ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Sateri Legacy B Wing Phase I- 2nd and above floors

Registration lapsed No litigation declared Residential / Group Housing project

Sateri Legacy B Wing Phase I- 2nd and above floors

By BINDRA SATERI CONSTRUCTIONS

RG-MH-28037 · RERA P51800024998 · Last updated on MahaRERA portal: 6 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 50%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Sateri Legacy B Wing Phase I- 2nd and above floors is a Residential / Group Housing project by BINDRA SATERI CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024998 on 18 Mar 2020. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameSateri Legacy B Wing Phase I- 2nd and above floors
  • TypeResidential / Group Housing
  • Location
    • Road NO 22
    • MIDC
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • RERA no.P51800024998
  • ReraGenie IDRG-MH-28037

Builder

  • NameBINDRA SATERI CONSTRUCTIONS
  • Entity typeOthers
  • Named personsBINDRA CONSTRUCTIONS (legal heirs), SATERI CONSTRUCTIONS LLP
  • Other registrations3 more →
  • No longer live4 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredMar 2020PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Mar 2020
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sateri Legacy B Wing Phase I- 2nd and above floorsNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

Sateri Legacy B Wing Phase I- 2nd and above floors: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area212 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sateri ConstructionsAndheriMumbai Suburban

Approvals and building plan

Permissible FSI2058.89
Proposed, not sanctioned2,034 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch141,Sher E Punjab Chs Ltd,off Mahakali Road Andheri East ,Mumbai-400093,Maharashtra,India

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
BINDRA SATERI CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Mar 20.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing March 21.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing June 21.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Sep 21.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Dec 21.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Mar 22.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing June 22.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Sep 22.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Dec 22.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing Mar 23.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing June 23.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_CON_B Wing_25_200120_compressed.pdf16 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate b wing ph1_compressed.pdf16 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate b wing ph1.pdf16 Mar 2020
OtherFile: CTS-25 Rera Other documents-B wing.pdf16 Mar 2020
PAN CardFile: Pan card-converted.pdf5 Mar 2020
Declaration in FORM BFile: Form B for B wing with completion date.pdf5 Mar 2020
Layout approvalFile: Scan_0645-01.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-01.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-02-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-03-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-04-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-05-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-06-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-07-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-08-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-09-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-10-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-11-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-12-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-13-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-14-converted-compressed.pdf17 Feb 2020
Building plan approvalFile: Scan_0645-15-converted (1)-compressed.pdf17 Feb 2020
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf17 Feb 2020
Details of encumbrancesFile: B wing declaration encumbrances.pdf17 Feb 2020
Copy of Layout Approval (in case of layout)File: Scan_0645-01.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-01.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-02-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-03-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-04-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-05-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-06-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-07-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-08-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-09-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-10-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-11-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-12-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-13-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-14-converted-compressed.pdf17 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Scan_0645-15-converted (1)-compressed.pdf17 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: Further CC_25_030120 (2)-compressed.pdf17 Feb 2020
Proforma of Allotment letterFile: B wing declration for allotment and agreement.pdf17 Feb 2020
OtherFile: Revised IOA_25_030120 (2).PDF17 Feb 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sateri Legacy B Wing Phase I- 2nd and above on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIDC6,700+ in Mumbai Suburban

Builder: BINDRA SATERI CONSTRUCTIONS

BINDRA SATERI CONSTRUCTIONS has 4 registrations on MahaRERA, including BINDRA SATERI LEGACY C WING AND F WING PHASE I - UPTO 10TH FLOOR and BINDRA SATERI LEGACY C WING AND F WING PHASE II - 11TH AND ABOVE FLOORS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Sateri Legacy B Wing Phase I- 2nd and above floors shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sateri Legacy B Wing Phase I- 2nd and above floors is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sateri Legacy B Wing Phase I- 2nd and above floors?

The registered promoter entity is BINDRA SATERI CONSTRUCTIONS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sateri Legacy B Wing Phase I- 2nd and above floors?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sateri Legacy B Wing Phase I- 2nd and above floors?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Sateri Legacy B Wing Phase I- 2nd and above floors?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sateri Legacy B Wing Phase I- 2nd and above floors. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sateri Legacy B Wing Phase I- 2nd and above to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.