Home / Browse projects / Thane, Maharashtra / SAVA ARCADE

Registered No litigation declared Others project

SAVA ARCADE

By SAVA DEVELOPERS

RG-MH-19291 · RERA P51700078381 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 7 months from the original
5 of 11Construction stages donefurthest along: Staircases, 30%
38 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

SAVA ARCADE is a Others project by SAVA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700078381 on 10 Dec 2024. Possession is promised by 31 Oct 2026. The completion date has moved by 7 months from the original filing. 14 of the 52 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAVA ARCADE
  • TypeOthers
  • Location
    • S.No.108/1/b/2
    • Opp.Asangaon Railway Station
    • At Post Asangaon
    • Asangaon (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078381
  • ReraGenie IDRG-MH-19291

Builder

  • NameSAVA DEVELOPERS
  • Entity typePartnership

Key dates

this monthRegisteredDec 2024First promiseMar 2026Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Dec 2024
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed45 files

Current status

27%14 of 52 units booked
81.8%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A and B WingNA8648452

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 30%.

A and B Wing: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered31
Open Space54

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area898 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Apr 2026
LandownerVillageDistrict
Shri Krushna Darshan Co-Op. Housing SocietyAsangaon (CT)Thane

Approvals and building plan

Sanctioning authorityCollector Office Thane
Permissible FSI2001.71
Proposed, not sanctioned2,002 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD.,SH NO. 9,10,11 and 12 SHRI NARAYAN CHS,VILLAG E KALAMBE, ASANGAON-SHAHAPUR RD,TAL-SHAHAPUR THANE MAHARASHTRA 421 601
Estimated costRs 5.41 cr
Cost incurredRs 4.43 cr
Work done81.82%
BuildingWingEstimatedIncurred
A and B WingNARs 4.92 crRs 4.18 cr
-NARs 49.20 lakhRs 24.60 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSurendra Dattatray Bhoir
EngineerKalpesh Prakash Sapale
Chartered AccountantShah Vora Tiwari Associates
PartnerRole in project
SAVA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28052621144Mar 2026 → Oct 2026

Reason as filed by the promoterDear Sir “The project execution was delayed due to shortage and delayed supply of construction materials including tiles and finishing materials arising from market supply-chain disruptions and fuel/gas availability issues. Further, shortage of skilled labour and contractor workforce during the construction period adversely affected the pace of execution of the project. In addition, escalation in construction material costs and delays in procurement of certain materials impacted timely completion of the project. The promoter is actively undertaking the balance work and seeks extension of the p

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Sava 2A FY 24-25.pdf16 Jun 2026
Form 2A (FY 2025-2026)File: Sava 2A FY 25-26.pdf16 Jun 2026
Form 5 (FY 2024-2025)File: Sava Form 5 FY24-25.pdf16 Jun 2026
Form 5 (FY 2025-2026)File: Sava Form 5 FY25-26.pdf16 Jun 2026
Withdrawal Update Form 1File: Sava Developers Form 1 June 2025.pdf28 May 2026
Withdrawal Update Form 1File: Sava Developers Form 1 September 2025.pdf28 May 2026
Withdrawal Update Form 1File: Sava Developers Form 1 December 2025.pdf28 May 2026
Withdrawal Update Form 1File: Sava Developers Form 1 March 2026.pdf28 May 2026
Withdrawal Update Form 2File: Sava Developers Form 2 June 2025.pdf28 May 2026
Withdrawal Update Form 2File: Sava Developers Form 2 September 2025.pdf28 May 2026
Withdrawal Update Form 2File: Sava Developers Form 2 December 2025.pdf28 May 2026
Withdrawal Update Form 2File: Sava Developers Form 2 March 2026.pdf28 May 2026
Withdrawal Update Form 3File: 1 Form-3 - Q-1 FY 2025-26.pdf28 May 2026
Withdrawal Update Form 3File: 2 Form-3 - Q-2 FY 2025-26.pdf28 May 2026
Withdrawal Update Form 3File: 3 Form-3 - Q-3 FY 2025-26.pdf28 May 2026
Withdrawal Update Form 3File: 4 Form-3 - Q-4 FY 2025-26.pdf28 May 2026
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Declaration Sava New.pdf28 Nov 2024
Proforma of Allotment letterFile: Model Allotment Letter New Updated Sava.pdf21 Nov 2024
Declaration about Commencement CertificateFile: Commencement Certificate Declaration Sava New.pdf21 Nov 2024
Other - FinanceFile: Form 3 Declaration Sava.pdf21 Nov 2024
Proforma of Agreement for saleFile: Model Agreement for Sale New Updated Sava.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Updated.pdf5 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of secured unsecured finance availed Updated.pdf5 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Legal.pdf31 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances Legal.pdf31 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Finance.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances Finance.pdf22 Oct 2024
Building plan approvalFile: TP Order Sava.pdf14 Oct 2024
Layout approvalFile: Plan Scan 1 Sava-compressed.pdf14 Oct 2024
PAN CardFile: PAN Card Sava.pdf14 Oct 2024
Copy of the legal title reportFile: Legal Title Report.pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: Plan Scan 1 Sava-compressed.pdf14 Oct 2024
Declaration in FORM BFile: Form B Developer.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order Sava.pdf14 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: TP Order Sava.pdf14 Oct 2024
Other - LegalFile: Partnership Deed Sava.pdf14 Oct 2024
CERSAI detailsFile: CERSAI Declaration.pdf14 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Seperate Bank account declaration Developer.pdf14 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf14 Oct 2024
Other - TechnicalFile: New Declaration.pdf14 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for Sale.pdf14 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in OREO Vivek More.pdf14 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Internet in OREO Sharique Shaikh.pdf14 Oct 2024

How this compares with Thane

27%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 7 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAVA ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near At Post Asangaon7,600+ in Thane

2 kmSAVA ARCADECompleted 9Lapsed / revoked 8Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: SAVA DEVELOPERS

SAVA DEVELOPERS has 1 registration on MahaRERA, including SAVA ARCADE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAVA ARCADE is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAVA ARCADE?

The registered promoter entity is SAVA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAVA ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAVA ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAVA ARCADE?

The professionals named in the filing: Architect: Surendra Dattatray Bhoir; Engineer: Kalpesh Prakash Sapale; Chartered Accountant: Shah Vora Tiwari Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAVA ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAVA ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAVA ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.