Home / Browse projects / Kolhapur, Maharashtra / SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY

Registered No litigation declared Residential / Group Housing project

SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY

By CONSTRUO DEVELOPER

RG-MH-23369 · RERA P53000078677 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Excavation, 80%
28 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY is a Residential / Group Housing project by CONSTRUO DEVELOPER in Kolhapur, Maharashtra, registered with MahaRERA as P53000078677 on 1 Jan 2025. Possession is promised by 31 Mar 2027. 5 of the 33 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY
  • TypeResidential / Group Housing
  • Location
    • SURVE COLONY
    • TARABAI PARK
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416003
  • Pincode416003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000078677
  • ReraGenie IDRG-MH-23369

Builder

  • NameCONSTRUO DEVELOPER
  • Entity typePartnership
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jan 2025
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

15%5 of 33 units booked
12.3%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAR RESIDENCYNA10733033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

OMKAR RESIDENCY: 60% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered1
Open Space71

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,022 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jan 2026
LandownerVillageDistrict
STATE BANK OF INDIA EMPLOYEES OMKAR CO OP HOUSINGKolhapur (M Corp.)Kolhapur
CONSTRUO DEVELOPERKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKOLHAPUR MUNCIPAL CORPORATION
Permissible FSI3076.77
Proposed, not sanctioned3,077 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1436/A, LAXMIPURI, WARD NO. C,KOLHAPUR - 416002,E-MAIL : [email protected]
Estimated costRs 6.13 cr
Cost incurredRs 75.25 lakh
Work done12.27%
BuildingWingEstimatedIncurred
OMKAR RESIDENCYNARs 5.98 crRs 75.25 lakh
-NARs 15.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHOLE AND ASSOCIATES
EngineerSAKSHI KEDAR SAMANGADKAR
Chartered AccountantPRAKASH SHELAKE AND ASSOCIATES
Chartered AccountantKGB AND J ASSOCIATES
PartnerRole in project
CONSTRUO DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: WITHDRAWL FORM 1.pdf16 Apr 2026
Withdrawal Update Form 1File: WITHDRAWL FORM 1.pdf16 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf16 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf16 Apr 2026
Withdrawal Update Form 3File: Withdrawal form3.pdf16 Apr 2026
Withdrawal Update Form 3File: Withdrawal form3.pdf16 Apr 2026
Withdrawal Update Form 1File: form 1 _21JAN 2026.pdf21 Jan 2026
Withdrawal Update Form 1File: form 1 _21JAN 2026.pdf21 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf21 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf21 Jan 2026
Withdrawal Update Form 3File: Form3Dec.pdf21 Jan 2026
Withdrawal Update Form 3File: Form3Dec.pdf21 Jan 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf6 Nov 2025
Withdrawal Update Form 1File: RERA LETTER 4_17 OCT 2025_104741.pdf4 Nov 2025
Withdrawal Update Form 1File: RERA LETTER 4_17 OCT 2025_104741.pdf4 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf4 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf4 Nov 2025
Withdrawal Update Form 3File: Form3 (6).pdf4 Nov 2025
Withdrawal Update Form 3File: Form3Sept.pdf4 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf3 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5(2).pdf3 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf18 Sep 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf18 Sep 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf18 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf18 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf18 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf18 Sep 2025
Withdrawal Update Form 3File: Withdrawl Application Form 3.pdf18 Sep 2025
Withdrawal Update Form 3File: Withdrawl Application Form 3.pdf18 Sep 2025
Withdrawal Update Form 3File: Withdrawl Application Form 3.pdf18 Sep 2025
Form 1File: Form 1.pdf11 Sep 2025
Form 2File: FORM 2.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf11 Sep 2025
Form 3File: Form 3 march quarter.pdf11 Sep 2025
Form 129 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1).pdf29 Apr 2025
FORM 229 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf29 Apr 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT OMKAR.pdf30 Dec 2024
Building plan approvalFile: Building plan.pdf24 Dec 2024
Copy of the legal title reportFile: Search Report.pdf24 Dec 2024
Details of encumbrances concerned to FinanceFile: 1- Declaration about Encrumbances to Legal.pdf24 Dec 2024
Details of encumbrances concerned to FinanceFile: 1- Declaration about Encrumbances to Financial.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Building plan.pdf24 Dec 2024
Other - LegalFile: Self Declaration about CERSAI details.pdf24 Dec 2024
Other - LegalFile: correction letter for CS no.pdf24 Dec 2024
Details of encumbrances concerned to LegalFile: 1- Declaration about Encrumbances to Legal.pdf24 Dec 2024
Details of encumbrances concerned to LegalFile: 1- Declaration about Encrumbances to Financial.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAFORM3_REVISED.pdf23 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: correction letter for CS no.pdf26 Nov 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf26 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Self Declaration about Seperate Bank account Format A.pdf26 Nov 2024
Declaration in FORM BFile: Form B affidavit cum declaration.pdf30 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intrest.pdf14 Oct 2024
Details of encumbrances concerned to FinanceFile: 1- Declaration about Encrumbances to Financial.pdf11 Oct 2024
Declaration about Commencement CertificateFile: Gmail - बांधकाम प्रारंभ प्रमाणपत्र.pdf11 Oct 2024
CERSAI detailsFile: Self Declaration about CERSAI details.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: 1- Declaration about Encrumbances to Financial.pdf11 Oct 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf8 Oct 2024
PAN CardFile: Construo Developer - Pan Card.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf8 Oct 2024
Proforma of Allotment letterFile: Letter of Allotment.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENTCERTIFICATE.pdf8 Oct 2024
Other - LegalFile: Partenership Deed.pdf8 Oct 2024
Other - LegalFile: POA.pdf8 Oct 2024
Deviation Report with respect to Allotment letterFile: Self Declaration OF Allotment Letter.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Self Declaration OF Aggrement to sell.pdf8 Oct 2024
Proforma of Agreement for saleFile: Agreement to Sell as per RERA ACT.pdf8 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured unsecured finance availed for the project.pdf8 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Hiranyakeshi Flat type co-op housing societyP53000035111Tarabai park, KolhapurMay 2022Certificate SignedOct 2024Oct 2024

How this compares with Kolhapur

15%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARABAI PARK880+ in Kolhapur

2 kmSBI EMPLOYEES OMKAR CO OCompleted 60Lapsed / revoked 31Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: CONSTRUO DEVELOPER

CONSTRUO DEVELOPER has 1 registration on MahaRERA, including SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY?

The registered promoter entity is CONSTRUO DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY?

The professionals named in the filing: Architect: DHOLE AND ASSOCIATES; Engineer: SAKSHI KEDAR SAMANGADKAR; Chartered Accountant: PRAKASH SHELAKE AND ASSOCIATES; Chartered Accountant: KGB AND J ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SBI EMPLOYEES OMKAR CO OP HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.