Home / Browse projects / Mumbai Suburban, Maharashtra / SAYBA ROYAL

Registered No litigation declared Residential / Group Housing project

SAYBA ROYAL

By M/S. STAR RISE

RG-MH-23375 · RERA P51800078687 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
96 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SAYBA ROYAL is a Residential / Group Housing project by M/S. STAR RISE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078687 on 7 Jan 2025. Possession is promised by 31 Dec 2026. 56 of the 152 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAYBA ROYAL
  • TypeResidential / Group Housing
  • Location
    • NEHRU NAGAR
    • KURLA (EAST)
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078687
  • ReraGenie IDRG-MH-23375

Builder

  • NameM/S. STAR RISE
  • Entity typePartnership
  • PartnersNaushad Ali Habib Ali Hashmi, Ismail Yakub Payak
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jan 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Current status

37%56 of 152 units booked
31.8%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAYBA ROYAL A WINGNA212070676
SAYBA ROYAL B WINGNA212075176

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

SAYBA ROYAL A WING58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SAYBA ROYAL B WING58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered59
BuildingClosed/CoveredTotal
SAYBA ROYAL A WING2525
SAYBA ROYAL B WING3434

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,194 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2025
LandownerVillageDistrict
Nehru Nagar Satyam CHSLKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY
Permissible FSI10450.12
Proposed, not sanctioned9,775 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIST FLOOR, GOL BUILDING, OPP. HOMI BHABHA HOS
Estimated costRs 42.00 cr
Cost incurredRs 13.37 cr
Work done31.84%
BuildingWingEstimatedIncurred
SAYBA ROYAL A WINGNARs 21.00 crRs 6.69 cr
SAYBA ROYAL B WINGNARs 21.00 crRs 6.69 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEllora Project Consultants Pvt Ltd
EngineerAssociated Structural Engineers LLP
EngineerHabib Ansari
Chartered AccountantS K D J & CO
Chartered AccountantKapil Gupta
Chartered AccountantFaheem Akhter Ansari
PartnerRole in project
M/S. STAR RISE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sayba Royal March 2026.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 Sayba Royal March 2026.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 Sayba Royal March 2026.pdf29 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Sayba Royal 2025-2026.pdf18 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Sayba Royal 2024-2025.pdf28 Mar 2026
Withdrawal Update Form 1File: Form 1 Sayba Royal Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Sayba Royal Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 Sayba Royal Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 Sayba Royal Sept 25.pdf5 Nov 2025
Withdrawal Update Form 2File: Form 2 Sayba Royal Sept 25.pdf5 Nov 2025
Withdrawal Update Form 3File: Form 3 Sayba Royal Sept 25.pdf5 Nov 2025
Withdrawal Update Form 1File: Form 1 Sayba Royal June 25.pdf27 Sep 2025
Withdrawal Update Form 2File: Form 2 Sayba Royal June 2025.pdf27 Sep 2025
Withdrawal Update Form 3File: Form 3 Sayba Royal June 25.PDF27 Sep 2025
Form 1File: Form 1 Sayba Royal June 25.pdf15 Sep 2025
Form 2File: Form 2 Sayba Royal June 2025.pdf15 Sep 2025
Form 3File: Form 3 Sayba Royal June 25.PDF15 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Inventory Sayba Royal June 25.pdf15 Sep 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Sayba Royal June 2025.pdf15 Sep 2025
Form 1File: Form 1 Sayba Royal Q4.pdf25 Jun 2025
Form 2File: Form 2 Sayba Royal March 2025.pdf25 Jun 2025
Form 3File: Form 3 Sayba Royal March 2024.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Sayba Royal March 2025.pdf25 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Sayba Royal March 2025.pdf25 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A Sayba Royal March 2024-25.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Royal.pdf19 Apr 2025
Details of encumbrances concerned to FinanceFile: declaration of encumbrances Royal.pdf2 Jan 2025
Details of encumbrances concerned to LegalFile: declaration of encumbrances Royal.pdf2 Jan 2025
Other - FinanceFile: ARCHITECT CERTIFICATE.pdf2 Jan 2025
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf31 Dec 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf31 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-9.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-8.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-7.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-6.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-5.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-4.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-3.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34-2.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-7.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-2.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-3.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-4.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-5.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-6.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-8.pdf23 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34-9.pdf23 Dec 2024
Building plan approvalFile: IOA Plan Bldg no 34 HIGHLIGHTED.pdf21 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA Plan Bldg no 34 HIGHLIGHTED.pdf21 Dec 2024
Other - TechnicalFile: Declaration Promoter.pdf19 Dec 2024
Other - TechnicalFile: Annexure A Declaration Cum Undertaking.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Mail - B P Cell MHADA - Outlook_34.pdf18 Dec 2024
Other - TechnicalFile: annexure A.pdf29 Nov 2024
Proforma of Agreement for saleFile: Agreement For Sale ROYAL.pdf29 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest in Other Real Estate Orqanizations2.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA SAYBA ROYAL.pdf28 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Bldg No 34.pdf28 Nov 2024
PAN CardFile: Star Rise Pan Card DONE.pdf27 Nov 2024
Copy of the legal title reportFile: Bldg No 34 Legal Title Report-DONE.pdf27 Nov 2024
Details of encumbrances concerned to FinanceFile: Declaration of Financial Encumbraces.pdf27 Nov 2024
Details of encumbrances concerned to FinanceFile: Bldg No 34 Legal Encumbrances-DONE.pdf27 Nov 2024
Proforma of Allotment letterFile: Proforma Allotment letter.pdf27 Nov 2024
Declaration in FORM BFile: PROMOTER FORM B (2).pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg No 34 Architect 's Certificate-DONE.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bldg No 34 Engineer 's Certificates-DONE.pdf27 Nov 2024
Declaration about Commencement CertificateFile: Bldg No 34 Commencement Certificate-DONE.pdf27 Nov 2024
CERSAI detailsFile: CERSAI DETAILS SAYBA ROYAL.pdf27 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Declaration about RERA Designated Bank Accounts for Real Estate Projects.pdf27 Nov 2024
Deviation Report with respect to Allotment letterFile: No deviation for Allotment 34.pdf27 Nov 2024
Details of encumbrances concerned to LegalFile: Bldg No 34 Legal Encumbrances-DONE.pdf27 Nov 2024
Details of encumbrances concerned to LegalFile: Declaration of Financial Encumbraces.pdf27 Nov 2024
Deviation Report with respect to model copy of AgreementFile: AGREEMENT DEVIATION REPORT-UPLOAD.pdf27 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest in Other Real Estate Orqanization1.pdf27 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank FORMAT B Sayba Royal.pdf27 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the Project.pdf27 Nov 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAYBA ORCHIDP51800054279KURLA (EAST), Mumbai Suburban130Jan 2024OngoingDec 2026Not due yet
SAYBA RESIDENCYBUILDING NO 89-90 NEHRU NAGAR KURLA EAST MUMBAI-24302-CompletedDec 2023Apr 2023

How this compares with Mumbai Suburban

37%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAYBA ROYAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA (EAST)6,700+ in Mumbai Suburban

2 kmSAYBA ROYALCompleted 120Lapsed / revoked 117Other 146Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: M/S. STAR RISE

M/S. STAR RISE has 1 registration on MahaRERA, including SAYBA ROYAL. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAYBA ROYAL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAYBA ROYAL?

The registered promoter entity is M/S. STAR RISE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAYBA ROYAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAYBA ROYAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAYBA ROYAL?

The professionals named in the filing: Architect: Ellora Project Consultants Pvt Ltd; Engineer: Associated Structural Engineers LLP; Engineer: Habib Ansari; Chartered Accountant: S K D J & CO; Chartered Accountant: Kapil Gupta; Chartered Accountant: Faheem Akhter Ansari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAYBA ROYAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAYBA ROYAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAYBA ROYAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.