SARA PARIVARTAN SECTOR A
RG-MH-07876 · RERA P51500016167 · Last updated on MahaRERA portal: 30 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARA PARIVARTAN SECTOR A is a Residential / Group Housing project by SARA PROPERTIES in Aurangabad, Maharashtra, registered with MahaRERA as P51500016167 on 20 Apr 2018. Possession was promised by 31 Oct 2025 and is now 12 months past that date. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameSARA PARIVARTAN SECTOR A
- TypeResidential / Group Housing
- Location
- NAYGAON ROAD
- SAWANGI
- Aurangabad
- 431007
- Pincode431007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500016167
- ReraGenie IDRG-MH-07876
Builder
- NameSARA PROPERTIES
- Entity typePartnership
- PartnersSITARAM RATANLAL AGRAWAL, RUPESH SITARAM AGRAWAL, NILESH SITARAM AGRAWAL
- Other registrations8 more →
- Completed5 of 9
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Apr 2018
- Promised completion31 Oct 2025
- Revised completionRevised to 31 Oct 2025 (originally 30 Oct 2022)
- Buildings6 building records
- Documents filed51 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| K TYPE BUILDING WING 1-2 | NA | 10 | 0 | 0 | 0 | 0 |
| J TYPE BUILDING WING 3-4-5 | NA | 10 | 0 | 0 | 0 | 0 |
| I TYPE BUILDING WING 6-7 | NA | 10 | 0 | 0 | 0 | 0 |
| I TYPE BUILDING WING 8-9 | NA | 10 | 0 | 0 | 0 | 0 |
| I TYPE BUILDING WING 10-11 | NA | 10 | 0 | 0 | 0 | 0 |
| I TYPE BUILDING WING 12-13 | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 30 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.
K TYPE BUILDING WING 1-291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
J TYPE BUILDING WING 3-4-591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I TYPE BUILDING WING 6-791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I TYPE BUILDING WING 8-991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I TYPE BUILDING WING 10-1191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I TYPE BUILDING WING 12-1391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| K TYPE BUILDING WING 1-2 | 8 | 8 |
| J TYPE BUILDING WING 3-4-5 | 12 | 12 |
| I TYPE BUILDING WING 6-7 | 8 | 8 |
| I TYPE BUILDING WING 8-9 | 8 | 8 |
| I TYPE BUILDING WING 10-11 | 8 | 8 |
| I TYPE BUILDING WING 12-13 | 8 | 8 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANAND DESHPANDE |
| Engineer | NAMDEV G KARKHANE |
| Partner | Role in project |
|---|---|
| SARA PROPERTIES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have applied for completion of project but due to technical issue at Authority WE NEED EXTENSION WE HAVE UPDATED CONSENT OF ALLOTTEES TOO.
Reason as filed by the promoterWe are near to completion of Project... But due Some Technical Difficulities we required more time to complete the project. Hence required Extension till 29/10/2023
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sara Parivartan Sector A Form-1 12-April-24.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sara Parivartan Sector A Form-2 12-April-24.pdf | 30 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sar Parivartan Sector A Form-2A 14-April-24.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sara Parivartan Sector A Sold-31-March-24.pdf | 30 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2023.pdf | 26 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2023.pdf | 26 May 2024 |
| Declaration in FORM BFile: Form B.pdf | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2022_compressed.pdf | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2023_compressed.pdf | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 July 2023_compressed.pdf | 8 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 2023_compressed.pdf | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC 2022.pdf | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH 2023.pdf | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUNE 2023.pdf | 8 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEP 2023.pdf | 8 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 8 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 22-23.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold ( 30-09-2023 )_compressed.pdf | 8 Nov 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DECLARATION DEED (1) (1)_removed.pdf | 2 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51500016167 Sara Parivartan Sector A.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Adobe Scan Jun 23, 2022 (3).pdf | 13 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration of CC - Parivartan A.pdf | 30 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Pariv A_compressed.pdf | 30 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Bookings - Pariv A_compressed.pdf | 30 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A sara parivartan sector A.pdf | 20 Mar 2020 |
| Details of encumbrancesFile: Index 2.pdf | 9 Sep 2019 |
| Details of encumbrancesFile: new mortgage letter.pdf | 9 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ENGINEER CERTIFICATE SARA PARIVARTAN SEC A.pdf | 16 Nov 2018 |
| Certificates of CA (Form 3)File: FORM 3 - CA CERTIFICATE SARA PARIVARTAN SEC A Compressed.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: FORM 5 - SARA PARIVARTAN SEC A.pdf | 16 Nov 2018 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 13 Apr 2018 |
| Proforma of Allotment letterFile: SECTOR-A-ATS.pdf | 13 Apr 2018 |
| Layout approvalFile: LAY-OUT.pdf | 12 Apr 2018 |
| Building plan approvalFile: K TYPE BUILDING WING -1,2.pdf | 12 Apr 2018 |
| Building plan approvalFile: J TYPE BUILDING WING -3-4-5.pdf | 12 Apr 2018 |
| Building plan approvalFile: I TYPE BUILDING WING -6,7,-10,11.pdf | 12 Apr 2018 |
| Building plan approvalFile: I TYPE BUILDING -8,9,12,13.pdf | 12 Apr 2018 |
| PAN CardFile: PROPERTIES PAN CARD-compressed.pdf | 12 Apr 2018 |
| Details of encumbrancesFile: index 2 a sector.pdf | 12 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: LAY-OUT.pdf | 12 Apr 2018 |
| Building Plan Approval (IOD)File: K TYPE BUILDING WING -1,2.pdf | 12 Apr 2018 |
| Building Plan Approval (IOD)File: J TYPE BUILDING WING -3-4-5.pdf | 12 Apr 2018 |
| Building Plan Approval (IOD)File: I TYPE BUILDING WING -6,7,-10,11.pdf | 12 Apr 2018 |
| Building Plan Approval (IOD)File: I TYPE BUILDING -8,9,12,13.pdf | 12 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: commencment certificate.pdf | 12 Apr 2018 |
| Declaration in FORM BFile: form b a sector.pdf | 12 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archite certi.pdf | 12 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: enginer certif.pdf | 12 Apr 2018 |
| Certificates of CA (Form 3)File: ca certi (1).pdf | 12 Apr 2018 |
| Proforma of Allotment letterFile: allotment letter.pdf | 12 Apr 2018 |
| OtherFile: additional affidavit sector a.pdf | 12 Apr 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SARA PARIVARTAN SECTOR A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAWANGI1,400+ in Aurangabad
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: SARA PROPERTIES
SARA PROPERTIES has 9 registrations on MahaRERA, including SARA PARIVARTAN - SECTOR B - PHASE 1 and SARA SAMRUDDHI - PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that SARA PARIVARTAN SECTOR A shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SARA PARIVARTAN SECTOR A is delayed beyond 31 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARA PARIVARTAN SECTOR A?
The registered promoter entity is SARA PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARA PARIVARTAN SECTOR A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARA PARIVARTAN SECTOR A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARA PARIVARTAN SECTOR A?
The professionals named in the filing: Architect: ANAND DESHPANDE; Engineer: NAMDEV G KARKHANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARA PARIVARTAN SECTOR A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback