Home / Browse projects / Satara, Maharashtra / SATYAJEET VILLA
SATYAJEET VILLA
RG-MH-12896 · RERA P52700023480 · Last updated on MahaRERA portal: 20 Apr 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 25 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SATYAJEET VILLA is a Residential / Group Housing project by SATYAJEET VILLA in Satara, Maharashtra, registered with MahaRERA as P52700023480 on 18 Dec 2019. The registration is recorded completed; possession was promised by 24 Jan 2025. The completion date has moved by 25 months from the original filing.
At a glance
Project
- NameSATYAJEET VILLA
- TypeResidential / Group Housing
- Location
- Pune - Bangalore Highway
- Karad
- Gote
- Satara
- 415124
- Pincode415124
- RERA no.P52700023480
- ReraGenie IDRG-MH-12896
Builder
- NameSATYAJEET VILLA
- Entity typePartnership
- PartnersBALASAHEB KASHINATH PATIL, NAMDEV KASHINATH PATIL, MUKUND KASHINATH PATIL, SHAILA BALASAHEB PATIL, SUNANDA NAMDEV PATIL, SUJATA MUKUND PATIL, NAYAN BALASAHEB PATIL, NOBAL BALASAHEB PATIL, SNEHAL NAMDEV PATIL, SATYAJEET NAMDEV PATIL
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Dec 2019
- Promised completion24 Jan 2025
- Revised completionRevised to 24 Jan 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SATYAJEET VILLA | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
SATYAJEET VILLA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed215
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SIDDHIRAJ DESAI |
| Engineer | SUKHADEV R MORE |
| Chartered Accountant | YOGESH R RELEKAR |
| Partner | Role in project |
|---|---|
| SATYAJEET VILLA | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur Construction work in process and we have completed 80 to 85 % plus work as on date. Also process to obtain Occupancy Certificate form competent authority is time consuming. We will be very much thankful to you if you will kindly accord us extension for completing the project date as 30/12/2024
Reason as filed by the promoterCOVID Pandemic and it's adverse economic effect on booking of apartment in project
Reason as filed by the promoterPOST FACTO. ALL QUERIES ARE ALREADY COMPLIED. PLUS EVEN IF IT IS WRITTEN ON OC THAT IT IS PART OC PLEASE GO THROUGH OUR DECLARATION
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Feb 2025
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Satyajeet Vila Form B.pdf | 20 Apr 2025 |
| Building plan approvalFile: 1.pdf | 24 Feb 2025 |
| Building plan approvalFile: 2.pdf | 24 Feb 2025 |
| Building plan approvalFile: 3.pdf | 24 Feb 2025 |
| Building plan approvalFile: 16.pdf | 24 Feb 2025 |
| Building plan approvalFile: 17.pdf | 24 Feb 2025 |
| Building Plan Approval (IOD)File: 1.pdf | 24 Feb 2025 |
| Building Plan Approval (IOD)File: 2.pdf | 24 Feb 2025 |
| Building Plan Approval (IOD)File: 3.pdf | 24 Feb 2025 |
| Building Plan Approval (IOD)File: 16.pdf | 24 Feb 2025 |
| Building Plan Approval (IOD)File: 17.pdf | 24 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Declaration Regarding OC Certificate.pdf | 24 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: revised cc_compressed.pdf | 17 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 28 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: frorm-3.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2.pdf | 28 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2a.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form-5.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 .pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 .pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 .pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 20 Jan 2024 |
| Declaration in FORM BFile: FORM B SCANNED_11zon.pdf | 16 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DECLARATION.pdf | 16 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 fINAL.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory.pdf | 4 Feb 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 4 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organization.pdf | 4 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Separate Bank Account.pdf | 4 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation to Allotment letter.pdf | 4 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to agreement For Sale.pdf | 4 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 20-21.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 21-22.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 22-23.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 19-20.pdf | 3 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 19-20.pdf | 3 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 20-21.pdf | 3 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 21-22.pdf | 3 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 22-23.pdf | 3 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 20-21.pdf | 3 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 3 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 3 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 3 Feb 2023 |
| CERSAI detailsFile: Form 2A 21-22.pdf | 3 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 3 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Form 1 22-23.pdf | 3 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 3 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 3 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 3 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form 1 19-20.pdf | 3 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Form 1 19-20.pdf | 3 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Form 1 19-20.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Revised.pdf | 17 Dec 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Revised.pdf | 17 Dec 2019 |
| OtherFile: Credai Certificate.pdf | 17 Dec 2019 |
| Details of encumbrancesFile: Encumberssment Certificate.pdf | 6 Nov 2019 |
| Declaration in FORM BFile: Form B.pdf | 6 Nov 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From No-3.pdf | 6 Nov 2019 |
| Status of ConveyanceFile: Encumberssment Certificate.pdf | 6 Nov 2019 |
| PAN CardFile: Satyajeet villa Pan Card ok.pdf | 5 Nov 2019 |
| OtherFile: land purchase document 1.pdf | 5 Nov 2019 |
| OtherFile: land purchase document 2.pdf | 5 Nov 2019 |
| OtherFile: Scan cheque ok.pdf | 5 Nov 2019 |
| Building plan approvalFile: Plan 1 ok.pdf | 21 Jun 2019 |
| Building plan approvalFile: Plan 2 ok.pdf | 21 Jun 2019 |
| Layout approvalFile: Lay out Ok.pdf | 21 Jun 2019 |
| Copy of the legal title reportFile: Search Report ok.pdf | 21 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: Lay out Ok.pdf | 21 Jun 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 85 filed documents as one ZIP, foldered, with a manifest
Keep SATYAJEET VILLA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Karad1,100+ in Satara
silver valley
Devashree Garden LLP
VARDHAN CITY-BUILDING E AND F
SATVASHIL DNYANDEV KADAM
AANAND VIHARR
DUBAL EMPIRE
VARDHAN GOVIND
VARDHAN PROPERTIES
KEYUR RESIDENCY
AMIT SHANTARAM PATIL
MAYA ELITE COUNTY
Kachchhi Constructions
See every Satara project, with the district possession charts
Builder: SATYAJEET VILLA
SATYAJEET VILLA has 1 registration on MahaRERA, including SATYAJEET VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if SATYAJEET VILLA is delayed beyond 24 Jan 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SATYAJEET VILLA?
The registered promoter entity is SATYAJEET VILLA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SATYAJEET VILLA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SATYAJEET VILLA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SATYAJEET VILLA?
The professionals named in the filing: Architect: SIDDHIRAJ DESAI; Engineer: SUKHADEV R MORE; Chartered Accountant: YOGESH R RELEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SATYAJEET VILLA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback