SDPL Aashray Wanjara - II
RG-MH-86655 · RERA P50500018042 · Last updated on MahaRERA portal: 2 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 52 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SDPL Aashray Wanjara - II is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500018042 on 10 Oct 2018. Possession is promised by 29 Apr 2028. The completion date has moved by 52 months from the original filing. 53 of the 137 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSDPL Aashray Wanjara - II
- TypeResidential / Group Housing
- Location
- Kamptee Road
- Wanjara
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440026
- Pincode440026
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500018042
- ReraGenie IDRG-MH-86655
Builder
- NameSANDEEP DWELLERS PVT. LTD.
- Entity typeCompany
- CINU45200MH1990PTC058101
- GSTIN27AACCS0133P1Z9
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorASHOK SUBHASKUMAR AGARWALA
- DirectorsGaurav Agarwala, Anil Subhaskumar Agarwala, Rahul Agarwala
- Other registrations26 more →
- Completed13 of 27
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Oct 2018
- Promised completion29 Apr 2028
- Revised completionRevised to 29 Apr 2028 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed272 files
Current status
Figures as on 2 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 2 | NA | 8 | 8 | 72 | 0 | 72 |
| Wing 3 | NA | 8 | 8 | 65 | 0 | 65 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.
Wing 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing 338%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 2 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 50% |
Parking filed27
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing 2 | 13 | 13 |
| Wing 3 | 14 | 14 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing 2 | NA | Rs 2.96 cr | Rs 2.96 cr |
| Wing 3 | NA | Rs 2.67 cr | Rs 66.83 lakh |
| - | NA | Rs 41.75 lakh | Rs 29.64 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rahul Agarwala |
| Engineer | Aman Kumar Singh |
| Engineer | Ashish Shiwarkar |
| Engineer | Prasanna Kulkarni |
| Chartered Accountant | Akshay Yawalkar |
| Chartered Accountant | Balkrishna Bhartia |
| Chartered Accountant | Paresh Tank |
| Partner | Role in project |
|---|---|
| SANDEEP DWELLERS PVT. LTD. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere are two wings in the project: Wing 2 and Wing 3. Wing 2: Construction was completed, and the Part Occupancy Certificate (for full Wing 2) dated 17.08.22 along with Form 4 Architect Certificate was uploaded on 18.08.22 on the old MahaRERA website, before the project completion date of 30.12.2023. Wing 3: Construction was stopped after completion of the foundation due to a sudden decline in demand for EWS/LIG affordable housing during the Covid pandemic, which made constructing the Wing 3 of the project not prudent at that time. No flats were sold to any of the allottees in Wing 3. Hence,
Reason as filed by the promoterNA
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12605259 | SANDEEP DWELLERS PVT. LTD. | OM PRAKASH SAINI | 18/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Apr 2023
Documents filed272
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 272 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A - SAW II.pdf | 2 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - SAW II.pdf | 2 Sep 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Aashray Wanjara II - 25-26.pdf | 6 Aug 2026 |
| Form 5 (FY 2025-2026)File: Form 5 - Aashray Wanjara II - 25-26.pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: SAW II - Architect - June 26.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: SAW II - Engineer - June 26.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Aashray Wanjara 2 - CA - June 26.pdf | 21 Jul 2026 |
| Form 1File: Aashray Wanjara 2 - Architect - 31Mar24.pdf | 25 Jun 2026 |
| Form 2File: Aashray Wanjara 2 - Engineer - 31Mar24.pdf | 25 Jun 2026 |
| Form 3File: AASHRAY WANJARA-II - CA Certificate - 31Mar24.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: WANJARA II_Annexure - 31Mar24.pdf | 25 Jun 2026 |
| Form 1File: Aashray Wanjara 2 - Architect - 30Jun24.pdf | 25 Jun 2026 |
| Form 2File: Aashray Wanjara 2 - Engineer - 30Jun24.pdf | 25 Jun 2026 |
| Form 3File: Aashraya Wanjara 2_compressed- CA.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashraya Wanjara 2_compressed- CA.pdf | 25 Jun 2026 |
| Form 1File: Aasharay Wanjara 2- Architect - Oct 24.pdf | 25 Jun 2026 |
| Form 2File: Aashray Wanjara 2 - Engineer - 30Jun24.pdf | 25 Jun 2026 |
| Form 3File: Aashray Wanjara 2_compressed- CA - Oct 24.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashray Wanjara 2_compressed- CA - Oct 24.pdf | 25 Jun 2026 |
| Form 1File: Aashray Wanjara 2- Architect - Dec 24.pdf | 25 Jun 2026 |
| Form 2File: Aashray Wanjara 2- Engineer - Dec 24.pdf | 25 Jun 2026 |
| Form 3File: Aashray Wanjara 2- CA - Dec 24.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashray Wanjara 2- CA - Dec 24.pdf | 25 Jun 2026 |
| Form 1File: Aashray Wanjara 2- Architect - Mar 25.pdf | 25 Jun 2026 |
| Form 2File: Aashray Wanjara 2- Engineer - Mar 25.pdf | 25 Jun 2026 |
| Form 3File: Aashray Wanjara II - CA - Mar 25-compressed.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashray Wanjara II - CA - Mar 25-compressed.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: SAW II - Architect Form 1 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: SAW II - Architect Form 1 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: SAW II - Architect Form 1 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: SAW II - Architect Form 1 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: SAW II - Engineer Form 2 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: SAW II - Engineer Form 2 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: SAW II - Engineer Form 2 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: SAW II - Engineer Form 2 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: SAW II - CA Form 3 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: SAW II - CA Form 3 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: SAW II - CA Form 3 - Mar 26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: SAW II - CA Form 3 - Mar 26.pdf | 25 Jun 2026 |
| Form 1File: Aashray Wanjara 2 -Architect - 30 Sept.pdf | 13 May 2026 |
| Form 2File: Wanjara 2 - Engineer - 30 Sept.pdf | 13 May 2026 |
| Form 3File: Aashray Wanjara - CA Certificate - 30 Sept 2.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashray Wanjara - CA Certificate - 30 Sept 2.pdf | 13 May 2026 |
| Form 1File: Aashray Wanjara 2 -Architect - 30 Sept.pdf | 13 May 2026 |
| Form 2File: Wanjara 2 - Engineer - 30 Sept.pdf | 13 May 2026 |
| Form 3File: Aashray Wanjara - CA Certificate - 30 Sept 2.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashray Wanjara - CA Certificate - 30 Sept 2.pdf | 13 May 2026 |
| Form 1File: ashray wanjara 2 - architect - dec 20.pdf | 13 May 2026 |
| Form 2File: Aashray wanjara 2 - engineers-dec 20.pdf | 13 May 2026 |
| Form 3File: Aashray wanjara-min.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Aashray wanjara-min.pdf | 13 May 2026 |
| Form 1File: Architect Cert-SDPL Aashray Wanjara II-min.pdf | 13 May 2026 |
| Form 2File: Architect Cert-SDPL Aashray Wanjara II_compressed.pdf | 13 May 2026 |
| Form 3File: RERA WANJARA II_compressed.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Form 3A - Sold unsold - Wanjara II - Mar 21.pdf | 13 May 2026 |
| Form 1File: Architect - Wanjara II - Jun 21_compressed.pdf | 13 May 2026 |
| Form 2File: Engineer - Wanjara - Jun 21_compressed.pdf | 13 May 2026 |
| Form 3File: SDPL Wanjara II_compressed.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold - Wanjara - July 21_compressed.pdf | 13 May 2026 |
| Form 1File: Architect - Aashray Wanjara II.pdf | 13 May 2026 |
| Form 2File: Engineer - Aashray Wanjara.pdf | 13 May 2026 |
| Form 3File: SDPL AASHRAY WANJRA.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SDPL AASHRAY WANJRA.pdf | 13 May 2026 |
| Form 1File: WANJARA-2.pdf | 13 May 2026 |
| Form 2File: Engi Wanjara.pdf | 13 May 2026 |
| Form 3File: SDPL- Aashray Wanjara-II_compressed.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SDPL- Aashray Wanjara-II_compressed.pdf | 13 May 2026 |
| Form 1File: Architect Certificate -Wanjara 2.pdf | 13 May 2026 |
| Form 2File: Engineer Certificate Wanjara -2.pdf | 13 May 2026 |
| Form 3File: SDPL ashray wanjara 2 Cerificate.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory Wanjara 2_compressed.pdf | 13 May 2026 |
| Form 1File: Architect certificate- Wanjara -2_compressed.pdf | 13 May 2026 |
| Form 2File: Engineer Wanjara_compressed.pdf | 13 May 2026 |
| Form 3File: CA SDPL Wanjara -2.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: CA SDPL Wanjara -2.pdf | 13 May 2026 |
| Form 1File: Architect - SDPL Aashray Wanjara I- Sep 22.pdf | 13 May 2026 |
| Form 2File: Engineer - SDPL Aashray Wanjara 2_compresse- Sep 22d.pdf | 13 May 2026 |
| Form 3File: CA - CA Certificate Aahray Wanjara 2_compresse- Sep 22d.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: CA - CA Certificate Aahray Wanjara 2_compresse- Sep 22d.pdf | 13 May 2026 |
| Form 1File: Architect -SDPL Wanjara 2- Dec 22.pdf | 13 May 2026 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SDPL Classic | Plot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 440025 | 43 | Completed | Jun 2017 | Apr 2017 |
| SDPL Greens Wing B and D and Convenience Shopping | Kh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026 | 131 | Completed | May 2017 | Nov 2016 |
| SDPL Paradise Wing A and B | Behind Water Tank Dabha Nagpur 440023 | 72 | Completed | Sep 2016 | Late, Oct 2016 |
| Shree Swaminarayan Enclave | Next to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 440008 | 98 | Completed | Dec 2014 | Late, Feb 2015 |
| NILGIRI | Opp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 440026 | 55 | Completed | Sep 2014 | Late, Dec 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 26 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 272 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SDPL Aashray Wanjara - II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wanjara2,800+ in Nagpur
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
Swapnapurtee - A Project by NMC
SANDEEP DWELLERS PVT. LTD.
KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE
KARAN KOTHARI BUSINESS PARK PRIVATE LIMITE
HBA PARK PHASE-I
HBA CONSTRUCTION COMPANY PVT.LTD
OAK SHANTINIKETAN
OAK Constructions
RAI CREST
RAI UDYOG UNITY MEDISCIENCE PRIVATE LIMITE
BHIL CITY 3
MOHAN BAPURAO MAKDE
See every Nagpur project, with the district possession charts
Builder: SANDEEP DWELLERS PVT. LTD.
SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SDPL Aashray Wanjara - II is delayed beyond 29 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SDPL Aashray Wanjara - II?
The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SDPL Aashray Wanjara - II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SDPL Aashray Wanjara - II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SDPL Aashray Wanjara - II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SDPL Aashray Wanjara - II?
The professionals named in the filing: Architect: Rahul Agarwala; Engineer: Aman Kumar Singh; Engineer: Ashish Shiwarkar; Engineer: Prasanna Kulkarni; Chartered Accountant: Akshay Yawalkar; Chartered Accountant: Balkrishna Bhartia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SDPL Aashray Wanjara - II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback