Home / Browse projects / Sangli, Maharashtra / SAVVASHE RESIDENCY

Completed No litigation declared Others project

SAVVASHE RESIDENCY

By YOGESH SUNIL SAVVASHE

RG-MH-21400 · RERA P53100029234 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Installation of Lifts, 50%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

SAVVASHE RESIDENCY is a Others project by YOGESH SUNIL SAVVASHE in Sangli, Maharashtra, registered with MahaRERA as P53100029234 on 10 May 2021. The registration is recorded completed; possession was promised by 31 Mar 2023.

At a glance

Project

  • NameSAVVASHE RESIDENCY
  • TypeOthers
  • Location
    • 375 PETHBHAG
    • NEAR KARNAL CHOWK
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • RERA no.P53100029234
  • ReraGenie IDRG-MH-21400

Builder

  • NameYOGESH SUNIL SAVVASHE
  • Entity typeIndividual

Key dates

this monthRegisteredMay 2021PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2021
  • Promised completion31 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAVVASHE RESIDENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

SAVVASHE RESIDENCY: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area178 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
YOGESH SUNIL SAVVASHESangli Miraj Kupwad (M Corp.)Sangli
ANIL VASANT SAVVASHESangli Miraj Kupwad (M Corp.)Sangli
SUNIL VASANT SAVVASHESangli Miraj Kupwad (M Corp.)Sangli
DEEPAK VASANT SAVVASHESangli Miraj Kupwad (M Corp.)Sangli
VINAYAK VASANT SAVVASHESangli Miraj Kupwad (M Corp.)Sangli
SIMANTINI SUNIL SHINDEKolhapur (M Corp.)Kolhapur

Approvals and building plan

Permissible FSI352.87
Proposed, not sanctioned353 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHRAMBAG SANGLI

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
YOGESH SUNIL SAVVASHE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Dec 2024

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_form_1[1].pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1[1].pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1[2].pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1[1].pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1[1].pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form_1[1].pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[2].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3[1].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form_2[1].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form_2[1].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form_2[2].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form_2[1].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form_2[1].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_form_2[1].pdf3 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form_2[1].pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A 22-23.pdf3 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf2 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf2 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Savvashe Residency Complition.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold units.pdf2 Dec 2024
Deviation Report with respect to Allotment letterFile: deviation report allotment letter.pdf2 Dec 2024
Foreclosure of the ProjectFile: diclaration of complition.pdf2 Dec 2024
Deviation Report with respect to model copy of AgreementFile: deviation report agreement to sale.pdf2 Dec 2024
Deviation Report with respect to model copy of AgreementFile: deviation report agreement to sale.pdf2 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of intrest in other projects.pdf2 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf2 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Acc statment SUB Rera.pdf24 Apr 2023
CERSAI detailsFile: cersai certificate sawashe residency compressed.pdf13 Apr 2023
Proforma of Agreement for saleFile: Savvashe Residency Agreement of Sale .pdf13 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumberance Certificate.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Encumberance Certificate.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 19-20.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 20-21.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 21-22.pdf16 Feb 2023
Disclosure of sold/ booked inventoryFile: sold booked inventory details.pdf8 Mar 2022
Declaration about Commencement CertificateFile: permission.pdf21 Dec 2021
Proforma of Allotment letterFile: flat performa.pdf4 Sep 2021
Copy of the legal title reportFile: Leagle Report form A.pdf29 Apr 2021
Building plan approvalFile: Savvashe Recidency Bandhkam parwana plan.pdf23 Apr 2021
Layout approvalFile: Amalgamation Muncipal Drowing 375.pdf23 Apr 2021
PAN CardFile: pan.pdf23 Apr 2021
Details of encumbrancesFile: Encumberance Certificate.pdf23 Apr 2021
Copy of Layout Approval (in case of layout)File: Amalgamation Muncipal Drowing 375.pdf23 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Savvashe Recidency Bandhkam parwana plan.pdf23 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Savvashe Recidency Bandhkam parwana.pdf23 Apr 2021
Declaration in FORM BFile: Savvashe Residency Form B_compressed.pdf23 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Savvashe Residency Form 1_compressed.pdf23 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Savvashe Residency Form 2.pdf23 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost.pdf23 Apr 2021
Proforma of Allotment letterFile: Allotment letter.pdf23 Apr 2021

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SAVVASHE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KARNAL CHOWK790+ in Sangli

Builder: YOGESH SUNIL SAVVASHE

YOGESH SUNIL SAVVASHE has 1 registration on MahaRERA, including SAVVASHE RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SAVVASHE RESIDENCY is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAVVASHE RESIDENCY?

The registered promoter entity is YOGESH SUNIL SAVVASHE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAVVASHE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAVVASHE RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SAVVASHE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAVVASHE RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAVVASHE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.