ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Sea Breeze CHS Ltd

Registration lapsed No litigation declared Residential / Group Housing project

Sea Breeze CHS Ltd

By NDZ Infrastructure Private Limited

RG-MH-12403 · RERA P51800008146 · Last updated on MahaRERA portal: 31 Mar 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
8 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 97%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Sea Breeze CHS Ltd is a Residential / Group Housing project by NDZ Infrastructure Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008146 on 18 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date.

At a glance

Project

  • NameSea Breeze CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400074
  • Pincode400074
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008146
  • ReraGenie IDRG-MH-12403

Builder

  • NameNDZ Infrastructure Private Limited
  • Entity typeCompany
  • Managing DirectorNazia Adil Patel

Key dates

46 months past promisethis monthRegisteredAug 2017PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings4 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sea Breeze CHS Ltd - ANA200000
Sea Breeze CHS Ltd - BNA200000
Sea Breeze CHS Ltd - CNA190000
Sea Breeze CHS Ltd - DNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 31 Mar 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 97%.

Sea Breeze CHS Ltd - A44%
ActivityProgress
Excavation97%
Basement (if any)100%
Podiums (if any)30%
Plinth100%
Stilt Floor70%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sea Breeze CHS Ltd - B44%
ActivityProgress
Excavation97%
Basement (if any)100%
Podiums (if any)30%
Plinth100%
Stilt Floor70%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sea Breeze CHS Ltd - C39%
ActivityProgress
Excavation97%
Basement (if any)100%
Podiums (if any)30%
Plinth100%
Stilt Floor70%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sea Breeze CHS Ltd - D39%
ActivityProgress
Excavation97%
Basement (if any)100%
Podiums (if any)30%
Plinth100%
Stilt Floor70%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Mar 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed197

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots197
Closed/Covered196
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
Sea Breeze CHS Ltd - A36036
Sea Breeze CHS Ltd - B36036
Sea Breeze CHS Ltd - C59059
Sea Breeze CHS Ltd - D65166

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,899 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11328.0
Proposed, not sanctioned4,999 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVile Parle East

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHemant Ambre & Associates
EngineerParas Consultants
PartnerRole in project
NDZ Infrastructure Private Limited-

Litigation declared9

CaseCourtStatus
S/2690/2008/2008High Court MumbaiCase Disposed
WP/1071/2014/2014High Court MumbaiDisposed
WP/1066/2014/2014High Court MumbaiDisposed
1080/2013/2013City Session Court MumbaiDisposed
906/2013/2013City Session Court MumbaiDisposed
WP/2811/2013/2013High Court MumbaiPre Admission
Arbitration Petition L NO 1567 of 2018/2018High Court MumbaiOrder
Arbitration Petition L NO 1567 of 2018/2018High Court MumbaiConsent Terms
Arbitration Petition L NO 1567 of 2018/2018High Court MumbaiArbitration Petition

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Form 5 SBP.pdf31 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MSB.pdf30 Jun 2018
Certificates of CA (Form 5)File: Mahul.pdf30 Jun 2018
Proforma of Allotment letterFile: Draft Agg for sale.pdf30 Jun 2018
Certificates of CA (Form 5)File: MSB.pdf1 Mar 2018
OtherFile: CFO Plan 1.pdf16 Aug 2017
OtherFile: CFO Plan 2.pdf16 Aug 2017
OtherFile: CFO Plan 3.pdf16 Aug 2017
OtherFile: CFO Plan 4.pdf16 Aug 2017
OtherFile: CFO Plan 5.pdf16 Aug 2017
OtherFile: CFO Plan 6.pdf16 Aug 2017
OtherFile: CFO Plan 7.pdf16 Aug 2017
OtherFile: CFO Plan 8.pdf16 Aug 2017
OtherFile: CFO Plan 8.pdf16 Aug 2017
OtherFile: CFO Plan 10.pdf16 Aug 2017
OtherFile: CFO Plan 11.pdf16 Aug 2017
OtherFile: Traffic NOC - 24712.pdf16 Aug 2017
OtherFile: Traffic NOC - 1.pdf16 Aug 2017
OtherFile: Traffic NOC - 2.pdf16 Aug 2017
OtherFile: Traffic NOC - 3.pdf16 Aug 2017
OtherFile: Traffic NOC - 4.pdf16 Aug 2017
OtherFile: Ltr for Demarcation.pdf16 Aug 2017
OtherFile: Demarkation plan.pdf16 Aug 2017
Layout approvalFile: IOD Plan 1.pdf30 Jul 2017
Copy of the legal title reportFile: conveyance Deed lodged.pdf30 Jul 2017
Copy of the legal title reportFile: Index - DA.pdf30 Jul 2017
Copy of the legal title reportFile: AM IOD 07616.pdf30 Jul 2017
Copy of the legal title reportFile: Commencement certificate.pdf30 Jul 2017
Copy of the legal title reportFile: IOD 2008.pdf30 Jul 2017
Details of encumbrancesFile: Form B.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD Plan 1.pdf30 Jul 2017
Declaration in FORM BFile: Form B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifcate.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: C A Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Draft Agg for sale.pdf30 Jul 2017
OtherFile: CFO-16712.pdf30 Jul 2017
Building plan approvalFile: IOD Plan 7.pdf25 Jul 2017
Building plan approvalFile: IOD Plan 6.pdf25 Jul 2017
Building plan approvalFile: AM IOD 07616.pdf25 Jul 2017
Building plan approvalFile: IOD Plan 1.pdf25 Jul 2017
Building plan approvalFile: IOD Plan 2.pdf25 Jul 2017
Building plan approvalFile: IOD Plan 3.pdf25 Jul 2017
Building plan approvalFile: IOD Plan 4.pdf25 Jul 2017
Building plan approvalFile: IOD Plan 5.pdf25 Jul 2017
Building Plan Approval (IOD)File: AM IOD 07616.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 1.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 2.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 3.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 4.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 5.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 6.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plan 7.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf22 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sea Breeze CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmSea Breeze CHS LtdCompleted 9Lapsed / revoked 8Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: NDZ Infrastructure Private Limited

NDZ Infrastructure Private Limited has 1 registration on MahaRERA, including Sea Breeze CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Sea Breeze CHS Ltd shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sea Breeze CHS Ltd is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sea Breeze CHS Ltd?

The registered promoter entity is NDZ Infrastructure Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sea Breeze CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sea Breeze CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sea Breeze CHS Ltd?

The professionals named in the filing: Architect: Hemant Ambre & Associates; Engineer: Paras Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sea Breeze CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sea Breeze CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sea Breeze CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.