Home / Browse projects / Bengaluru Urban, Karnataka / SARANYA SIGNATURE
SARANYA SIGNATURE
RG-KA-24473 · RERA PRM/KA/RERA/1251/446/PR/210524/006931 · Last updated on RERA Karnataka portal: 14 Nov 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out every unit, the land chain and the schedule as filed and places this filing against the promoter's other registrations.
See what the report covers Free either way: .Saved.
SARANYA SIGNATURE is a Residential/Group Housing project by Saranya Builders in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/210524/006931 on 21 May 2024. Possession is promised by 30 Jun 2027. 80 of the 98 units on this registration are recorded sold or booked, and 6 of 19 construction stages are filed complete.
At a glance
Project
- NameSARANYA SIGNATURE
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/210524/006931
- ReraGenie IDRG-KA-24473
Builder
- NameSaranya Builders
- Entity typePartnership Firm
- GSTIN29ACAFS3866Q2Z8
- Authorized SignatoryY Madhu
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 May 2024
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed170 files
Current status
Figures as on 14 Nov 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 98 | 0 | 98 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 19 construction stages are filed complete. The stage furthest along is Electrification, at 60%.
Building: 52% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 55% |
| Plastering inside , outside & Ceiling | 45% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 25% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 15% |
| Railing and Grill fixing | 40% |
| Electrification, Water supply and Sanitary Finishing | 60% |
| Painting | 15% |
| Fire prevention and fire fighting fitting and fixture with network | 20% |
| Weather Proof work(tile,concrete) | 25% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 25% |
| Elevation work | 30% |
| Internal and External work including landscapes as per sanctioned drawings | 25% |
Progress on shared amenities40
As on 14 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 40% |
| Sewage and Drainage System | Yes | 35% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 25% |
| Energy management | Yes | 25% |
| Fire protection and fire safety requirements | Yes | 28% |
| Solid waste management and disposal | Yes | 25% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 25% |
| Electricity supply transformer and substation | Yes | 30% |
| Storm water drains | Yes | 30% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 33% |
| Parks & Tree planting | Yes | 24% |
| Street Lighting | Yes | 30% |
| Electricity | Yes | 40% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 31% |
| Club House | Yes | 43% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 25% |
| Indoor Sports facility | Yes | 35% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 34% |
| Parks | Yes | 0% |
| Power Backup | Yes | 20% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 38% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 39% |
| Lifts | Yes | 42% |
| Corridor/Lobbies | Yes | 36% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 50% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 42% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 34% |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Saranya Builders | - | - |
| Saranya Builders | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 71.78 cr | Rs 30.82 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | FWD Architects |
| Engineer | Optima Structures PVT Ltd |
| Chartered Accountant | Aggidevara Amaranath |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed170
As listed on the registration, under the names the promoter filed them with; the newest 80 of 170 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/210524/006931 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Upload Notarized Non Litigation AffidavitFile: Non-litigation Affidavit modifide plan Sinature.pdf | 14 Nov 2026 |
| What are all the sources of additional funds to complete the project? With supporting documentsFile: Source of Funds Merged.pdf | 14 Nov 2026 |
| Commencement CertificateFile: CC Merged.pdf | 14 Nov 2026 |
| Promoter need to upload details of new land addedFile: Land cost Declaration Merged_compressed.pdf | 14 Nov 2026 |
| Self Attested Guidance ValueFile: Valuation Govt Rate ( Price Incurd)Builders signature copy.pdf | 14 Nov 2026 |
| Modified Approved Building plan order letterFile: Signature Modified Approved license.pdf | 14 Nov 2026 |
| Old Approved Building plan order letterFile: building license OLD.pdf | 14 Nov 2026 |
| Modified Approved PlanFile: Signature Modified Approved plan.pdf | 14 Nov 2026 |
| Old Approved PlanFile: approved plan OLD.pdf | 14 Nov 2026 |
| Units break up for old approved v/s modified approved plan.File: Signature Unit Wise Break Up For Old & Modified Approved Plan.pdf | 14 Nov 2026 |
| Kindly upload the proper Covering Letter with Reason for ModificationFile: Signature Covering Letter to RERA.pdf | 14 Nov 2026 |
| Kindly upload list of allottees and sold and unsold units details with project name and address alonFile: Signature List Of Allottees.pdf | 14 Nov 2026 |
| Kindly upload list of allottees and sold and unsold units details with project name and address alonFile: Signature Details of Sold & Undold Units As Per Modified Plan.pdf | 14 Nov 2026 |
| Kindly upload 2/3rd consent lettersFile: 23 concent letters merged_compressed.pdf | 14 Nov 2026 |
| Kindly upload 2/3rd consent lettersFile: 24 concent letters merged_compressed.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: Airport NOC.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: BESCOM NOC WITH RECEIPT.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: BSNL NOC WITH RECEIPT.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: BWSSB NOC WITH RECEIPT.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: FIRE NOC.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: HAL NOC.pdf | 14 Nov 2026 |
| Kindly upload revised NOC's for increased unitsFile: pcb noc.pdf | 14 Nov 2026 |
| Kindly upload the revised and elaborate Structural stability certificate mentioning the design criteFile: Signature Stability Certificate-06-Nov-2026.pdf | 14 Nov 2026 |
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4_Q2_CA Certificate_Signature_26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5_Q2_Architect Certificate_Signature_26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6_Q2_Engineer Certificate_Signature_26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Saranya Signature Q1 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect_Q1_ Signature.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Saranya Signature Form -4, fy 25-26 Q4_Signed.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q4).pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6_Scanned Copy_Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Saranya Signature Form -4, fy 25-26 Q3.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q3).pdf | 19 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Signature Form-6 Engineer Q3.pdf | 19 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 19 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 19 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 19 Feb 2026 |
| Q3 2025-26 Fire and Safety | 19 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 19 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 19 Feb 2026 |
| 1. Upload bank affidavit in prescribed formats with notarized.File: Bank Affidavit with Notarized.pdf | 18 May 2024 |
| 2. What are all the sources of funds to complete the project? With supporting documents.File: source of funds_merged_11zon.pdf | 18 May 2024 |
| 3. Upload profit and loss account, balance sheet & ITR, 2020-21, 2021-22 & 2022-23 with CA UDIN alonFile: 3 Years FInancials Signature.pdf | 18 May 2024 |
| 4. Mention three bank account details in CA certificate.File: Bank Account Details updation.pdf | 18 May 2024 |
| 5. Registration fee paid not as per measurement of total area of land.File: Balance Payment Receipt 15330.pdf | 18 May 2024 |
| 6. Upload Chartered accountant KYC and Membership certificate with self-attested.File: CA KYC.pdf | 18 May 2024 |
| 7. As per financial statements borrowing details and unsecured loan details mentioned in sources ofFile: Unsecured loans.pdf | 18 May 2024 |
| 9. Upload quarterly update of previous projectFile: QUARTERLY UPDATE.pdf | 18 May 2024 |
| 1) current year rtcFile: RTC Sy 81 23-24_merged.pdf | 18 May 2024 |
| 2) connected MRFile: MR.pdf | 18 May 2024 |
| 3) authenticated copy of EC from 1-4-2008 to till date issued by sub-registrarFile: EC.pdf | 18 May 2024 |
| 4) conversion order issued by the deputy commissionerFile: Conversion order 78, 81.pdf | 18 May 2024 |
| 5)Advocate Search ReportFile: Legal Opinion.pdf | 18 May 2024 |
| 2)Upload Single plot layout./DPFile: 81 Single plot layout.pdf | 18 May 2024 |
| 3)Upload Single plot layout order.File: Layout Order Signature.pdf | 18 May 2024 |
| 4)Upload certified carpet area calculationFile: Carpet area.pdf | 18 May 2024 |
| 5)Upload CDP map showing the proposed site. and Upload CLU orderFile: CDP map and CLU order.pdf | 18 May 2024 |
| 6)Upload village map showing the proposed site.File: village map 78 81.pdf | 18 May 2024 |
| 7)Upload commencement certificate.File: Commencement Certificate Signature.pdf | 18 May 2024 |
| 8) Built up area / Number of units/ number of floors in the KSPCB noc is not matching with the sanctFile: KSPCB CFE Signature.pdf | 18 May 2024 |
| 9)Upload relinquishment deedFile: RD SY NO 81.pdf | 18 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Free monthly report: Bengaluru on RERA Karnataka, month by month. What registered each month, the flat types and carpet areas being built, the taluks and the completion pipeline, from these same filings.
Buyer report
Built from this project's RERA Karnataka filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Every unit as filed, tower by tower: carpet area, undivided share of the land and parking, with the sizes placed against the other projects of the taluk
- The land chain survey by survey: conversion order, deed, khata and joint development, in date order
- The construction schedule the promoter filed, planned dates against actual ones, item by item
- Joined against the promoter's other registrations on RERA Karnataka, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep SARANYA SIGNATURE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Saranya Builders
Saranya Builders has 2 registrations on RERA Karnataka, including SARANYA SIGNATURE and Saranya Swarovski. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SARANYA SIGNATURE is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SARANYA SIGNATURE?
The registered promoter entity is Saranya Builders, a partnership firm as per the filing. Its GSTIN 29ACAFS3866Q2Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SARANYA SIGNATURE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SARANYA SIGNATURE?
The professionals named in the filing: Architect: FWD Architects; Engineer: Optima Structures PVT Ltd; Chartered Accountant: Aggidevara Amaranath. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARANYA SIGNATURE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback