ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SAT ANUPA CHS PHASE 1

Completed No litigation declared Residential / Group Housing project

SAT ANUPA CHS PHASE 1

By DISHA CONSTRUCTION

RG-MH-21023 · RERA P51800001640 · Last updated on MahaRERA portal: 9 Jan 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 99%
1Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SAT ANUPA CHS PHASE 1 is a Residential / Group Housing project by DISHA CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001640 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2022. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAT ANUPA CHS PHASE 1
  • TypeResidential / Group Housing
  • Location
    • GULMOHAR CROSS ROAD NO.6
    • JUHU
    • Andheri
    • Mumbai Suburban
    • 400049
  • Pincode400049
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001640
  • ReraGenie IDRG-MH-21023

Builder

  • NameDISHA CONSTRUCTION
  • Entity typePartnership
  • PartnersMAHENDRA JAGMOHANDAS SHAH, DISHALANDDEVELOPERPVT LAND DEVELOPER
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2017First promiseMar 2020Revised toMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Mar 2022
  • Revised completionRevised to 30 Mar 2022 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAT ANUPA CHS PHASE 1NA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 99%.

SAT ANUPA CHS PHASE 1: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor98%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 9 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area861 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAT ANUPA CHSAndheriMumbai Suburban

Approvals and building plan

Permissible FSI2557.0
Proposed, not sanctioned2,320 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPREMAL GOGRI
PartnerRole in project
DISHA CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002393Mar 2020 → Mar 2021

Reason as filed by the promoterDUE TO CHANGE OF DCR TO NEW DCPR, TRANSITION POLICY, DATE OF APPLICABILITY OF NEW DCPR, APPROVAL AS PER NEW DCPR FOR BALANCE PORTION OF DEVELOPMENT ETC

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000354358M/s Coral Farm Developers Pvt. Ltd. .DISHA CONSTRUCTION16/02/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jan 2022

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FROM 5 - ANUPA 21-22.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 ANUPA 20-21.pdf2 Mar 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM - 4 ANUPA.pdf18 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER ANUPA 2303940_OC_signed.pdf13 Jan 2022
Certificates of CA (Form 3)File: FORM - 3 CA CERTI ANUPA_compressed.pdf20 Oct 2021
Declaration about Commencement CertificateFile: Declaration of CC SAT ANUPA.pdf19 Oct 2021
PAN CardFile: DC.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 ENGINEER CERTI ANUPA_compressed.pdf14 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1 ARCHITECT CERTI Anupa.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM - 2A QUALITY anupa_merged_compressed.pdf12 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM - 5 ANUPA 19-20.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2AANUPA_compressed.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A ANUPA 20-21_compressed.pdf16 Aug 2021
Details of encumbrancesFile: ENCUMB LET TATA.pdf14 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC UPO 12TH FLOOR FULL.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1 ARCHIT CERT.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 ENGINEER CERTIFICATE_compressed.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM - 2A SAT ANUPA.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: FORM - 29 INVENTORY ANUPA.pdf14 Aug 2021
Certificates of CA (Form 3)File: FORM - 3 CA CERTI SAT_ANUPA__compressed.pdf14 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: soc letter aunpa.pdf14 Aug 2021
Status of ConveyanceFile: soc letter aunpa.pdf14 Aug 2021
Layout approvalFile: PLAN COPY 12TH FLOOR 1.pdf28 Nov 2020
Copy of Layout Approval (in case of layout)File: PLAN COPY 12TH FLOOR 1.pdf28 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: CC UPO 12TH FLOOR FULL.pdf24 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: CC FULL.pdf17 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_anupa.pdf16 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE SAT ANUPA_compressed.pdf16 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE SAT ANUPA_compressed.pdf16 Jan 2020
Certificates of CA (Form 3)File: CA CERT ANUPA n0007.pdf16 Jan 2020
Certificates of CA (Form 5)File: FORM 5 SAT ANUPA.pdf20 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 SAT ANUPA.pdf20 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi Anupa_compressed.pdf13 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTI ANUPA_compressed.pdf13 Jun 2019
Certificates of CA (Form 3)File: CA CERTIFICATE ANUPA_compressed.pdf13 Jun 2019
Certificates of CA (Form 5)File: FORM - 5 SAT ANUPA.PDF5 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE SAT ANUPA.pdf25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE SAT ANUPA.pdf25 Jan 2019
Certificates of CA (Form 3)File: CA CERTIFICATE SAT ANUPA.pdf25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf12 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf12 May 2018
Certificates of CA (Form 3)File: CA CERTI SAT ANUPA.pdf12 May 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf26 Jul 2017
OtherFile: SOCIETY RERA LET.pdf26 Jul 2017
Building plan approvalFile: IOD-SAT-ANUPA-5.pdf25 Jul 2017
Building plan approvalFile: IOD SAT ANUPA 6.pdf25 Jul 2017
Building plan approvalFile: IOD-SAT-ANUPA-4.pdf25 Jul 2017
Layout approvalFile: PLAN disha-01.pdf25 Jul 2017
Building plan approvalFile: IOD-SAT-ANUPA-1.pdf25 Jul 2017
Building plan approvalFile: IOD-SAT-ANUPA-2.pdf25 Jul 2017
Building plan approvalFile: IOD-SAT-ANUPA-3.pdf25 Jul 2017
Copy of the legal title reportFile: Title_Report_Sat_Anupa 1.pdf25 Jul 2017
Copy of the legal title reportFile: Title_Report_Sat_Anupa 2.pdf25 Jul 2017
Copy of the legal title reportFile: Title_Report_Sat_Anupa 3.pdf25 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE LETTER.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: PLAN disha-01.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-SAT-ANUPA-1.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-SAT-ANUPA-2.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-SAT-ANUPA-3.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-SAT-ANUPA-4.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD-SAT-ANUPA-5.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD SAT ANUPA 6.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Jul 2017
Declaration in FORM BFile: FORM B RPMOTOR.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTI.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf25 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf25 Jul 2017
Proforma of Allotment letterFile: ALLOTTMENT Letter.pdf25 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
D SQUAREVILE PARLE60CompletedMay 2014May 2014
MALA PALACE CHSVILE PARLE26CompletedMar 2014Mar 2014
E SQUAREVILE PARLE100CompletedJun 2013Jun 2013
IRISVILE PARLE17CompletedDec 2012Dec 2012

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAT ANUPA CHS PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JUHU6,700+ in Mumbai Suburban

2 kmSAT ANUPA CHS PHASE 1Completed 154Lapsed / revoked 83Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 371 registered projects within 2 km.

Builder: DISHA CONSTRUCTION

DISHA CONSTRUCTION has 5 registrations on MahaRERA, including DATTA RAMANAND CHS LTD and SAT ANUPA CHS PHASE 1. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAT ANUPA CHS PHASE 1 is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAT ANUPA CHS PHASE 1?

The registered promoter entity is DISHA CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAT ANUPA CHS PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAT ANUPA CHS PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAT ANUPA CHS PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAT ANUPA CHS PHASE 1?

The professionals named in the filing: Architect: PREMAL GOGRI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAT ANUPA CHS PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAT ANUPA CHS PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAT ANUPA CHS PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.