SARTHAK HEIGHTS
RG-MH-12510 · RERA P51800007127 · Last updated on MahaRERA portal: 25 Apr 2025
Source: official MahaRERA filing
Red flags
- 9 complaints at MahaRERA
- Completion date moved by 73 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARTHAK HEIGHTS is a Others project by Sarthak Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007127 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 73 months from the original filing. 9 complaints are on record with the regulator.
At a glance
Project
- NameSARTHAK HEIGHTS
- TypeOthers
- Location
- Andheri
- Mumbai Suburban
- 400058
- Pincode400058
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800007127
- ReraGenie IDRG-MH-12510
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Nov 2019)
- Buildings2 building records
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SARTHAK HEIGHTS WING B | NA | 18 | 0 | 0 | 0 | 0 |
| SARTHAK HEIGHTS WING A | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.
SARTHAK HEIGHTS WING B79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 77% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 82% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
SARTHAK HEIGHTS WING A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed60
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Sarthak Developers | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOn-going litigation with members of the Society and purchasers due to delays in completion of the project which led to a Court Receiver, High Court, Bombay being appointed as Receiver of the suit property since October 2019. The said receiver has taken symbolic possession of the project but due to the on-going Covid-19 pandemic and associated lockdown, no further progress in the matter was achieved. However, the disputes have now been settled, and a draft copy of the Consent Terms have been agreed upon by all concerned parties.
Reason as filed by the promoter1) Administrative delay of nearly 4 years on part of the Municipal Corporation of Greater Mumbai (“MCGM”) to issue part occupation certificate in respect of the commercial premises situated in Wing ‘A’. As a result, there was no realization of rent for a period of 4 years which impaired the ability to introduce funds into the Project. Further, on account of the delay, the investors in the Project decided to withdraw from the Project and demanded refund of the part consideration advanced in respect of the commercial premises. This led to blockage of funds and estoppel from selling the commercia
Reason as filed by the promoterWe refer to the subject matter and hereunder submit our application for seeking extension of time for completion of the Project as required under Section 6 of The Real Estate (Regulation and Development) Act, 2016, read with Rule 7(3) of The Maharashtra Real Estate (Regulation and Development) (Registration of Real Estate Projects, Registration of Real Estate Agents, Rates of Interest and Disclosures on Website) Rules 2017 We place on record for your attention, the three main reasons for which extension of Registration is sought A Sudden sad demise of the Managing Partner, Mr. Vijay Shridhar M
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 648/2014/2014 | CITY CIVIL | PENDING |
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056445 | Imtiaz Doctor | Sarthak Developers | 06/10/2018 |
| CC006000000056448 | Suleman Hooda | Sarthak Developers | 06/10/2018 |
| CC006000000056449 | Shanaz Ayub | Sarthak Developers | 06/10/2018 |
| CC006000000057045 | Imran Kasam Shaikh | Sarthak Developers | 29/11/2018 |
| CC006000000078490 | Mr Manish and MrsMandeera Chaudhary | Sarthak Developers | 15/03/2019 |
| CC006000000078493 | Mr Venkatesh and Nimmi Iyer | Sarthak Developers | 15/03/2019 |
| CC006000000078494 | Percy and Sonia Vasunia | Sartak Developers | 15/03/2019 |
| CC006000000089552 | Maryam Musaddik Peshimam Nee and | Sarthak Developers | 01/06/2019 |
| CC006000000090162 | Mr.Mohidin Adhima Siddiq | Sarthak Developers | 16/07/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: Cons for extension.pdf | 25 Apr 2025 |
| Declaration about Commencement CertificateFile: Decl abt CC.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 2019-20.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 2020-21.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2021-22.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23.pdf | 17 Apr 2025 |
| Certificates of CA (Form 3)File: form 3 dec 24 2.pdf | 1 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inven discl.pdf | 1 Apr 2025 |
| Declaration in FORM BFile: form B final.pdf | 29 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 24.pdf | 24 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Architect's Cert.pdf | 20 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Discl.pdf | 20 Mar 2025 |
| Declaration in FORM BFile: form B 500.pdf | 19 Mar 2025 |
| CERSAI detailsFile: Cersai Decl.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 11 Mar 2025 |
| Other - LegalFile: Sarthak Heights RERA.pdf | 15 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Priyadarshini Registration.pdf | 9 Sep 2021 |
| Details of Restarting of Construction work post lockdownFile: PROJECT Sarthak Heights - Covid.pdf | 16 Jun 2020 |
| Certificates of CA (Form 5)File: FORM_ 5-31032018 (SD-SH).pdf | 2 Jan 2019 |
| Certificates of Architect (Form 4)File: FORM 4_PartOC.pdf | 2 Nov 2018 |
| Building plan approvalFile: IOD 3.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOD 4.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOD 1.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOD 2.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 1.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 2.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 3.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: IOD 4.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Proforma Allotment Letter and Agreement for Sale Final.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC (2).pdf | 28 Jul 2017 |
| Layout approvalFile: 2.pdf | 27 Jul 2017 |
| Layout approvalFile: 3.pdf | 27 Jul 2017 |
| Layout approvalFile: 1.pdf | 27 Jul 2017 |
| Layout approvalFile: 4.pdf | 27 Jul 2017 |
| Layout approvalFile: 5.pdf | 27 Jul 2017 |
| Layout approvalFile: 6.pdf | 27 Jul 2017 |
| Layout approvalFile: 7.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate (2).pdf | 27 Jul 2017 |
| Details of encumbrancesFile: Encumbrances - Sarthak Heights.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 2.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 3.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 4.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 5.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 6.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 7.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: Affidvat-Sarthak.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Mehta 1.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Mehta 2.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Mehta 3.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Mehta 4.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arif Bhakri Engineer Cert(2).pdf | 27 Jul 2017 |
| Certificates of CA (Form 3)File: Vishal CA Cert.pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep SARTHAK HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 271 registered projects within 2 km.
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
Alpine Primo
ALPINE INFRAHEIGHTS LLP
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
See every Mumbai Suburban project, with the district possession charts
Builder: Sarthak Developers
Sarthak Developers has 2 registrations on MahaRERA, including SARTHAK HEIGHTS and Jaishankar Heights. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SARTHAK HEIGHTS is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARTHAK HEIGHTS?
The registered promoter entity is Sarthak Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARTHAK HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SARTHAK HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SARTHAK HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in SARTHAK HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback