Home / Browse projects / Mumbai City, Maharashtra / SEA PEARL

Registration lapsed No litigation declared Others project

SEA PEARL

By HINDUSTAN KLOCKNER SWITCHGEAR LTD.

RG-MH-20357 · RERA P51900003487 · Last updated on MahaRERA portal: 4 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
6 of 11Construction stages donefurthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

SEA PEARL is a Others project by HINDUSTAN KLOCKNER SWITCHGEAR LTD. in Mumbai City, Maharashtra, registered with MahaRERA as P51900003487 on 5 Aug 2017. Possession was promised by 29 Dec 2024 and is now 22 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSEA PEARL
  • TypeOthers
  • Location
    • SVP Road
    • Chowpatty
    • Mumbai City
    • 400007
  • Pincode400007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003487
  • ReraGenie IDRG-MH-20357

Builder

  • NameHINDUSTAN KLOCKNER SWITCHGEAR LTD.
  • Entity typeCompany
  • Managing DirectorsRAJANIKANT KANTILAL KADAKIA, SANJAY RAJANIKANT KADAKIA, USHA DINESH SHAH

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseDec 2023Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Aug 2017
  • Promised completion29 Dec 2024
  • Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed123 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SEA PEARLNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

SEA PEARL: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises86%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.68%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.73%

Progress on shared amenities15

As on 4 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area317 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4089.09
Proposed, not sanctioned3,410 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR B WING JAYWANT APARTMENT 63 TARDEO ROAD OPP FILM CENTRE TARDEO MUMBAI 400 034

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
HINDUSTAN KLOCKNER SWITCHGEAR LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900018003Dec 2023 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Nov 2021

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HKS_Form-1.pdf4 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HKS_Form-2.pdf4 Jul 2025
Disclosure of sold/ booked inventoryFile: HKS_Inventory.pdf4 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025.pdf3 Jul 2025
Certificates of CA (Form 3)File: Form 3 March 2025.pdf3 Jul 2025
Certificates of CA (Form 3)File: HKS Form-3_Sing Mar 25.pdf3 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025.pdf3 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: HKS Form-5_Sign 24-25.pdf3 Jul 2025
Certificates of CA (Form 3)File: Form 3 Dec 2025.pdf5 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf5 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf5 Apr 2025
Declaration in FORM BFile: Form B.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf13 Mar 2025
Certificates of CA (Form 5)File: Form 5 17-18.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf13 Mar 2025
Other - TechnicalFile: PERT Chart.pdf13 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sea Pearl as on Dec 2024.pdf15 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Sea Pearl as on Dec 2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sea Pearl as on Dec 2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sea Pearl as on June 2024.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sea Pearl as on Sep 2024.pdf26 Nov 2024
Certificates of CA (Form 3)File: Form 3 - Sea Pearl as on June 2024 (SIGNED).pdf25 Nov 2024
Certificates of CA (Form 3)File: Form 3 - Sea Pearl as on Sep 2024 (SIGNED).pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: HKS FORM-5_Sign.pdf25 Nov 2024
Certificates of CA (Form 3)File: Form 3 - Sea Pearl as on June 2024.pdf19 Nov 2024
Certificates of CA (Form 3)File: Form 3 - Sea Pearl as on Sep 2024.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sea Pearl as on March 2024.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sea Pearl as on March 2024.pdf13 May 2024
Certificates of CA (Form 3)File: Form 3 - Sea Pearl as on March 2024.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Apr 2024
Certificates of CA (Form 3)File: Form 3 Sign.pdf1 Apr 2024
Certificates of CA (Form 3)File: Form-3 Sign as on Sept 2023.pdf5 Mar 2024
Declaration in FORM BFile: Affidivit.PDF20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23.PDF20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: Circular 29- Sea Pearl (2).PDF11 Nov 2023
Certificates of CA (Form 3)File: Form 3 as on June 2023_compressed.pdf25 Oct 2023
Certificates of CA (Form 3)File: Form 3_11zon.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.PDF10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 03-08-2023.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30-06-2023.pdf5 Oct 2023
Certificates of CA (Form 3)File: Form 3 31-03-2023_compressed.pdf10 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 as on 31-03-2023.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_HKS as on 31-03-2023_Final.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 3 Certificates of CA (Form 5).pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sea Pearl - Form 2 (Oct 2018).pdf29 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sea Pearl - Form 2 (Feb 2020).pdf29 Mar 2023
Certificates of CA (Form 3)File: Form 3- Sea Pearl as on December 2021.pdf29 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HKS_FORM_1.PDF23 Feb 2023
Certificates of CA (Form 3)File: HKS Form 3 - June 2022.pdf23 Feb 2023
Certificates of CA (Form 3)File: HKS Form 3 - September 2022.pdf23 Feb 2023
Certificates of CA (Form 3)File: HKS Form 3 - December 2022.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: HKS_FORM 5 FY 2019-20_FINAL.pdf8 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on March 2020.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on March 2021.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on December 2021.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on March 2022.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on June 2022.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on September 2022.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised_Form 2 March 2021.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_HKS_as on March 2022.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_HKS_ as on June 2022.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_HKS as on September 2022.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_HKS as on December 2022.pdf1 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: HKS Form 2A FY 2021-22.PDF14 Jan 2023
Certificates of CA (Form 3)File: HKS FORM 3 as on March 2022_compressed.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 HKS 2020-21_compressed.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5HKS 2021-22_compressed.pdf14 Jan 2023
CERSAI detailsFile: Sea Pearl.pdf3 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sea Pearl.pdf24 Nov 2022
Declaration about Commencement CertificateFile: Circular 32 - Sea Pearl.pdf19 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sea Pearl Sept 21.PDF19 Nov 2021
Certificates of CA (Form 3)File: Form 3 Sea Pearl Mar 21_compressed.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Oc - Sea Pearl.pdf19 Nov 2021

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 12 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SEA PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chowpatty780+ in Mumbai City

2 kmSEA PEARLCompleted 17Lapsed / revoked 17Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 89 registered projects within 2 km.

Builder: HINDUSTAN KLOCKNER SWITCHGEAR LTD.

HINDUSTAN KLOCKNER SWITCHGEAR LTD. has 1 registration on MahaRERA, including SEA PEARL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that SEA PEARL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SEA PEARL is delayed beyond 29 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SEA PEARL?

The registered promoter entity is HINDUSTAN KLOCKNER SWITCHGEAR LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SEA PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SEA PEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SEA PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEA PEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEA PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.