Home / Browse projects / Raigarh, Maharashtra / Saras Vatika

Registered No litigation declared Others project

Saras Vatika

By KT & LK SWEET HOMES

RG-MH-07571 · RERA P52000054740 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 50.00 crore secured on the land, in favour of Motilal Oswal Home Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 77%
6 of 118Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Saras Vatika is a Others project by KT & LK SWEET HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000054740 on 12 Feb 2024. Possession is promised by 31 Dec 2028. 112 of the 118 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSaras Vatika
  • TypeOthers
  • Location
    • Sector 20
    • New Panvel East
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054740
  • ReraGenie IDRG-MH-07571

Builder

  • NameKT & LK SWEET HOMES
  • Entity typePartnership
  • GSTIN27AAYFK0518M1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRajeshkumar Mulchand Chavala, Kamleshkumar Laxmanbhai Patel, Dhiraj Vijaykumar Chawla, Hitesh Dilipbhai Vadhavani, Damji Ravji Ravria, KRUNAL OMPRAKASH CHAWLA
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Current status

95%112 of 118 units booked
55.5%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Saras VatikaNA101010117118

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 77%.

Saras Vatika: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.16%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed99

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots99
Closed/Covered99

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,530 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofMotilal Oswal Home Finance Limited
Secured amountRs 50.00 crore
Declared on9 Sep 2024

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI14395.87
Proposed, not sanctioned8,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 38/39 Patel Heritage Plot No 15 and 17 Sector 7 kharghar Navi Mumbai 410210
Estimated costRs 87.04 cr
Cost incurredRs 48.32 cr
Work done55.51%
BuildingWingEstimatedIncurred
Saras VatikaNARs 43.52 crRs 24.16 cr
-NARs 43.52 crRs 24.16 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel
ArchitectATUL PATEL ARCHITECT
EngineerBIPIN MAURYA
Chartered AccountantPJPJ AND ASSOCIATES
Chartered AccountantPJPJ & ASSOCIATES
Chartered AccountantSWATI SUDHENDU PATEL
Chartered AccountantPiyush Ghatliya & Co
Chartered AccountantBhavik J Velani
PartnerRole in project
KT & LK SWEET HOMES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-03-2026 Sign.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 Saras Vatika March 2026.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 Saras Vatika March 2026.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf30 Jan 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 Saras Vatika Signed.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 Saras Vatika Signed.pdf30 Jan 2026
Withdrawal Update Form 1File: Form 1- 30-9-25 Saras Vatika.pdf27 Jan 2026
Withdrawal Update Form 2File: FORM 2 Saras Vatika - 30-09-2025.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 30-09-2025 Saras Vatika.pdf27 Jan 2026
Form 5 (FY 2024-2025)File: Uploded Form-5.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1 Saras Vatika 30 06 2025 Signed.pdf26 Sep 2025
Withdrawal Update Form 2File: Form 2 Saras Vatika - 30 06 2025.pdf26 Sep 2025
Withdrawal Update Form 3File: Form 3 30 06 2025 Saras Vatika.pdf26 Sep 2025
Form 1File: Form 1 Saras Vatika 30 06 2025 Signed.pdf1 Sep 2025
Form 2File: Form 2 Saras Vatika - 30 06 2025.pdf1 Sep 2025
Form 3File: Form 3 30 06 2025 Saras Vatika.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sheet- Rera - 30 06 2025 Saras Vatika.pdf1 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Sold Unsold Inventory.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2024.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 26-11-2024.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2024.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 26-11-2024.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf27 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30-09-2024.pdf27 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf27 Nov 2024
Layout approvalFile: 4 PLAN 1.pdf26 Nov 2024
Layout approvalFile: 5 PLAN 2.pdf26 Nov 2024
Layout approvalFile: 6 PLAN 3.pdf26 Nov 2024
Layout approvalFile: 7 PLAN 4.pdf26 Nov 2024
Building plan approvalFile: 4 PLAN 1.pdf26 Nov 2024
Building plan approvalFile: 5 PLAN 2.pdf26 Nov 2024
Building plan approvalFile: 6 PLAN 3.pdf26 Nov 2024
Building plan approvalFile: 7 PLAN 4.pdf26 Nov 2024
Copy of Layout Approval (in case of layout)File: 5 PLAN 2.pdf26 Nov 2024
Copy of Layout Approval (in case of layout)File: 6 PLAN 3.pdf26 Nov 2024
Copy of Layout Approval (in case of layout)File: 7 PLAN 4.pdf26 Nov 2024
Copy of Layout Approval (in case of layout)File: 4 PLAN 1.pdf26 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 3 CC.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 PLAN 1.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 PLAN 2.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 PLAN 3.pdf26 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 PLAN 4.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saras Vatika 30-06-2024 - Final.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-06-2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf14 Oct 2024
Other - TechnicalFile: ANNEXURE A.pdf2 Feb 2024
Other - TechnicalFile: KTLK MAIL.pdf2 Feb 2024
Copy of the legal title reportFile: TITLE KT.pdf18 Jan 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf18 Jan 2024
Declaration in FORM BFile: Form B (1)_1 (2 files merged).pdf18 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: KRUNAL CHAWLA (6 files merged)_1 (7 files merged) (1).pdf18 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT DRAFT NEW.pdf18 Jan 2024
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf18 Jan 2024
Other - LegalFile: Partnership Deed -1.pdf18 Jan 2024
Other - LegalFile: Partnership Deed -2.pdf18 Jan 2024
Other - LegalFile: Partnership Deed -3.pdf18 Jan 2024
Layout approvalFile: KT PLAN1.pdf17 Jan 2024
Layout approvalFile: KT PLAN2.pdf17 Jan 2024
Layout approvalFile: KT PLAN3.pdf17 Jan 2024
Layout approvalFile: KT PLAN4.pdf17 Jan 2024
Layout approvalFile: KT PLAN5.pdf17 Jan 2024
Building plan approvalFile: KT PLAN1.pdf17 Jan 2024
Building plan approvalFile: KT PLAN2.pdf17 Jan 2024

How this compares with Raigarh

95%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Saras Vatika on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Panvel East5,900+ in Raigarh

2 kmSaras VatikaCompleted 132Lapsed / revoked 39Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 292 registered projects within 2 km.

Builder: KT & LK SWEET HOMES

KT & LK SWEET HOMES has 2 registrations on MahaRERA, including Saras Vatika and Sai Vrindavan Dham. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Saras Vatika is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Saras Vatika?

The registered promoter entity is KT & LK SWEET HOMES, a partnership as per the filing. Its GSTIN 27AAYFK0518M1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Saras Vatika?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Saras Vatika?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Saras Vatika?

The professionals named in the filing: Architect: Atul Patel; Architect: ATUL PATEL ARCHITECT; Engineer: BIPIN MAURYA; Chartered Accountant: PJPJ AND ASSOCIATES; Chartered Accountant: PJPJ & ASSOCIATES; Chartered Accountant: SWATI SUDHENDU PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saras Vatika?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saras Vatika. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saras Vatika to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.