Completed No litigation declared Residential / Group Housing project

SAYLEE APARTMENT

By ASHOK SHANKAR BHUJBAL

RG-MH-78210 · RERA P51600046978 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
10 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

SAYLEE APARTMENT is a Residential / Group Housing project by ASHOK SHANKAR BHUJBAL in Nashik, Maharashtra, registered with MahaRERA as P51600046978 on 26 Sep 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 10 of the 20 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAYLEE APARTMENT
  • TypeResidential / Group Housing
  • Location
    • PLOT NO.7+8
    • SURVEY NO. 33/1/2/2/A/2+33/1/2/A/2
    • DASAK SHIVAR NASHIK
    • Nashik Road
    • Nashik
    • 422101
  • Pincode422101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600046978
  • ReraGenie IDRG-MH-78210

Builder

  • NameASHOK SHANKAR BHUJBAL
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2022First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Sep 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed63 files

Current status

50%10 of 20 units booked
100.0%Work done, per cost certificate

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAYLEE APARTMENTNA6520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SAYLEE APARTMENT: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Open Space60

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area565 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
SHOBHATAI SANJAY JAMDASEMumbai CityMumbai City
PRALHAD BARKU KHAIRNARNashik RoadNashik
LAXMIKANT KIRAN KHAROTENashik RoadNashik
KALPANA ARUN WARULKARNashik RoadNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI1806.06
Proposed, not sanctioned1,806 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM G ROAD NASHIK
Estimated costRs 2.77 cr
Cost incurredRs 2.77 cr
Work done100.0%
BuildingWingEstimatedIncurred
SAYLEE APARTMENTNARs 2.77 crRs 2.77 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN BHATTAD
EngineerAMOL DEORE & ASSOCIATES
Chartered AccountantGANESH DEORE & ASSOCIATES
Chartered AccountantNandkumar Yashwantrao Deshmukh
PartnerRole in project
ASHOK SHANKAR BHUJBAL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08012619351Dec 2025 → Jun 2026

Reason as filed by the promoterwe hereby state that, our construction work is not yet completed, hence we request you to kindly extend the proposed date of project completion till 30/06/2026. Our project registration period will be end on 31/12/2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - ENGINEER CERTIFICATE FOR QUALITY ASSURANCE.pdf31 Jul 2026
Occupational CertificateFile: COMPLETION CERTIFICATE mr BHUJBAL.pdf31 Jul 2026
Withdrawal Update Form 1File: Form 1 - Architech Certificate.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf16 Jul 2026
Withdrawal Update Form 3File: FORM 3 CA CERTI.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 - Architech Certificate.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf26 May 2026
Withdrawal Update Form 3File: FORM 3 CA CERTI.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 - Architech Certificate.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf7 May 2026
Withdrawal Update Form 3File: FORM 3 CA CERTI.pdf7 May 2026
Form 1File: Form 1 Architect Certificate.pdf12 Dec 2025
Form 2File: Form 2 Engineer Certificate Q2 .pdf12 Dec 2025
Form 3File: Form 3 CA Certificate FY 2025-26 Q2.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - FY 24-25 Saylee Apt.pdf3 Oct 2025
Form 1File: Form 1.pdf28 Jul 2025
Form 2File: Form 2.pdf28 Jul 2025
Form 3File: Form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf28 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERTI.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTI.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGI CERTI.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Reduce.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sayali architect certificate.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form 5 - FY 2022-23.pdf26 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Letter Head - Engineer Certificate (Saylee Apartment).pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - FY 2023-24 - Q1 - Saylee Apart Reduce.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architects Certificate.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Reduce size Form 2- Engineer Certificate.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Reduce size Form 3.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate.pdf31 Jan 2023
Proforma of Allotment letterFile: Model Draft Agreement for Sale-AFS.pdf23 Aug 2022
Proforma of Allotment letterFile: Proforma Allotment letter.pdf22 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Seperate Bank account.pdf6 Aug 2022
Building plan approvalFile: NA Order Plot No 7 COMP.pdf4 Aug 2022
Layout approvalFile: Layout of Plot.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: Layout of Plot.pdf4 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order Plot No 7 COMP.pdf4 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate comp.pdf4 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Order Plot No 8 COMP.pdf4 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf4 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3- CA Certificate.pdf4 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation to Proforma Allotment.pdf4 Aug 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION OF AFS .pdf4 Aug 2022
Building plan approvalFile: Building Plan.pdf3 Aug 2022
PAN CardFile: Aadhar Pan Ashok Bhujbal.pdf3 Aug 2022
Copy of the legal title reportFile: Title Report-Saylee Apartment1.pdf3 Aug 2022
Details of encumbrances concerned to FinanceFile: self declaration-Financial Encumbrance.pdf3 Aug 2022
Details of encumbrances concerned to LegalFile: Self Declaration- Legal encumbrance.pdf3 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf3 Aug 2022
Declaration about Commencement CertificateFile: Format D- declaration about commencement.pdf3 Aug 2022
Declaration in FORM BFile: Form B- Affidavit.pdf3 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf3 Aug 2022
CERSAI detailsFile: self declaration- CERSAI.pdf3 Aug 2022
Proforma of Allotment letterFile: Agreement Draft- Sayali Apt comp.pdf3 Aug 2022

How this compares with Nashik

50%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 6 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAYLEE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DASAK SHIVAR NASHIK4,100+ in Nashik

2 kmSAYLEE APARTMENTCompleted 27Lapsed / revoked 7Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: ASHOK SHANKAR BHUJBAL

ASHOK SHANKAR BHUJBAL has 1 registration on MahaRERA, including SAYLEE APARTMENT. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SAYLEE APARTMENT is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAYLEE APARTMENT?

The registered promoter entity is ASHOK SHANKAR BHUJBAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAYLEE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAYLEE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAYLEE APARTMENT?

The professionals named in the filing: Architect: SACHIN BHATTAD; Engineer: AMOL DEORE & ASSOCIATES; Chartered Accountant: GANESH DEORE & ASSOCIATES; Chartered Accountant: Nandkumar Yashwantrao Deshmukh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAYLEE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAYLEE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAYLEE APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.