Home / Browse projects / Pune, Maharashtra / SARA SWAPNAVIHAR
SARA SWAPNAVIHAR
RG-MH-84372 · RERA P52100019508 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 5 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARA SWAPNAVIHAR is a Residential / Group Housing project by Jagrutsara Structures LLP in Pune, Maharashtra, registered with MahaRERA as P52100019508 on 6 Feb 2019. Possession was promised by 30 Jun 2026 and is now 4 months past that date.
At a glance
Project
- NameSARA SWAPNAVIHAR
- TypeResidential / Group Housing
- Location
- CHAKAN TALEGAON ROAD
- CHAKAN
- Kharabwadi (CT)
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100019508
- ReraGenie IDRG-MH-84372
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Feb 2019
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings3 building records
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C6 BUILDING | NA | 13 | 12 | 0 | 0 | 0 |
| C7 BUILDING | NA | 13 | 12 | 0 | 0 | 0 |
| C1 BUILDING | NA | 14 | 12 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
C6 BUILDING80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
C7 BUILDING77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
C1 BUILDING87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ADVANTAGE ARCHITECT DESIGN ARCHITECT |
| Architect | ABS ARCHITECT LISIONING ARCHITECT |
| Engineer | SUHAS HATTIKAR |
| Partner | Role in project |
|---|---|
| Jagrutsara Structures LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM-1 Sara Swapnavihar.pdf | 5 Jun 2026 |
| Form 2File: FORM-2 Sara Swapnavihar.pdf | 5 Jun 2026 |
| Form 3File: Form 3 Declartion with form 3.pdf | 5 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold - Sara Swapnavihar 31-03-2026_compressed.pdf | 5 Jun 2026 |
| Form 1File: FORM 1 SARA SWAPNAVIHAR_260513_165536.pdf | 19 May 2026 |
| Form 2File: FORM-2 Sara Swapnavihar_260513_065242.pdf | 19 May 2026 |
| Form 3File: RERA CA Certificate for JSS LLP_Swapanavihar Dec 2025pdf.pdf | 19 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Sara Swapnavihar 31-12-2025_compressed.pdf | 19 May 2026 |
| Form 1File: FORM -1 18-10-2025.pdf | 11 Apr 2026 |
| Form 2File: FORM - 2 18-10-2026.pdf | 11 Apr 2026 |
| Form 3File: Form 3 Sep 2025 declaration.pdf | 11 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Compressed.pdf | 11 Apr 2026 |
| Form 1File: FORM -1.pdf | 10 Oct 2025 |
| Form 2File: FORM-2_0001.pdf | 10 Oct 2025 |
| Form 3File: RERA CA Certificate for JSS LLP_Swapanavihar_C1,C6 & C7.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold-Unsold March2025_compressed.pdf | 10 Oct 2025 |
| Form 1File: FORM-1 Sara Swapnavihar June 2025.pdf | 10 Oct 2025 |
| Form 2File: FORM2 Sara Swapnavihar June.pdf | 10 Oct 2025 |
| Form 3File: Form3 Self Declaration June 2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold-Unsold Sara Swapnavihar June2025_compressed.pdf | 10 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_0001.pdf | 27 Mar 2025 |
| Certificates of CA (Form 3)File: RERA CA Certificate for JSS LLP_Swapanavihar_C1C6 C7_Dec24.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sara Swapnavihar.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 SARA SWAPNAVIHAR DEC.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: December FORM-2.pdf | 9 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_JSS LLP_Sara Swapnavihar .pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch .pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Engg.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: RERA Form-3.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch .pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: RERA Form-3.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Engg.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sara Swapnvihar.pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sara Swapnavihar Form 1 mar 2024.pdf | 22 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Swapnavihar Form 2 Engg Mar 2024.pdf | 22 Jun 2024 |
| Certificates of CA (Form 3)File: 3 Form 3 - Declaration Mar 24.pdf | 22 Jun 2024 |
| Certificates of CA (Form 3)File: Sara Swapnvihar Form-3_compressed.pdf | 5 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Sep 2023.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Dec 2023.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Swapnavihar Form 2 Engg SEP 2023.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Swapnavihar Form 2 Engg DEC 2023.pdf | 2 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Details - Sara Swapnavihar Dec 2023_compressed.pdf | 2 Feb 2024 |
| Certificates of CA (Form 3)File: 16 Form 3 Declaration Sep 2023.pdf | 2 Feb 2024 |
| Certificates of CA (Form 3)File: 16 Form 3 Declaration Dec 2023.pdf | 2 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P52100019508 Jagrutsara Sara Swapnavihar.pdf | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 27 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SARA SWAPNAVIHAR_0001.pdf | 27 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A SARA SWAPNAVIHAR_0001.pdf | 27 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Sara Swapnavihar_compressed.pdf | 27 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality.pdf | 19 Jun 2023 |
| Proforma of Agreement for saleFile: AGREEMENT DRAFT_SARA SWAPNAVIHAR_JAGRUTSARA STRUCTURES LLP.pdf | 29 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECTS CERTIFICATE_0001_220616_114048_compressed.pdf | 17 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost_compressed.pdf | 14 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality.pdf | 14 Jun 2022 |
| Declaration about Commencement CertificateFile: Format D Swapnavihar.pdf | 30 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Swapnavihar.pdf | 30 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sara Swapnavihar Form2.pdf | 30 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sara Swapnavihar.pdf | 30 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Discloser of Booking_compressed.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5 Zapan.pdf | 20 Sep 2021 |
| Building plan approvalFile: Layout Compressed.pdf | 19 Feb 2020 |
| Building Plan Approval (IOD)File: Layout Compressed.pdf | 19 Feb 2020 |
| Certificates of CA (Form 3)File: CA CERT Uploaded.pdf | 19 Feb 2020 |
| Building plan approvalFile: Layout New.pdf | 31 Jan 2020 |
| Building Plan Approval (IOD)File: Layout New.pdf | 31 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: comencment certificate_compressed.pdf | 31 Jan 2020 |
| Declaration in FORM BFile: New Form B_compressed.pdf | 31 Jan 2020 |
| Form 2AFile: Sara City C ph Form 2A.pdf | 7 Jun 2019 |
| Layout approvalFile: LAYOUT.pdf | 31 Jan 2019 |
| Building plan approvalFile: LAYOUT.pdf | 31 Jan 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 31 Jan 2019 |
| Building Plan Approval (IOD)File: LAYOUT.pdf | 31 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 30 Jan 2019 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 30 Jan 2019 |
| Proforma of Allotment letterFile: Agreement to sale.pdf | 30 Jan 2019 |
| Copy of the legal title reportFile: Legal Title report.pdf | 18 Jan 2019 |
| Details of encumbrancesFile: Encumberance details.pdf | 15 Jan 2019 |
| Declaration in FORM BFile: SARA C-PHASE FORM -B.pdf | 15 Jan 2019 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SARA ORCHID | RANUBAI MALA CHAKAN | 490 | Completed | Apr 2017 | Apr 2017 |
| SARA PARIVARTAN SECTOR D | SAWANGI AURANGABAD | 238 | Completed | Apr 2016 | Feb 2016 |
| SARA PARIVARTAN SECTOR C | SAWANGI AURANGABAD | 336 | Completed | Aug 2014 | Jun 2014 |
| SARA CITY - B PHASE | KHARABWADI CHAKAN | 528 | Completed | Mar 2012 | Mar 2012 |
| SARA CITY - A PHASE | KHARABWADI CHAKAN | 248 | Completed | Mar 2012 | Mar 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SARA SWAPNAVIHAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHAKAN13,700+ in Pune
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: Jagrutsara Structures LLP
Jagrutsara Structures LLP has 25 registrations on MahaRERA, including SARA GOKULDHAM - A BUILDING and SARA PARIVARTAN - SECTOR E. Its filings disclose 12 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SARA SWAPNAVIHAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SARA SWAPNAVIHAR is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARA SWAPNAVIHAR?
The registered promoter entity is Jagrutsara Structures LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARA SWAPNAVIHAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARA SWAPNAVIHAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARA SWAPNAVIHAR?
The professionals named in the filing: Architect: ADVANTAGE ARCHITECT DESIGN ARCHITECT; Architect: ABS ARCHITECT LISIONING ARCHITECT; Engineer: SUHAS HATTIKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARA SWAPNAVIHAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback