De-registered No litigation declared Residential / Group Housing project

SDPL Greens II

By SANDEEP DWELLERS PVT. LTD.

RG-MH-01652 · RERA P50500007483 · Last updated on MahaRERA portal: 22 Oct 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
0Complaints at MahaRERAon this registration
Jump to the 166 documents Report an error

SDPL Greens II is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500007483 on 17 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameSDPL Greens II
  • TypeResidential / Group Housing
  • Location
    • Kamptee Road
    • Wanjara
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440026
  • Pincode440026
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500007483
  • ReraGenie IDRG-MH-01652

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on17 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed166 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA90000
C WingNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

A Wing46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Wing46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities19

As on 22 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes75%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes0%
Society OfficeYes25%
Security CCTV CameraYes0%
LiftYes0%
Generator Back upYes0%

Parking filed91

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots91
Closed/Covered46
Open Space45
BuildingClosed/CoveredOpen SpaceTotal
A Wing232447
C Wing232144

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,879 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI3417.84
Proposed, not sanctioned3,418 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishnu Vaibhav 222 Palm Road Civil Lines Nagpur 440001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Agarwala
EngineerPrasanna Kulkarni
Chartered AccountantParesh Jairam Tank
Chartered AccountantB C Bhartia
Chartered AccountantParesh Tank
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed166

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: SDPL Greens 2_compressed.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Greens 2_compressed.pdf17 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Greens 2.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Greens II - Supervisor - 2024.pdf14 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Greens Architect.pdf30 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greens Engineer.pdf30 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Greens Architect.pdf17 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greens Engineer.pdf17 Jul 2024
Certificates of CA (Form 3)File: SDPL Greens 2_compressed.pdf15 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Greens 2 - Architect - 30Jun24.pdf13 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Greens 2 - Engineer - 30Jun24.pdf13 Jul 2024
Certificates of CA (Form 3)File: Greens II - CA Certificate - 31Mar24.pdf22 Apr 2024
Certificates of CA (Form 3)File: GREENS II_Annexure - 31Mar24.pdf22 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Greens 2_compressed.pdf10 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Greens 2.pdf10 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - SDPL Greens 2- Dec23.pdf13 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - SDPL Greens 2- Dec23.pdf13 Jan 2024
Certificates of CA (Form 3)File: CA - SDPL Greens-2- Dec23.pdf13 Jan 2024
Certificates of CA (Form 3)File: SDPL Greens 2_compressed.pdf14 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect- Greens II- 30Sep23.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - SDPL Greens 2- Sep 23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Paradise 2.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Greens 2.pdf29 Sep 2023
Certificates of CA (Form 3)File: sdpl Greens 2.pdf13 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect- SDPL Greens 2- 30Jun23.pdf7 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - SDPL Greens 2- 30Jun23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Greens II - Supervisor - 31 March 23.pdf19 Jun 2023
Certificates of CA (Form 3)File: SDPL Greens 2_compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Greens -2_compressed.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Greens-2_compressed.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 2020 - Greens II.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SDPL-Green ll.pdf12 Jan 2023
Certificates of CA (Form 3)File: SDPL Greens 2_compressed.pdf10 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Greens 2_compressed.pdf5 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sdpl Greens 2 .pdf5 Jan 2023
Certificates of CA (Form 3)File: SDPL Greens 2_compressed.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SDPL Greens II_compressed.pdf8 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Greens II_compressed.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Greens 2_compressed.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL Greens II_compressed.pdf27 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate- Greens -2_compressed.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engi Greens 2_compressed.pdf7 Jul 2022
Certificates of CA (Form 3)File: Greens 2_compressed.pdf7 Jul 2022
Certificates of CA (Form 3)File: SDPL greens 2 Certificate.pdf11 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate GREENS-2_compressed.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate SG 2_compressed.pdf7 Apr 2022
Form 2AFile: Supervisor Certificate GREENS-2_compressed.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inventory Greens 2_compressed.pdf7 Apr 2022
Building plan approvalFile: SDPL Greens sanction_compressed_P1.pdf20 Jan 2022
Building plan approvalFile: SDPL Greens sanction_compressed_P2.pdf20 Jan 2022
Building Plan Approval (IOD)File: SDPL Greens sanction_compressed_P1.pdf20 Jan 2022
Building Plan Approval (IOD)File: SDPL Greens sanction_compressed_P2.pdf20 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Permit.pdf20 Jan 2022
Certificates of CA (Form 3)File: SDPL Greens II_compressed.pdf6 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Greens II.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Greens II.pdf7 Oct 2021
Form 2AFile: Supervisor - Wanjara II.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold unsold - Greens II.pdf7 Oct 2021
Certificates of CA (Form 3)File: SDPL Greens II.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL GREENS -II.pdf30 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Greens II - Jun 21_compressed.pdf20 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Greens II - Jun 21_compressed.pdf20 Jul 2021
Form 2AFile: Site Supervisor Cert-SDPL Grrens II.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold unsold - Greens II - July 21.pdf20 Jul 2021
Certificates of CA (Form 3)File: SDPL Greens II_compressed.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: Form 3A - Sold unsold - Greens II - Mar 21.pdf26 May 2021
Certificates of CA (Form 3)File: Rear SDPL Greens II.pdf12 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert-SDPL Greens II_compressed.pdf8 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL GREEN'S II, ENGINEER CERTIFICATE -min.pdf8 Apr 2021
Form 2AFile: Site Supervisor Cert-SDPL Grrens II.pdf8 Apr 2021
Certificates of CA (Form 3)File: SDPL - GREENS- II-min.pdf14 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: greens 2 - architect- dec 20-compressed.pdf9 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greens 2 - engineer - dec 20-compressed.pdf9 Jan 2021
Form 2AFile: greens 2 - site supervisor- dec 20.pdf9 Jan 2021
Certificates of CA (Form 3)File: Greens - CA Certificate - 30 Sept.pdf8 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Greens - Architect - 30 Sept.pdf7 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greens - Engineer - 30 Sept.pdf7 Oct 2020
Form 2AFile: Greens - Supervisor -30 Sept.pdf3 Oct 2020
Details of Restarting of Construction work post lockdownFile: SDPL greens -2.pdf18 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Greens - 31 Dec 19.pdf6 Jan 2020

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SDPL Greens II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wanjara2,800+ in Nagpur

2 kmSDPL Greens IICompleted 6Lapsed / revoked 5Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that SDPL Greens II shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SDPL Greens II is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SDPL Greens II?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SDPL Greens II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SDPL Greens II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SDPL Greens II?

The professionals named in the filing: Architect: Rahul Agarwala; Engineer: Prasanna Kulkarni; Chartered Accountant: Paresh Jairam Tank; Chartered Accountant: B C Bhartia; Chartered Accountant: Paresh Tank. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SDPL Greens II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SDPL Greens II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SDPL Greens II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.