Home / Browse projects / Mumbai Suburban, Maharashtra / SARVODAYA HEIGHTS

Registered No litigation declared Residential / Group Housing project

SARVODAYA HEIGHTS

By CMG ENTERPRISES

RG-MH-37260 · RERA P51800049428 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
17 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
94 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

SARVODAYA HEIGHTS is a Residential / Group Housing project by CMG ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049428 on 8 Feb 2023. Possession was promised by 1 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 18 of the 112 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete.

At a glance

Project

  • NameSARVODAYA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • L.B.S. Marg
    • Ghatkopar West
    • Mumbai
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049428
  • ReraGenie IDRG-MH-37260

Builder

  • NameCMG ENTERPRISES
  • Entity typePartnership
  • PartnersNARESH CHANDULAL GANDHI, AVANI ALOK DOSHI, MUNJAL VIJAY GANDHI, UDAYAN PANNALAL SHAH, SAGAR UDAYAN SHAH, VIREN PANNALAL SHAH, RAJESH CHANDULAL GANDHI, KINJAL RAJESH GANDHI, PRITA SHAILESH GANDHI, PURAB SAILESH GANDHI, YASHESH VIJAY GANDHI

Key dates

1 months past promisethis monthRegisteredFeb 2023First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Feb 2023
  • Promised completion1 Sep 2026
  • Revised completionRevised to 1 Sep 2026 (originally 1 Sep 2025)
  • Buildings3 building records
  • Documents filed94 files

Current status

16%18 of 112 units booked
46.2%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SARVODAYA HEIGHTS BUILDING ANA121122022
SARVODAYA HEIGHTS BUILDING BNA121145045
SARVODAYA HEIGHTS BUILDING CNA121145045

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

SARVODAYA HEIGHTS BUILDING A77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
SARVODAYA HEIGHTS BUILDING B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
SARVODAYA HEIGHTS BUILDING C81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed116

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots116
Closed/Covered90
Open Space26
BuildingClosed/CoveredOpen SpaceTotal
SARVODAYA HEIGHTS BUILDING A26026
SARVODAYA HEIGHTS BUILDING B321345
SARVODAYA HEIGHTS BUILDING C321345

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,956 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
SARVODAYA COOPERATIVE HOUSING SOCIETY LIMITEDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8462.65
Proposed, not sanctioned7,566 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRupam Centrecine Planet, Sion Circle, Sion East
Estimated costRs 36.51 cr
Cost incurredRs 16.85 cr
Work done46.16%
BuildingWingEstimatedIncurred
SARVODAYA HEIGHTS BUILDING BNARs 14.20 crRs 6.60 cr
SARVODAYA HEIGHTS BUILDING CNARs 14.20 crRs 6.27 cr
SARVODAYA HEIGHTS BUILDING ANARs 7.10 crRs 3.98 cr
-NARs 1.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT KARANI
EngineerDharmraj Nijapkar
Chartered AccountantAmit Kothari and Associates LLP
Chartered AccountantNEHALI DOSHI
PartnerRole in project
CMG ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22082502416Sep 2025 → Sep 2026

Reason as filed by the promoterThis is to inform you that our project name Sarvodaya Heights located at Plot Bearing CTS Nos. 2243 A/9, 2243 A/8 and 2243A/7 of Ghatkopar-Kirol Village, N Ward, Sainath Road, o􀆯 LBS Marg, Ghatkopar West, Mumbai 400086; bearing RERA No. P51800049428. We would like to respectfully bring to your attention that the project has encountered certain unforeseen technical challenges that have adversely impacted the originally proposed timelines for completion. We wish to place on record the following reasons for the delay: 1. Delay in Statutory Clearances/Utility Approvals The project had a 13.40m RL

Litigation declared1

CaseCourtStatus
640/2019BOMBAY HIGH COURTCLOSED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf10 Aug 2026
Withdrawal Update Form 2File: Form2_June 2026.pdf10 Aug 2026
Withdrawal Update Form 3File: Form3_June 2026.pdf10 Aug 2026
Withdrawal Update Form 1File: Form1_Mar 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form2_Mar 2026.pdf26 May 2026
Withdrawal Update Form 3File: Form3_Mar 2026.pdf26 May 2026
Withdrawal Update Form 1File: Form1_Dec 2025.pdf26 Feb 2026
Withdrawal Update Form 2File: Form2_Dec 2025_2.pdf26 Feb 2026
Withdrawal Update Form 3File: Form3_Dec 2025.pdf26 Feb 2026
Withdrawal Update Form 1File: Form1_Sept 2025.pdf27 Nov 2025
Withdrawal Update Form 2File: Form2_Sept 2025.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Sept 2025.pdf27 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Mar 2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Mar 2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Mar 2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Dec 2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Dec 2024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sept 2024.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Sept 2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sept 2024.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Sept 2024.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_June 2024.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_June 2024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_June 2024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar 2024.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 2024.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Mar 2024.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_Mar 2024.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 2024.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 2023.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 2023_compressed.pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: A7 cc Revalidated.pdf20 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: A8 cc Revalidated.pdf20 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: A9 cc Revalidated.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Sept 2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_Sept 2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_Sept 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Sept 2023.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf9 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A9 Full CC.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf22 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A7 Full CC.pdf29 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A8 Full CC.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MARCH 23.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MARCH 23.pdf29 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory Disclosure_Apr 2023.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - MARCH 23.pdf29 Apr 2023
Other - TechnicalFile: DECLARATION.pdf24 Jan 2023
Layout approvalFile: 2243 A8 Amended IOD Plan.pdf17 Jan 2023
Layout approvalFile: 2243 A9 Amended IOD Plan.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: 2243 A8 Amended IOD Plan.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: 2243 A9 Amended IOD Plan.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A7 Amended IOD Certificate.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A7 Amended CC Endorsement.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A8 Amended IOD Certificate.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A8 Amended CC Endorsement.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A9 Amended IOD Certificate.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2243 A9 Amended CC Endorsement.pdf17 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Disclosure in Other Real Estate Organizations.pdf17 Jan 2023
Copy of the legal title reportFile: Title Report.pdf29 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf29 Dec 2022
Proforma of Agreement for saleFile: Draft RERA Agreement_28122022.pdf29 Dec 2022
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION- FINANCE.pdf12 Dec 2022
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION- LEGAL AND LITIGATION.pdf12 Dec 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION- FINANCE.pdf12 Dec 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION- LEGAL AND LITIGATION.pdf12 Dec 2022
CERSAI detailsFile: CERSAI DECLARATION.pdf12 Dec 2022
Proforma of Allotment letterFile: Draft RERA Letter of Allotment.pdf12 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration.pdf12 Dec 2022
Deviation Report with respect to Allotment letterFile: No deviation from Model Allotment Letter.pdf12 Dec 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation from Model Sale Agreement.pdf12 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Oct 2022
Layout approvalFile: 2243 A7 Amended IOD Plan.pdf18 Oct 2022

How this compares with Mumbai Suburban

16%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARVODAYA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar West, Mumbai6,700+ in Mumbai Suburban

2 kmSARVODAYA HEIGHTSCompleted 114Lapsed / revoked 63Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 277 registered projects within 2 km.

Builder: CMG ENTERPRISES

CMG ENTERPRISES has 1 registration on MahaRERA, including SARVODAYA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SARVODAYA HEIGHTS is delayed beyond 1 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARVODAYA HEIGHTS?

The registered promoter entity is CMG ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARVODAYA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARVODAYA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARVODAYA HEIGHTS?

The professionals named in the filing: Architect: HEMANT KARANI; Engineer: Dharmraj Nijapkar; Chartered Accountant: Amit Kothari and Associates LLP; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARVODAYA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARVODAYA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARVODAYA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.