Home / Browse projects / Satara, Maharashtra / MAYA ELITE COUNTY

Completed No litigation declared Mixed project

MAYA ELITE COUNTY

By Kachchhi Constructions

RG-MH-20477 · RERA P52700009947 · Last updated on MahaRERA portal: 9 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jul 2023Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 5 buildings; every applicable stage filed complete
16 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

MAYA ELITE COUNTY is a Mixed project by Kachchhi Constructions in Satara, Maharashtra, registered with MahaRERA as P52700009947 on 23 Aug 2017. The registration is recorded completed; possession was promised by 11 Jul 2023. 26 of the 42 units on this registration are recorded sold or booked, and 44 of 44 construction stages are filed complete.

At a glance

Project

  • NameMAYA ELITE COUNTY
  • TypeMixed
  • Location
    • Goleshwar Road
    • Goleshwar
    • Karad
    • Satara
    • 415124
  • Pincode415124
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700009947
  • ReraGenie IDRG-MH-20477

Builder

  • NameKachchhi Constructions
  • Entity typePartnership
  • PartnersTasneem Javed Kachchhi, Gauhar Javed Kachchhi

Key dates

this monthRegisteredAug 2017PromisedJul 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Aug 2017
  • Promised completion11 Jul 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed43 files

Current status

62%26 of 42 units booked

Figures as on 9 Dec 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
32 to 38NA20000
61 to 67NA20000
56 TO 60NA20000
39 to 45NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 9 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 5 buildings.

32 to 38100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
61 to 67100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
56 TO 60100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
39 to 45100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 9 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Outer boundary compound wall to entire projectYes100%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Open Space26
BuildingOpen SpaceTotal
32 to 3877
61 to 6777
56 TO 6055
39 to 4577

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Madhukar Dnyandeo ShirkeKarad (M Cl)Satara
Sudhir Madhukar ShirkeGoleshwarSatara
Sunil Madhukar ShirkeGoleshwarSatara
Sujata Pramod KumbharGoleshwarSatara

Approvals and building plan

Permissible FSI1793.92
Proposed, not sanctioned1,794 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKarve Naka, Karad

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJaved Kachchhi
EngineerGauhar Kachchhi
Chartered AccountantB D SABOO & ASSOCIATES
PartnerRole in project
Kachchhi Constructions-

Litigation declared1

CaseCourtStatus
RCS 244/2017KARAD COURTreturn of summons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Dec 2024

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Rera Form 4.pdf9 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Rera Form 4.pdf4 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Rera Form 4.pdf3 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certificate (1).pdf3 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Arch certificate.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng cert Rera 2024.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5-Updated.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate 2023.pdf12 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certificate.pdf12 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form 5.pdf15 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KC certificate.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng cert Rera (1).pdf16 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Rera completion.pdf16 Jul 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf4 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Urban 251 cert.pdf4 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CA CERT FORM3_compressed (1).pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA CERT FORM5 22.pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA certificate 2021.pdf1 Dec 2021
Declaration about Commencement CertificateFile: KC DECLARATION 1.pdf3 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Eng certificate 19.pdf3 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Eng certificate 20 (1).pdf3 Oct 2021
Disclosure of sold/ booked inventoryFile: sold inventory.pdf3 Oct 2021
Disclosure of sold/ booked inventoryFile: RERA inventory.pdf3 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA CA CERT 18:19.pdf2 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA CA CERT 19:20.pdf2 Oct 2021
Certificates of CA (Form 5)File: CA CERTIFICATE.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CERT .pdf31 Jul 2017
Copy of the legal title reportFile: ASK.pdf30 Jul 2017
Declaration in FORM BFile: Form B affidavit.pdf30 Jul 2017
Declaration in FORM BFile: Declaration Co Promotor.pdf30 Jul 2017
OtherFile: Declaration Co Promotor.pdf30 Jul 2017
Building plan approval or NA orderFile: KC MD4.pdf29 Jul 2017
Layout approvalFile: KC MD 3.pdf29 Jul 2017
PAN CardFile: KC PAN.pdf29 Jul 2017
Copy of the legal title reportFile: Developement Agreement.pdf29 Jul 2017
Details of encumbrancesFile: Self declaration.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: KC MD 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: KC MD4.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: KC building permissions (3).pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert Rera.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA certificate - RERA (Kachchhi Constructions.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement to sale.pdf29 Jul 2017
Proforma of Allotment letterFile: Sale deed.pdf29 Jul 2017

How this compares with Satara

62%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep MAYA ELITE COUNTY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goleshwar1,100+ in Satara

2 kmMAYA ELITE COUNTYCompleted 8Lapsed / revoked 9Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: Kachchhi Constructions

Kachchhi Constructions has 1 registration on MahaRERA, including MAYA ELITE COUNTY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if MAYA ELITE COUNTY is delayed beyond 11 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAYA ELITE COUNTY?

The registered promoter entity is Kachchhi Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAYA ELITE COUNTY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAYA ELITE COUNTY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAYA ELITE COUNTY?

The professionals named in the filing: Architect: Javed Kachchhi; Engineer: Gauhar Kachchhi; Chartered Accountant: B D SABOO & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAYA ELITE COUNTY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAYA ELITE COUNTY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAYA ELITE COUNTY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.