OM ANANT APARTMENT
RG-MH-57161 · RERA P50500052796 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OM ANANT APARTMENT is a Residential / Group Housing project by INFINITI INFRAVENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500052796 on 5 Oct 2023. Possession is promised by 31 Dec 2026. 39 of the 45 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameOM ANANT APARTMENT
- TypeResidential / Group Housing
- Location
- GODHANI BOKHARA ROAD
- GODHANI RAILWAY
- Godhani (Railway)
- Nagpur (Rural)
- Nagpur
- 441123
- Pincode441123
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500052796
- ReraGenie IDRG-MH-57161
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed110 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OM ANANT APARTMENT - MULTY FAMILY RES BLDG PLAN ON PLOT NO 10 KH NO 378/A PART 378/B PART | NA | 8 | 8 | 45 | 0 | 45 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
OM ANANT APARTMENT - MULTY FAMILY RES BLDG PLAN ON PLOT NO 10 KH NO 378/A PART 378/B PART: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed67
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| OM ANANT APARTMENT - MULTY FAMILY RES BLDG PLAN ON PLOT NO 10 KH NO 378/A PART 378/B PART | NA | Rs 9.60 cr | Rs 7.81 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CHANDRASHEKHAR GIRIPUNJE |
| Engineer | Sunil Kothalkar |
| Chartered Accountant | Manish N Jain & Co |
| Chartered Accountant | Apj & Associates |
| Partner | Role in project |
|---|---|
| INFINITI INFRAVENTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 OM Anant March 26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: FORM - 2 Anant March 26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: FORM-3 Anant March 26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 31-12-2025.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 31-12-2025.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: FORM-3 31-12-2025.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: FORM-1 Anant 30-09-25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: FORM-2 Anant 30-09-25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: FORM-3 Anant 30-9-25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: FORM-1 Anant 30-09-25.pdf | 12 Nov 2025 |
| Withdrawal Update Form 1File: FORM-3 June2025 Anant.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: FORM-2 Anant 30-09-25.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: FORM - 2 June2025 Anant.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: FORM-3 Anant 30-9-25.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: FORM-3 June2025 Anant.pdf | 12 Nov 2025 |
| Form 1File: Form 1- 31-03-25_1.pdf | 17 Jun 2025 |
| Form 2File: Form 2 - 31-03-25_1.pdf | 17 Jun 2025 |
| Form 3File: Form-3 Sign 31-03-2025_1_compressed.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold inventory 31-03-2025_1.pdf | 17 Jun 2025 |
| Form 1File: Form 1 31-12-2023.pdf | 16 Jun 2025 |
| Form 2File: Form 2 31-12-2023.pdf | 16 Jun 2025 |
| Form 3File: CA certificate infiniti.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 11 annexure 29 infinit 31-12-2023i.pdf | 16 Jun 2025 |
| Form 1File: Form 1 31-03-2024.pdf | 16 Jun 2025 |
| Form 2File: FORM 2 1st 2024.pdf | 16 Jun 2025 |
| Form 3File: Form 3 31-03-2024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 11_Annexure 29 31-03-2024.pdf | 16 Jun 2025 |
| Form 1File: Form 1 june 2024.pdf | 16 Jun 2025 |
| Form 2File: Form 2 june 2024.pdf | 16 Jun 2025 |
| Form 3File: Form 3 june 2024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure 29.pdf | 16 Jun 2025 |
| Form 1File: 1_Form 1 30-09-2024.pdf | 16 Jun 2025 |
| Form 2File: Form 2 September 2024.pdf | 16 Jun 2025 |
| Form 3File: FORM 3 september 2024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold september 24.pdf | 16 Jun 2025 |
| Form 1File: FORM-1 dec 24.pdf | 16 Jun 2025 |
| Form 2File: FORM-2 dec 24.pdf | 16 Jun 2025 |
| Form 3File: sign FROM 3 dec -24.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unslod dec 24.pdf | 16 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 dec 24.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sign FROM 3 dec -24.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 dec 24.pdf | 10 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold unslod dec 24.pdf | 10 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 30-09-2024.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 september 2024.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September 2024.pdf | 23 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold september 24.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 june 2024.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 june 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Annexure 29.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 june 2024.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 june 2024.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 june 2024.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 june 2024.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Annexure 29.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 final.pdf | 8 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 2023 December Quarter.pdf | 6 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024 1st.pdf | 6 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 2023 4th.pdf | 6 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 1st 2024.pdf | 6 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 11 annexure 29 2023 Dec Quarter .pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: annexure.pdf | 6 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 2023 Dec Quarter - Copy.pdf | 6 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1st 2024 - Copy.pdf | 6 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate infiniti.pdf | 11 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 11 Mar 2024 |
| Other - FinanceFile: Affidavti cum underatking.pdf | 11 Mar 2024 |
| Other - FinanceFile: Self declaration for bank change.pdf | 11 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Corrected form 2.pdf | 1 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate infiniti.pdf | 1 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1.pdf | 29 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 infiniti.pdf | 29 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 11 annexure 29 infiniti.pdf | 29 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 infiniti 2.pdf | 29 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declration.pdf | 3 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200281206603_For_Asset_Based_Search_22_09_2023_13_54_25_809.pdf | 22 Sep 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200281206660_For_Asset_Based_Search_22_09_2023_13_54_47_993.pdf | 22 Sep 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200281206742_For_Asset_Based_Search_22_09_2023_13_55_22_289.pdf | 22 Sep 2023 |
| Other - TechnicalFile: Gmail - Please find herewith attached Commencement Certificate for Tracking ID 2023092011. | 21 Sep 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| OM ARNESH APARTMENTP50500032036 | ZINGABAI TAKLI NAGPUR, Nagpur | - | Dec 2021 | Completed | Dec 2024 | Jul 2023 |
| Om Aaradhya Apartment | Plot no 3D KH No 141 Godhni Rly Nagpur | 11 | - | Completed | Jul 2018 | Late, Aug 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OM ANANT APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GODHANI RAILWAY2,800+ in Nagpur
Filed coordinates, straight-line distance. 56 registered projects within 2 km.
Shree Krishna Vihar - Phase I
Sai Associates
OM AMOGH
Trulake Industries Private Limited
OM SAI METRO PARK
SHRIRAM HARISHCHANDRA GUPTA
V R Colony
Sandhya Sureshrao Shrikhande / Giridhari S
SHREE ANAND SAGAR
CHANDRASHEKHAR BABURAO KALE
ANUSAYA ASHIRWAAD
VINOD DAMODHAR DEVGHARE
See every Nagpur project, with the district possession charts
Builder: INFINITI INFRAVENTURES
INFINITI INFRAVENTURES has 5 registrations on MahaRERA, including OM AARADHYA APARTMENT and Om Amitesh Apartment. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if OM ANANT APARTMENT is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OM ANANT APARTMENT?
The registered promoter entity is INFINITI INFRAVENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OM ANANT APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OM ANANT APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OM ANANT APARTMENT?
The professionals named in the filing: Architect: CHANDRASHEKHAR GIRIPUNJE; Engineer: Sunil Kothalkar; Chartered Accountant: Manish N Jain & Co; Chartered Accountant: Apj & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OM ANANT APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback