Home / Browse projects / Nagpur, Maharashtra / SATYAM LILLY
SATYAM LILLY
RG-MH-63060 · RERA P50500056135 · Last updated on MahaRERA portal: 25 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SATYAM LILLY is a Residential / Group Housing project by SATYAM INFRAVENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500056135 on 16 May 2024. Possession is promised by 31 Dec 2027.
At a glance
Project
- NameSATYAM LILLY
- TypeResidential / Group Housing
- Location
- MOUJA- GODHANI (RAILWAY)
- Godhani (Railway)
- Nagpur (Rural)
- Nagpur
- 441123
- Pincode441123
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500056135
- ReraGenie IDRG-MH-63060
Builder
- NameSATYAM INFRAVENTURES
- Entity typePartnership
- PartnersVISHNUGOPAL GANESHLAL SHAHU, RITURAJ VISHNUGOPAL SHAHU
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SATYAM LILLY | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
SATYAM LILLY: 51% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 18% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed103
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LOKESH KADU |
| Engineer | JAYPRAKASH V GANDHI |
| Chartered Accountant | NITYAPRAKASH LANJEWAR |
| Chartered Accountant | CA. RAKESH DASWANI |
| Partner | Role in project |
|---|---|
| SATYAM INFRAVENTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Mar 2026 Om satyam Infraventures.pdf | 25 May 2026 |
| Form 2File: Form 2 Mar 2026 Om satyam Infraventures.pdf | 25 May 2026 |
| Form 3File: Form 3CA Mar 2026 Om satyam Infraventure.pdf | 25 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Mar 2026 Om satyam Infraventures.pdf | 25 May 2026 |
| Form 1File: SL Form 1 Dec 2025.pdf | 21 Jan 2026 |
| Form 2File: SL Form 2 Dec 2025.pdf | 21 Jan 2026 |
| Form 3File: SL Form 3 Dec 2025.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SL Disclosure Dec 2025.pdf | 21 Jan 2026 |
| Form 1File: Form 1 Sep 2025.pdf | 12 Nov 2025 |
| Form 2File: Form 2 Sep 2025.pdf | 12 Nov 2025 |
| Form 3File: Form 3 Sep 2025.pdf | 12 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sep 2025.pdf | 12 Nov 2025 |
| Form 1File: Form 1 June 2024.pdf | 19 Sep 2025 |
| Form 2File: Form 2 June 2024.pdf | 19 Sep 2025 |
| Form 3File: Form 3CA June 2024.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Booked Inventory June 2024.pdf | 19 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Mar 2025.pdf | 19 Sep 2025 |
| Form 2A (FY 2025-2026)File: Form 2A Mar 2026.pdf | 19 Sep 2025 |
| Form 5 (FY 2024-2025)File: Satyam Lilly Form 5 Mar 2025.pdf | 19 Aug 2025 |
| Form 1File: Satyam lilly Form 1 Architech Jun 2025.pdf | 18 Aug 2025 |
| Form 2File: Satyam lilly Form 2 Engineer Jun 2025.pdf | 18 Aug 2025 |
| Form 3File: Satyam lilly Form 3 CA Jun 2025.pdf | 18 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory Jun 2025.pdf | 18 Aug 2025 |
| Form 1File: FORM 1 SEPT 24 SIGN.pdf | 26 Jul 2025 |
| Form 2File: FORM 2 SEPT 24 SIGN.pdf | 26 Jul 2025 |
| Form 3File: Form-3CA Sep 24 Final.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory( 9-24 Final).pdf | 26 Jul 2025 |
| Form 1File: Satyam lilly Form 1 Architech DEC 2024.pdf | 26 Jul 2025 |
| Form 2File: Satyam lilly Form 2 Engineer DEC 2024.pdf | 26 Jul 2025 |
| Form 3File: Satyam lilly Form 3 CA DEC 2024.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory (12-24 Final).pdf | 26 Jul 2025 |
| Form 1File: Satyam lilly Form 1 Architech Mar 2025.pdf | 26 Jul 2025 |
| Form 2File: Satyam lilly Form 2 Engineer Mar 2025.pdf | 26 Jul 2025 |
| Form 3File: Satyam lilly Form 3CA Mar 2025.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory (03-25 Final).pdf | 26 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Satyam lilly Form 1 Architech Mar 2025.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Satyam lilly Form 2 Engineer Mar 2025.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Satyam lilly Form 3CA Mar 2025.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Satyam lilly Form 1 Architech DEC 2024.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Satyam lilly Form 3 CA DEC 2024.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Satyam lilly Form 2 Engineer DEC 2024.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 24 LIIIY.pdf | 28 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3CA Sep 24 Final.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 24 SATYAM INFRAVENTURE.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 14 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Palvinder.pdf | 7 May 2024 |
| Other - LegalFile: Sale Deed.pdf | 6 May 2024 |
| Copy of the legal title reportFile: Legal Title Report_compressed.pdf | 4 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 4 May 2024 |
| Declaration about Commencement CertificateFile: Form D.pdf | 4 May 2024 |
| Other - LegalFile: Partnership Deed Satyam Infraventure.pdf | 4 May 2024 |
| Other - TechnicalFile: Declaration cum undertaking.pdf | 4 May 2024 |
| Other - TechnicalFile: MAP.pdf | 4 May 2024 |
| Other - TechnicalFile: CC Verification.pdf | 4 May 2024 |
| Details of encumbrances concerned to FinanceFile: No finance and legal encumbrance.pdf | 12 Apr 2024 |
| Details of encumbrances concerned to LegalFile: No finance and legal encumbrance.pdf | 12 Apr 2024 |
| Declaration in FORM BFile: Form B.pdf | 12 Apr 2024 |
| CERSAI detailsFile: Cersai Report.pdf | 12 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 12 Apr 2024 |
| Proforma of Allotment letterFile: Model form of Allotment letter.pdf | 12 Apr 2024 |
| Proforma of Agreement for saleFile: Model form of Agreement to sale.pdf | 12 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Details.pdf | 12 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment letter.pdf | 12 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report of Agreement for sale.pdf | 12 Apr 2024 |
| Layout approvalFile: MAP-1.pdf | 9 Apr 2024 |
| Layout approvalFile: MAP-2.pdf | 9 Apr 2024 |
| Layout approvalFile: MAP-3.pdf | 9 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: MAP-1.pdf | 9 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: MAP-2.pdf | 9 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: MAP-3.pdf | 9 Apr 2024 |
| Building plan approvalFile: NA ORDER.pdf | 28 Mar 2024 |
| PAN CardFile: Satyam Infraventures PAN.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf | 28 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SATYAM LILLY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUJA- GODHANI (RAILWAY)2,800+ in Nagpur
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
OM ANANT APARTMENT
INFINITI INFRAVENTURES
Shree Krishna Vihar - Phase I
Sai Associates
OM AMOGH
Trulake Industries Private Limited
OM SAI METRO PARK
SHRIRAM HARISHCHANDRA GUPTA
V R Colony
Sandhya Sureshrao Shrikhande / Giridhari S
SHREE ANAND SAGAR
CHANDRASHEKHAR BABURAO KALE
See every Nagpur project, with the district possession charts
Builder: SATYAM INFRAVENTURES
SATYAM INFRAVENTURES has 1 registration on MahaRERA, including SATYAM LILLY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SATYAM LILLY is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SATYAM LILLY?
The registered promoter entity is SATYAM INFRAVENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SATYAM LILLY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SATYAM LILLY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SATYAM LILLY?
The professionals named in the filing: Architect: LOKESH KADU; Engineer: JAYPRAKASH V GANDHI; Chartered Accountant: NITYAPRAKASH LANJEWAR; Chartered Accountant: CA. RAKESH DASWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SATYAM LILLY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback