SARA VATIKA A2 TYPE BUILDING
RG-MH-15941 · RERA P51500051540 · Last updated on MahaRERA portal: 23 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARA VATIKA A2 TYPE BUILDING is a Residential / Group Housing project by SAKAMBARI BUILDCON in Aurangabad, Maharashtra, registered with MahaRERA as P51500051540 on 27 Jun 2023. Possession is promised by 31 Dec 2028.
At a glance
Project
- NameSARA VATIKA A2 TYPE BUILDING
- TypeResidential / Group Housing
- Location
- SHENDRA
- SHENDRA JAHANGIR
- Shendra Kamangar
- Aurangabad
- 431007
- Pincode431007
- RERA no.P51500051540
- ReraGenie IDRG-MH-15941
Builder
- NameSAKAMBARI BUILDCON
- Entity typePartnership
- PartnersRUPESH SITARAM AGRAWAL, SITARAM RATANLAL AGRAWAL
- Other registrations3 more →
- Completed2 of 4
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A2 BUILDING | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
A2 BUILDING: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed93
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMOL KSHIRSAGAR |
| Engineer | MANGESH POTDAR |
| Engineer | ER UJWAL SANAP |
| Chartered Accountant | YOGESH J AGRAWAL AND CO COHARTED ACCOUNTANTS |
| Partner | Role in project |
|---|---|
| SAKAMBARI BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 _ VATIKA A2.pdf | 23 May 2026 |
| Form 2File: FORM 2 _VATIKA A2.pdf | 23 May 2026 |
| Form 3File: VATIKA A-2 FORM 3.pdf | 23 May 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSER_VATIKA A2.pdf | 23 May 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_Sakambari Buildcon_Sara Vatika A2 Type Building.pdf | 9 Apr 2026 |
| Form 1File: Form 1 _ Sara Vatika A2.pdf | 29 Jan 2026 |
| Form 2File: Form 2 _ Sara Vatika A2.pdf | 29 Jan 2026 |
| Form 3File: Form 3 Diclaration_ Sara Vatika A2.pdf | 29 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser _ Sara Vatika A2.pdf | 29 Jan 2026 |
| Form 1File: 1 Form 1 Vatika A2 Jun-25.pdf | 31 Dec 2025 |
| Form 2File: 2 Form 2 VAtika A2 Jun-25.pdf | 31 Dec 2025 |
| Form 3File: 3 Form 3 Vatika A2 Jun-25.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Sold Vatika A2 Jun-25.pdf | 31 Dec 2025 |
| Form 1File: 1 Form 1 Vatika A2 Sept-25.pdf | 31 Dec 2025 |
| Form 2File: 2 Form 2 Vatika A2 Sept-25.pdf | 31 Dec 2025 |
| Form 3File: 3 Form 3 Vatika A2 Sept-25.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Sold Vatika A2 Sept-25.pdf | 31 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sara Vatika A2 Form-1 March 25.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Vatika A2 Form-2 March 25.pdf | 2 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA Certificate of Vatika A2 -310325.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 19-01-25.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 19-01-25.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1 MARCH_24 VATIKA A2.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1 JUN_24 VATIKA A2.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1 SEPT_24 VATIKA A2.pdf | 19 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2 MARCH_24 VATIKA A2.pdf | 19 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2 JUN_24 VATIKA A2.pdf | 19 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2 SETP_24 VATIKA A2.pdf | 19 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Vatika A2.pdf | 19 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sara Vatika A2 Type 51540 23-24.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA_Form-3_Sara Vatika_A2 Bldg.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1 Dec 2023.pdf | 10 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf | 10 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sara Vatika A2 Bldg From -3.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ( 30-09-2023 ).pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Cert.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SARA VATIKA.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51500025439 Sara Vatika.pdf | 14 Oct 2023 |
| Layout approvalFile: Sara Vatika A2 Layout Plan.pdf | 6 Jun 2023 |
| Building plan approvalFile: Sara Vatika A2 Building Plan.pdf | 6 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: Sara Vatika A2 Layout Plan.pdf | 6 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sara Vatika A2 Building Plan.pdf | 6 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Sara Vatica A2 Certificate.pdf | 6 Jun 2023 |
| Declaration about Commencement CertificateFile: Format D Sara Vatika A2.pdf | 6 Jun 2023 |
| Other - FinanceFile: sara vatika sakambari buildcon.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Sara Vatika A2 Building.pdf | 9 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sitaram sir.pdf | 9 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RUPESH_compressed.pdf | 9 Mar 2023 |
| CERSAI detailsFile: CERSAI NOTE.pdf | 15 Feb 2023 |
| Proforma of Agreement for saleFile: Model Form of Agreement.pdf | 15 Feb 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 15 Feb 2023 |
| PAN CardFile: 1 PAN Card.pdf | 6 Feb 2023 |
| Copy of the legal title reportFile: SEARCH REPORT_compressed.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: FIN ENC.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENC.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to LegalFile: FIN ENC.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to LegalFile: LEGAL ENC.pdf | 6 Feb 2023 |
| Declaration in FORM BFile: FORM B.pdf | 6 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSER PROMOTER_compressed.pdf | 6 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DISCLOSER.pdf | 6 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT DEVIATION.pdf | 6 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: ATS DEVIATION.pdf | 6 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SARA VATIKA A2 TYPE BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHENDRA JAHANGIR1,400+ in Aurangabad
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: SAKAMBARI BUILDCON
SAKAMBARI BUILDCON has 4 registrations on MahaRERA, including SARA VATIKA and SARA VATIKA A3 AND A4 TYPE BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if SARA VATIKA A2 TYPE BUILDING is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARA VATIKA A2 TYPE BUILDING?
The registered promoter entity is SAKAMBARI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARA VATIKA A2 TYPE BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARA VATIKA A2 TYPE BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARA VATIKA A2 TYPE BUILDING?
The professionals named in the filing: Architect: AMOL KSHIRSAGAR; Engineer: MANGESH POTDAR; Engineer: ER UJWAL SANAP; Chartered Accountant: YOGESH J AGRAWAL AND CO COHARTED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARA VATIKA A2 TYPE BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback