ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SBM SKY

Registered No litigation declared Residential / Group Housing project

SBM SKY

By SBM DEVELOPERS PVT LTD

RG-MH-04395 · RERA P51700021785 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 29 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 29 months from the original
0 of 11Construction stages donefurthest along: Excavation, 95%
100 of 225Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SBM SKY is a Residential / Group Housing project by SBM DEVELOPERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700021785 on 29 Jul 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 29 months from the original filing. 125 of the 225 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSBM SKY
  • TypeResidential / Group Housing
  • Location
    • POKHRAN ROAD NO. 1
    • THANE WEST
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • RERA no.P51700021785
  • ReraGenie IDRG-MH-04395

Builder

  • NameSBM DEVELOPERS PVT LTD
  • Entity typeCompany
  • DirectorSUSHILA SURESH MALGE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2019First promiseJul 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Jul 2025)
  • Buildings1 building record
  • Documents filed70 files

Current status

56%125 of 225 units booked
35.3%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SBM SKYNA30302250225

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

SBM SKY: 51% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor50%
Slabs of Super Structure82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises62%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,735 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025
LandownerVillageDistrict
SHRAM SAFALYAThane (M Corp.)Thane
M/s. Swamiraj ConstructionsThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI3470.0
Proposed, not sanctioned1,735 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5 GAURANGI CHAMBER LBS MARG THANE WEST OPP DAMANI ESTATE
Estimated costRs 71.50 cr
Cost incurredRs 25.23 cr
Work done35.29%
BuildingWingEstimatedIncurred
SBM SKYNARs 71.50 crRs 25.23 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN CONSORTIUM
EngineerShivraj
Chartered AccountantShripati Gandhi Choudhari & Co
Chartered AccountantRahul Bera & Associates
PartnerRole in project
SBM DEVELOPERS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018937Jul 2025 → Dec 2027

Reason as filed by the promoterAs per the attachment

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 signed.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf6 Jun 2026
Withdrawal Update Form 3File: Signed Form 3.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 - SBM Sky - Sept 25.pdf25 Feb 2026
Withdrawal Update Form 1File: Form 1 - Dec 25.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 - SBM Sky - Sept 25.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 - Dec 25.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 - SBM Sky - Sept 25_compressed.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 - New_compressed.pdf25 Feb 2026
Form 1File: Form 1 - March 25.pdf8 Sep 2025
Form 2File: Form 2 - March 25.pdf8 Sep 2025
Form 3File: Form 3 - March 25.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25.pdf8 Sep 2025
Withdrawal Update Form 1File: Form 1 - June 25.pdf8 Sep 2025
Withdrawal Update Form 2File: Form 2 - June 25.pdf8 Sep 2025
Withdrawal Update Form 3File: form 3 - June 25_compressed.pdf8 Sep 2025
Form 1File: Form1.pdf9 Jul 2025
Form 2File: Form 2 - Dec 24.pdf9 Jul 2025
Form 3File: Form 3 - SBM Sky - December 24.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24.pdf9 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 24.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 - SBM Sky - December 24.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Dec 24.pdf28 Jan 2025
Certificates of CA (Form 3)File: Form 3 - June 24.pdf9 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Sept 24.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE June.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cerfificate Sept.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure - June 24.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Sept 24.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Nov 2024
Certificates of CA (Form 3)File: Signed Form 3.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf18 Oct 2024
Copy of the legal title reportFile: Title certificate.pdf5 Mar 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate 2020.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate 2021.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate 2022.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate 2023.pdf31 Jan 2024
CERSAI detailsFile: Declaration of CERSAI.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory_310124.pdf31 Jan 2024
Declaration in FORM BFile: Form B.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: certificate of percentage of completion SBM.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-2020.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-2021.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-2022.pdf29 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-2023.pdf29 Jan 2024
Certificates of CA (Form 3)File: Form 3 March 20 Promoter acceptance_compressed.pdf29 Jan 2024
Certificates of CA (Form 3)File: FORM 3 MARCH 2021 Promoter acceptance_compressed.pdf29 Jan 2024
Certificates of CA (Form 3)File: Form-3 MARCH 2022 promoter acceptance_compressed.pdf29 Jan 2024
Certificates of CA (Form 3)File: Form-3 MARCH 2023 Promoter acceptance_compressed.pdf29 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of sold booked inventory_compressed.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf29 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: certificate of percentage of completion SBM.pdf13 Dec 2023
Certificates of CA (Form 3)File: SBM - Vartak Nagar - CA Certificate.pdf16 Jul 2019
Building plan approvalFile: SBM - Varkat Nagar - Approved plan copy3 .pdf15 Jul 2019
Copy of the legal title reportFile: SBM - Vartak Nagar - Title Certificate.pdf15 Jul 2019
Building Plan Approval (IOD)File: SBM - Varkat Nagar - Approved plan copy3 .pdf15 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: SBM - Vartak Nagar - CC.pdf15 Jul 2019
Declaration in FORM BFile: SBM - Vartak Nagar - FORM B.pdf15 Jul 2019
Declaration in FORM BFile: SBM - Vartak Nagar - FORM B 1.pdf15 Jul 2019
Declaration in FORM BFile: SBM - Vartak Nagar - FORM B 2.pdf15 Jul 2019
Layout approvalFile: SBM - Varkat Nagar - Approved plan copy3 .pdf13 Jul 2019
Details of encumbrancesFile: SBM - Vartak Nagar - Details of No Encumberance.pdf13 Jul 2019
Copy of Layout Approval (in case of layout)File: SBM - Varkat Nagar - Approved plan copy3 .pdf13 Jul 2019
Proforma of Allotment letterFile: SBM - Vartak Nagar - Allotment Letter.pdf13 Jul 2019

How this compares with Thane

56%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 29 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SBM SKY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE WEST7,600+ in Thane

Builder: SBM DEVELOPERS PVT LTD

SBM DEVELOPERS PVT LTD has 2 registrations on MahaRERA, including SBM SKY and SBM CLASSIQUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SBM SKY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SBM SKY?

The registered promoter entity is SBM DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SBM SKY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SBM SKY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SBM SKY?

The professionals named in the filing: Architect: DESIGN CONSORTIUM; Engineer: Shivraj; Chartered Accountant: Shripati Gandhi Choudhari & Co; Chartered Accountant: Rahul Bera & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SBM SKY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SBM SKY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SBM SKY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.