Sara Kasturi Building B
RG-MH-23160 · RERA P52100032693 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sara Kasturi Building B is a Residential / Group Housing project by JAGRUTSARA STRUCTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100032693 on 24 Jan 2022. Possession is promised by 31 Mar 2027.
At a glance
Project
- NameSara Kasturi Building B
- TypeResidential / Group Housing
- Location
- Chakan Talegaon road
- Chakan
- Chakan (CT)
- Khed
- Pune
- 410501
- Pincode410501
- RERA no.P52100032693
- ReraGenie IDRG-MH-23160
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2022
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sara Kasturi Building B | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
Sara Kasturi Building B: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABS Architects and Associates |
| Architect | Advantage Architecture |
| Engineer | Spectrum Consultants |
| Engineer | ER ARVIND GURAV |
| Chartered Accountant | Yogesh J Agrawal & Co |
| Partner | Role in project |
|---|---|
| JAGRUTSARA STRUCTURES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM-1 Sara Kasturi B.pdf | 24 Jun 2026 |
| Form 2File: FORM-2 Kasturi B.pdf | 24 Jun 2026 |
| Form 3File: Self-Declaration Form 3 Kasturi -B.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold - Sara Kasturi B.pdf | 24 Jun 2026 |
| Form 2A (FY 2023-2024)File: FORM -2A Sara Kasturi Bldg B.pdf | 14 May 2026 |
| Form 1File: FORM -1 Sara Kasturi B 16-01-2026.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Sara Kasturi -B.pdf | 24 Apr 2026 |
| Form 3File: Form 3 Declaration Sara Kasturi -B.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold Sara Kasturi -B 31-12-2025.pdf | 24 Apr 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_JSS LLP_Sara Kasturi-B.pdf | 10 Mar 2026 |
| Form 1File: Form 1 - Architect's Kasturi B SEP 2025.pdf | 29 Nov 2025 |
| Form 2File: Form 2 - Engineer's Certificate SEP 2025 Sara kasturi B.pdf | 29 Nov 2025 |
| Form 3File: Form 3 Declaration sep Kasturi B Sep 2025.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser of bookings Kasturi -B Sep 2025.pdf | 29 Nov 2025 |
| Form 1File: FORM-1 Sara Kasturi B March 2025.pdf | 11 Oct 2025 |
| Form 2File: FORM2 Sara Kasturi B March.pdf | 11 Oct 2025 |
| Form 3File: RERA form-3 of Sara Kasturi B Building-310325.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SARA KASTURI B BLDG MARCH 2025_compressed.pdf | 11 Oct 2025 |
| Form 1File: FORM-1 Sara Kasturi B June 2025.pdf | 11 Oct 2025 |
| Form 2File: SARA KASTURI B BLDG FORM2 JUNE 2025.pdf | 11 Oct 2025 |
| Form 3File: Form3 Declaration Sara kasturi B bldg.pdf | 11 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Sara Kasturi B bldg June.pdf | 11 Oct 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sara Kasturi B bldg.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SARA KASTURI B bldg DEC.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 December Kasturi B.pdf | 9 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kasturi B form-3 of Sara Kasturi B Building.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Bldg B March.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Bldg B Jun.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Bldg B Sep.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bldg B March.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bldg B Jun.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bldg B Sep.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Bldg B March.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Bldg B Jun.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 bldg B Sep.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 bldg B Sep.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_JSS LLP_Sara Kasturi-B.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SARA KASTURI B BLDG - FORM 1.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SARA KASTURI B BLDG.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD B BLDG_compressed.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SARA KASTURI B BLDGI SELF SECLARATION FORM 3_0001.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SARA KASTURI BUILDING B.pdf | 26 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- Sara Kasturi B Building.pdf | 26 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P52100032693 Jagrutsara Sara Kasturi B.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sara Kasturi B (April).pdf | 14 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sara Kasturi B (June).pdf | 14 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SARA KASTURI BLDG B Apr 2023.pdf | 14 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SARA KASTURI BLDG B Jun 2023.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM- 2A SARA KASTURI BLDG B.pdf | 14 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD- UNSOLD INVENTORY- SARA KASTURI BLDG B_compressed.pdf | 14 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Sara Kasturi Building B_compressed.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FOMR 2 A JUNE 2022.pdf | 3 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE -FORM 1 March 2022_compressed.pdf | 10 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SARA KASTURI BUI B_0001_compressed.pdf | 10 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A SARA KASTURI BUI-B Dec 2021.pdf | 10 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A SARA KASTURI BUI B MArch 2022.pdf | 10 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A SARA KASTURI BUI June 2022.pdf | 10 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD-SARA KASTURI BUI-B_0001_compressed.pdf | 10 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200228172787_For_Asset_Based_Search_16_01_2022_15_50_48_209.pdf | 16 Jan 2022 |
| Details of encumbrancesFile: JSLLP-TO WHOM IT MAY CONCERN_0001_compressed.pdf | 15 Jan 2022 |
| Declaration about Commencement CertificateFile: JSLLP-FORMAT-D_0001.pdf | 15 Jan 2022 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 14 Jan 2022 |
| Layout approvalFile: Layot.PDF | 13 Jan 2022 |
| Building plan approvalFile: NA ORDER KASTURI.pdf | 13 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: Layot.PDF | 13 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER KASTURI.pdf | 13 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 13 Jan 2022 |
| Declaration in FORM BFile: FORM B KASTURI.pdf | 13 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS CERTIFICATE.pdf | 13 Jan 2022 |
| Proforma of Allotment letterFile: Allotment letter for sara kasturi.pdf | 13 Jan 2022 |
| Proforma of Allotment letterFile: Kasturi agreement.pdf | 13 Jan 2022 |
| PAN CardFile: PAN CARD JAGRUTSARA STRUCTURES LLP.pdf | 8 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 24 other registrations, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sara Kasturi Building B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chakan13,700+ in Pune
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: JAGRUTSARA STRUCTURES LLP
Jagrutsara Structures LLP has 25 registrations on MahaRERA, including SARA GOKULDHAM - A BUILDING and SARA PARIVARTAN - SECTOR E. Its filings disclose 12 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sara Kasturi Building B is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sara Kasturi Building B?
The registered promoter entity is JAGRUTSARA STRUCTURES LLP, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sara Kasturi Building B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sara Kasturi Building B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sara Kasturi Building B?
The professionals named in the filing: Architect: ABS Architects and Associates; Architect: Advantage Architecture; Engineer: Spectrum Consultants; Engineer: ER ARVIND GURAV; Chartered Accountant: Yogesh J Agrawal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sara Kasturi Building B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback