3.50 crRs 3.50 cr
D WingNARs 3.50 crRs 3.50 cr
E WingNARs 3.50 crRs 3.50 cr
F WingNARs 3.50 crRs 3.50 cr
G WingNARs 3.50 crRs 3.50 cr
H WingNARs 3.50 crRs 3.50 cr
I WingNARs 3.50 crRs 3.50 cr
-NARs 1.11 crRs 1.11 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNagargar & Associates
ArchitectNagarkar & Associates
EngineerStrucon Consulting Engineers
Chartered AccountantDivyesh Sejpal
PartnerRole in project
Sea Queen Developers Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04092502515Dec 2024 → Jun 2025

Reason as filed by the promoterWe, Sea Queen Developers Pvt Ltd the Promoter of the above project, wish to submit the following for your kind consideration: The original project completion date as per registration was 02-12-2024. However, due to a slight delay in obtaining the Occupancy Certificate, the process was extended. We are pleased to inform you that the project is now 100% completed and we have successfully obtained the Occupancy Certificate dated 12-06-2025. Accordingly, we request an extension of the project completion date till 12-06-2025, i.e., the date of issuance of the Occupancy Certificate. We have also att

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed177

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Withdrawal Application Form1.pdf15 Sep 2025
Form 2File: Withdrawal Application Form2.pdf15 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf15 Sep 2025
Form 3File: Form 3 for March 2025.pdf15 Sep 2025
Withdrawal Update Form 1File: Form 1 till the date of OC.pdf15 Sep 2025
Withdrawal Update Form 2File: Form 2 till the Date of OC.pdf15 Sep 2025
Withdrawal Update Form 3File: Form 3 As on OC Date.pdf15 Sep 2025
Occupational CertificateFile: OC .pdf15 Sep 2025
Form 2A (FY 2018-2019)File: Form 2A Sea Queen Park for FY 2018-19.pdf4 Sep 2025
Form 2A (FY 2019-2020)File: Form 2A Sea Queen Park for FY 2019-20.pdf4 Sep 2025
Form 2A (FY 2020-2021)File: Form 2A Sea Queen Park for FY 2020-21.pdf4 Sep 2025
Form 2A (FY 2021-2022)File: Form 2A Sea Queen Park for FY 2021-22.pdf4 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A Sea Queen Park for FY 2022-23.pdf4 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A Sea Queen Park for FY 2023-24.pdf4 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A Sea Queen Park for FY 2024-25.pdf4 Sep 2025
Form 5 (FY 2018-2019)File: Form 5 FY 18-19.pdf4 Sep 2025
Form 5 (FY 2019-2020)File: Form 5 FY 19-20.pdf4 Sep 2025
Form 5 (FY 2021-2022)File: Form 5 FY 21-22.pdf4 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 FY 23-24.pdf4 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf4 Sep 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf2 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf2 Sep 2025
Withdrawal Update Form 3File: Form 3 for March 2025.pdf2 Sep 2025
Form 5 (FY 2020-2021)File: Form 5 20 21.pdf2 Sep 2025
Form 5 (FY 2022-2023)File: form 5 22 23.pdf2 Sep 2025
Form 1File: Form 1 Seaqueen December 2024.pdf31 Aug 2025
Form 2File: Form 2 Sea Queen Park Dec 2024.pdf31 Aug 2025
Form 3File: Form 3 Sea Quuen Dec 2024.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sea queen dece 2024.pdf31 Aug 2025
Form 1File: Form 1 - Sea Queen Park_compressed.pdf31 Aug 2025
Form 2File: Form 2 Seaqueen Sept 2024.pdf31 Aug 2025
Form 3File: Form 3 - SQ Park - July to Sep 24_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sept 2024 Sea Queen.pdf31 Aug 2025
Form 1File: Form 1 June 2024.pdf31 Aug 2025
Form 2File: Form 2 - Sea Queen June 2024.pdf31 Aug 2025
Form 3File: Form 3 Sea Queen June 2024.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024 Taloja.pdf31 Aug 2025
Form 1File: Form 1 March 2024_compressed.pdf31 Aug 2025
Form 2File: Form 2 - Sea Queen Park March 2024.pdf31 Aug 2025
Form 3File: Form 3 March 2024_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold flat Marxh 2024-compressed.pdf31 Aug 2025
Form 1File: Form 1 December 2023_compressed.pdf31 Aug 2025
Form 2File: Form 2 - Sea Queen Park Dec 2023.pdf31 Aug 2025
Form 3File: Form 3 Dec 2023_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold flat December 2023-compressed.pdf31 Aug 2025
Form 1File: FORM 1.pdf31 Aug 2025
Form 2File: FORM 2.pdf31 Aug 2025
Form 3File: Form 3 Sept 2023_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf31 Aug 2025
Form 1File: Form 1 March 2023_compressed.pdf31 Aug 2025
Form 2File: Form 2 - Sea Queen Park March 2023.pdf31 Aug 2025
Form 3File: Form 3 March 2023_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold flat March 2023-compressed.pdf31 Aug 2025
Form 1File: Form 1 Sept 2022_compressed.pdf31 Aug 2025
Form 2File: Form 2 sept 2022.pdf31 Aug 2025
Form 3File: Form 3 sept 2022.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold sept 2022.pdf31 Aug 2025
Form 1File: FORM 1 JUNE 2022.pdf31 Aug 2025
Form 2File: FORM 2 JUNE 2022.pdf31 Aug 2025
Form 3File: FORM 3 JUNE 2022.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold june 2022.pdf31 Aug 2025
Form 1File: Form 1 March 2022_compressed.pdf31 Aug 2025
Form 2File: Form 2 - Sea Queen Park March 2022.pdf31 Aug 2025
Form 3File: Form 3 March 2022_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Flat March 2022-compressed.pdf31 Aug 2025
Form 1File: Form 1 December 2021_compressed.pdf31 Aug 2025
Form 2File: Form 2 - Sea Queen Park December 2021.pdf31 Aug 2025
Form 3File: Form 3 Dec 2021_compressed.pdf31 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Flat December 2021-compressed.pdf31 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SQPARK upto 31 March 25.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 SQDPL upto 31 March 25 (1).pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sea Queen Park (1).pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Sea Queen Park upto 31 March 2025 (1).pdf11 Apr 2025
Certificates of CA (Form 3)File: Form 3 Sea Quuen Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sea Queen Park Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Seaqueen December 2024.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Sea queen dece 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Seaqueen Sept 2024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sea Queen Park form 5 sept 2024.pdf19 Oct 2024
Certificates of CA (Form 3)File: Form 3 - SQ Park - July to Sep 24_compressed.pdf18 Oct 2024

How this compares with Raigarh

35%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 6 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sea Queen Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Taloje Majkur5,900+ in Raigarh

Builder: Sea Queen Developers Pvt Ltd

Sea Queen Developers Pvt Ltd has 1 registration on MahaRERA, including Sea Queen Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sea Queen Park is delayed beyond 12 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sea Queen Park?

The registered promoter entity is Sea Queen Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sea Queen Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sea Queen Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sea Queen Park?

The professionals named in the filing: Architect: Nagargar & Associates; Architect: Nagarkar & Associates; Engineer: Strucon Consulting Engineers; Chartered Accountant: Divyesh Sejpal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sea Queen Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sea Queen Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sea Queen Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.