SATRA PARK
RG-MH-10499 · RERA P51800007235 · Last updated on MahaRERA portal: 12 Aug 2020
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 58 months past the filed date
- 12 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SATRA PARK is a Residential / Group Housing project by SHREENIVAS DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007235 on 17 Aug 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. 12 complaints are on record with the regulator.
At a glance
Project
- NameSATRA PARK
- TypeResidential / Group Housing
- Location
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800007235
- ReraGenie IDRG-MH-10499
Builder
- NameSHREENIVAS DEVELOPERS
- Entity typePartnership
- PartnersPRAVIN VIRAM SATRA, GEETA PREMJI SATRA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Aug 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings3 building records
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 22 | 0 | 0 | 0 | 0 |
| WING B | NA | 21 | 0 | 0 | 0 | 0 |
| WING C | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 12 Aug 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 95%.
WING A99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 94% |
WING B99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 94% |
WING C99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 91% |
Progress on shared amenities16
As on 12 Aug 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 40% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 20% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | No | Not applicable |
| SWIMMING POOL | Yes | 75% |
Parking filed459
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 157 | 157 |
| WING B | 145 | 145 |
| WING C | 157 | 157 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SATRA PROPERTIES(INDIA)LIMITED | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIVEK J BHOLE |
| Engineer | C B PATEL |
| Chartered Accountant | JAIN ANIL & ASSOCIATES |
| Chartered Accountant | GMJ & COMPANY |
| Partner | Role in project |
|---|---|
| SHREENIVAS DEVELOPERS | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| PIL40/2011 | HIGH COURT OF BOMBAY | PENDING |
Complaints filed with MahaRERA12
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000417 | Harish Bulchandani | Satra Properties (India) Limited | 08/09/2017 |
| CC006000000057026 | BRINDA JITENDRA SHAH | SATRA PROPERTIES (INDIA) PVT. LTD. | 23/11/2018 |
| CC006000000057027 | KANTILAL A. SHAH (HUF) | SATRA PROPERTIES (INDIA) LTD. | 23/11/2018 |
| CC006000000057028 | M/S BLUE ROSE VENTURES, LLP. | SATRA PROPERTIES (INDIA) LTD. | 23/11/2018 |
| CC006000000057029 | M/S BLUE ROSE VENTURES, LLP. | SATRA PROPERTIES (INDIA) LTD. | 23/11/2018 |
| CC006000000089888 | Sharan P Khanna | Satra Properties (India) Limited | 04/07/2019 |
| CC006000000089969 | Sharan P. Khanna HUF | Satra Properties (India) Limited | 04/07/2019 |
| CC006000000089976 | Tapin Sharan Khanna | Satra Properties (India) Limited | 04/07/2019 |
| CC006000000089977 | Jaldhara Properties & Trading Private Limited | Satra Properies (India) Limited | 04/07/2019 |
| CC006000000089979 | Chaitanyajyoti Finvest Private Limited | Satra Properties (India) Limited | 04/07/2019 |
| CC006000000089981 | Gilbert Investments Private Limited | Satra Properties (India) Limited | 04/07/2019 |
| CC006000000089982 | TTD Realtors Private Limited | Satra Properties (India) Limited | 04/07/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A)File: BORIVALI FORM 2 A DEC 19.pdf | 12 Aug 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: BORIVALI FORM 2 A MARCH 20.pdf | 12 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPIL FORM 1 DEC 19.pdf | 21 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPIL FORM 1 MARCH 20.pdf | 21 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BVI FORM 2 DEC 19.pdf | 21 Jul 2020 |
| Certificates of CA (Form 3)File: rera form 3 dec 19 borivali project.pdf | 5 Jun 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 satra park sept 2019.pdf | 24 Dec 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: form 2A satra park sept 2019.pdf | 24 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Satra Park Form 1 Sept 2019.pdf | 23 Dec 2019 |
| Certificates of CA (Form 3)File: FORM 3 SHRINIVAS SEPT 19.pdf | 21 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SPIL FORM 5 MARCH 2019.pdf | 21 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Satra park JUne 19.pdf | 5 Oct 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Satra park Form 2A Quality Assurance Certificate.pdf | 27 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 satra park JUNE 19.pdf | 26 Sep 2019 |
| Certificates of CA (Form 3)File: FORM 3 Satra park JUNE19.pdf | 24 Sep 2019 |
| OtherFile: SATRA PARK JOINT PROMOTERS DETAILS.pdf | 19 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SPIL March 19.pdf | 14 Aug 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2 A SPIL March 19.pdf | 14 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 satra park march 19.pdf | 29 Jun 2019 |
| Certificates of CA (Form 3)File: form 3 consol satra park March 19.pdf | 25 Jun 2019 |
| Details of encumbrancesFile: DECLARATION MAY 2019.pdf | 11 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 satra park dec 18.pdf | 3 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SPIL SATRA PARK FORM 2 DEC18.pdf | 27 Mar 2019 |
| Certificates of CA (Form 3)File: SATRA PARK FORM 3 DEC 18.pdf | 16 Mar 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION.pdf | 12 Mar 2019 |
| Certificates of CA (Form 5)File: SPIL Form 5.pdf | 21 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 181005_ARCHITECT'S CERTIFICATE.pdf | 3 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Satra Park.pdf | 27 Dec 2018 |
| Certificates of CA (Form 3)File: FORM 3 SATRAPARK SEPT 2018.pdf | 22 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPIL form 1 June.pdf | 21 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Satra park form 2 June 18.pdf | 18 Sep 2018 |
| Certificates of CA (Form 3)File: satra park form 3 June 18.pdf | 18 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SATRA PARK FORM 2 MARCH 18.pdf | 29 Jun 2018 |
| Certificates of CA (Form 3)File: FORM 3 SATRA PARK MAR 18.pdf | 28 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 18 BVI.pdf | 21 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 23 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 17.pdf | 6 Mar 2018 |
| Certificates of CA (Form 3)File: BVI FORM 3 DEC 17.pdf | 26 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Satra park form 1 sept17.pdf | 30 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Borivali RERA 30-9-2017.pdf | 28 Oct 2017 |
| Certificates of CA (Form 3)File: SATRA PARK FORM 3 SEPT17.pdf | 28 Oct 2017 |
| PAN CardFile: PAN - Satra Properties (India) Limited.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Decla of encumbrances borivali.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: shreeniwas form B.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Borivali.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-BORIVALI.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: BORIVALI FORM 3.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Sale Decl.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOA Satra Park Borivali.pdf | 25 Jul 2017 |
| Layout approvalFile: Borivali approved plan layout.pdf | 25 Jul 2017 |
| PAN CardFile: PAN card of Shreenivas Developers.pdf | 25 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate - Borivali Compressed.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Borivali approved plan layout.pdf | 25 Jul 2017 |
| Building Plan Approval (IOD)File: IOA Satra Park Borivali.pdf | 25 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: SATRA PARK_CC.pdf | 25 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SATRA PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 471 registered projects within 2 km.
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: SHREENIVAS DEVELOPERS
SHREENIVAS DEVELOPERS has 1 registration on MahaRERA, including SATRA PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that SATRA PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SATRA PARK is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SATRA PARK?
The registered promoter entity is SHREENIVAS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SATRA PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SATRA PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SATRA PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SATRA PARK?
The professionals named in the filing: Architect: VIVEK J BHOLE; Engineer: C B PATEL; Chartered Accountant: JAIN ANIL & ASSOCIATES; Chartered Accountant: GMJ & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SATRA PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback