Home / Browse projects / Mumbai City, Maharashtra / SARASWATI SADAN

Registration lapsed No litigation declared Residential / Group Housing project

SARASWATI SADAN

By S.S. ENTERPRISE

RG-MH-20091 · RERA P51900005427 · Last updated on MahaRERA portal: 28 Sep 2018

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
2 of 11Construction stages donefurthest along: Basement (if any), 90%
3Complaints at MahaRERAon this registration
Jump to the 17 documents Report an error

SARASWATI SADAN is a Residential / Group Housing project by S.S. ENTERPRISE in Mumbai City, Maharashtra, registered with MahaRERA as P51900005427 on 11 Aug 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. The completion date has moved by 24 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSARASWATI SADAN
  • TypeResidential / Group Housing
  • Location
    • Mumbai City
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900005427
  • ReraGenie IDRG-MH-20091

Builder

  • NameS.S. ENTERPRISE
  • Entity typePartnership
  • PartnersSHUBHANG DILIP DHRUV, VARSHA DILIP DHRUV, SIDDHI RAHUL GHAI

Key dates

58 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed17 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SARASWATI SADANNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Sep 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

SARASWATI SADAN: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 28 Sep 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes50%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered10
Open Space16

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area502 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1355.4
Proposed, not sanctioned1,355 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUNCITY THEATRE MG ROAD VILE PARLE EAST MUMBAI 400057

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNITIN TIWASKAR
PartnerRole in project
S.S. ENTERPRISE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900005222Dec 2019 → Dec 2020

Reason as filed by the promoterPromoter and the Partners of the said firm have been in the Family Business of Developing projects. The proposed date of completion of the said Project was 31st December 2019 and the project is currently 95% complete. The senior partner of the firm had been hospitalized due to severe Health issues. Also, owing to Financial crunch and economic slowdown arising due to Recession, lack of sale, the completion of the project has been delayed. However, as we are experiencing an improvement in our situation, we would like you to Grant us an extension for completion of our project by a period of 1 yea

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000057738Vanraj ShahS. S. ENTERPRISE29/01/2019
CC006000000057744Geeta V. ShahM/s. S. S. Enterprise29/01/2019
CC006000000197053Sanjay Mahendrabhai ShahM/s. S. S. Enterprise22/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed17

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Form 5.PDF28 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archietect certificate - Tiwaskar.pdf17 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate -roparikh.pdf17 Jan 2018
Certificates of CA (Form 3)File: saraswati sadan_Scanned.PDF17 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_saraswati.PDF28 Jul 2017
Certificates of CA (Form 3)File: CA Certificate SARASWATI SADAN.pdf28 Jul 2017
PAN CardFile: Pan card_saraswati.pdf27 Jul 2017
Details of encumbrancesFile: Self Declaration_Saraswati Sadan.pdf27 Jul 2017
Declaration in FORM BFile: Form B_Saraswati Sadan_Compressed.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf27 Jul 2017
Building plan approvalFile: Intimation Of Disapproval (IOD)_compressed.pdf24 Jul 2017
Layout approvalFile: Laypout plan.pdf24 Jul 2017
Copy of the legal title reportFile: Title Certificate_compressed.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: Laypout plan.pdf24 Jul 2017
Building Plan Approval (IOD)File: Intimation Of Disapproval (IOD)_compressed.pdf24 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf24 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale - RERA Draft .pdf24 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 24 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARASWATI SADAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmSARASWATI SADANCompleted 52Lapsed / revoked 27Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: S.S. ENTERPRISE

S.S. ENTERPRISE has 1 registration on MahaRERA, including SARASWATI SADAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that SARASWATI SADAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SARASWATI SADAN is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARASWATI SADAN?

The registered promoter entity is S.S. ENTERPRISE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARASWATI SADAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SARASWATI SADAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SARASWATI SADAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARASWATI SADAN?

The professionals named in the filing: Architect: NITIN TIWASKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARASWATI SADAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARASWATI SADAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARASWATI SADAN to a free account